| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 LAccepted-Finance 61 3134 1ST FLOOR MATHA ARCADE KSN MENON ROAD VRM ROAD JN RAVIPURAM KOCHI 682016 | KOCHI | ERNAKULAM | KERALA | 682016 | ₹5.1 L | L1 | Accepted-Finance L1 |
| 2 | L2₹6.0 LAccepted-Finance | ₹6.0 L | L2 | Accepted-Finance L2 |
| 3 | L3₹6.1 LAccepted-Finance SHARON O2 2 O STREET JAWAHAR NAGAR KOWDIAR THIRVANTHAPURAM | THIRUVANANTHAPURAM | THIRUVANANTHAPURAM | KERALA | ₹6.1 L | L3 | Accepted-Finance L3 |
Tender Value
₹6.3 L
EMD Value
₹15,700
Closing Date
20 Jun 2026, 5:00 pmClosed
Executive Engineer
Office of the Executive Engineer Project Management Unit Power House Road Ernakulam
Laying of HT UG Cable from West end Transformer to Padam Transformer and installing DP at YJ 15
2026_KSEB_849103_1
EP-03/2026-27/PMU-EKM/
Open Tender
Electrical Works
Percentage
90 days
Palarivattom
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,600
₹15,700
13 Aug 2026
30 Apr 2026
26 Jun 2026
30 Apr 2026
20 Jun 2026
2 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Laying of 11KV UG Cable by Horizontal Directional Drilling method | - | m | - | - |
| 2 | Doing one cable end termination on HT XLPE UG cables of sizes beyond 3x185 sqmm and upto and including 3x300 sq mm using the cable jointing kit supplied departmentally after making fencing,caution board and all other safety measures including charges for cable jointer etc. complete as per the direction of the departmental officers. | - | No | - | - |
| 3 | Mounting and connecting HT XLPE UG cable ends of all sizes upto and including 3x300 sq mm with special type cable clamps, bolts, nuts, terminal protectors etc.including cost of extra materials if needed and giving necessary jumper connections. | - | No | 1 | - |
| 4 | Loading HT PSC pole to Hand cart from the stacking place and unloading the same at work site (excluding transportation). | - | No | - | - |
| 5 | Transporting one HT PSC pole by Hand cart - normally limited to 4km (excluding loading and unloading). | - | E*km | - | - |
| 6 | Fitting and erecting one HT Double Pole Structure using PSC pole in position including fitting 2 channel cross arms, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing). | - | No | 1 | - |
| 7 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite. | - | No | 1 | - |
| 8 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP including conveyance of materials. | - | No | 1 | - |
| 9 | Fitting one Additional V cross arm in existing single pole including conveyance of materials. | - | No | 1 | - |
| 10 | Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at a minimum distance of 1.5m away from the pole/structure and maintaining standard distance between different earth pipes in ordinary soil & backfilling. | - | No | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
TenderdocPalarivattom.pdf
Tender Documents • 1.71 MB
BOQ_1434835.xls
BOQ • 0.31 MB
Datecorrigendum-03.pdf
PDF • 0.51 MB
DatecorrigendumEP03.pdf
PDF • 0.51 MB
Datecorrigendum.pdf
PDF • 0.73 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].