| 1 | L1₹3.4 LAdmitted-Finance | +4.50% | ₹3.4 L | L1 | Admitted-Finance |
| 2 | L1₹3.4 LAdmitted-Finance NEAR RANGUNI RAILWAY GATE BHULI DHANBAD DHANBAD 828105 JHARKHAND INDIA | DHANBAD | DHANBAD | JHARKHAND | 828105 | +4.50% | ₹3.4 L | L1 | Admitted-Finance |
| 3 | Rejected-Technical A S GIRLS SCHOOL ROAD HIRAPUR DHANBAD DHANBAD 826001 JHARKHAND INDIA | DHANBAD | DHANBAD | JHARKHAND | 826001 | - | - | - | Rejected-Technical Rejected |
Tender Value
Refer Docs
EMD Value
₹4,100
Closing Date
10 Mar 2026, 6:30 pmClosed
AREA MANAGER (ENM), BARORA AREA
ENM Department, Office of the General Manager, Barora Area, Nawagarh, Dhanbad
(A) Rewinding of 160KW 550V, Motor Kirloskar make Sl.No.29412213-2 of Phularitand CHP (B) complete rewinding/repairing of 10KVA, 3.3KV/220Volts Transformer installed at Phularitand OCP, AMP Colliery under Barora Area.
2026_BCCL_354769_1
BCCL/GM/AR-1/AM (ENM)/E-TENDER/2025-26/414
Open Tender
Electrical and Maintenance Works
15 days
AMP COLLIERY, BARORA AREA
Please refer Tender documents.
6 documents required · 6 mandatory
₹4,100
20 Mar 2026
27 Feb 2026
11 Mar 2026
27 Feb 2026
10 Mar 2026
27 Feb 2026
27 Feb 2026 - 2 Mar 2026
Complete repairng of stator & rotor of 160KW Motor
Complete repairng of stator: Dismantling of both side end cover grease cap etc. and after rewinding, refitting the same
Dismantling of old coils
Slot cleaning and varnishing
New super enameled copper wire (48coils x2.6Kg.) minus scrap copper value @400/- i.e.(1000-400=600/-Kg.)
Varnish
Slot insulation paper
cotton tape
Glass tape
Providing of wedges
Soldering materials
Connection lead
Heating charges
Ampere tube
Glass cloth
Labour charges for coil making and rewinding
Complete repairng of stator: Dismantling of both side ring with the help gas cutter
Dismantling of rotor bar from the slots
Providing and fitting of new bar for rotor in place of existing bar @1000/-minus less scrap 400/-
Providing of copper rotor ring new @1000/- minus less scrap 400/-
Machining of both side ring
Both side breezing with rotor bars
Silver breezing rod
Dismantling of both side bearing and fitting
Both side bearing housing for new slip new casting and machining and fitting
Rotor balancing
Providing of new bearing 6319
Welding and machining of both side end cover
Grease
complete rewinding/repairing of 10KVA, 3.3KV/220Volts Transformer
New Electrolytic copper wire @1000/-per kg. (less scrap value adjusted@400/-per kg.)
Re-insulation with DP covering for primary and secondary Coils
Soldering materials
Insulating materials
Cork sheet for top cover bushings etc.
Transtörmer Oil Filtrations
Energy charges for heating
Primary side bushing
Secondary side bushing
Tank cleaning and paintings
Labour charges
Total impact of GST for the purpose of CTC
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.48 MB
BOQ_367598.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid