Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.3 CrAdmitted-Finance | -45.99% | ₹2.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.7 CrAdmitted-Finance | -35.00% | ₹2.7 Cr | L2 | Admitted-Finance |
| 3 | L3₹2.9 CrAdmitted-Finance | -30.00% | ₹2.9 Cr | L3 | Admitted-Finance |
| 4 | L4₹3.1 CrAdmitted-Finance | -26.60% | ₹3.1 Cr | L4 | Admitted-Finance |
| 5 | L5₹3.4 CrAdmitted-Finance | -18.01% | ₹3.4 Cr | L5 | Admitted-Finance |
Tender Value
₹4.2 Cr
EMD Value
₹8.4 L
Closing Date
16 Jun 2026, 4:00 pmClosed
Chief Engineer PWD RNB UT Ladakh
Chief Engineer PWD RNB UT Ladakh
Construction of Multi Utility Center At Zanskar.
2026_PWD_18957_2
Fresh E-07 PWRNBZDA 2026-27
Open Tender
Civil Works - Others
540 days
Zanskar
Please refer Tender documents.
4 documents required · 4 mandatory
₹4,300
Ex. Engineer PWDRNB Zanskar
₹8.4 L
30 Jun 2026
20 May 2026
19 Jun 2026
20 May 2026
16 Jun 2026
21 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth WorK:-Excavation work in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains (not exceeding 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. (A) All kind of soil. | 306.28 | cum | 245 | ₹75,038.6 |
| 2 | Ordinary rock | 204.18 | Cum | 370 | ₹75,546.6 |
| 3 | Filling available excavated earth (excluding rock) in trenches plinth, sides of foundation etc in layer not exceeding 20cm in depth consolidating each deposited layer by ramming and watering, lead upto 50cm and lead up to 50 m and lift upto 1.5 mtr. | 204.19 | Cum | 220 | ₹44,921.8 |
| 4 | Dumping stone in horizontal on level in plinth excluding cost of stone | 61.26 | Cum | 230 | ₹14,089.8 |
| 5 | Providing and laying of stone soling/pitching/ dumping including cost of stone horizontal on level by hand packed tightly including all sort of complete. | 65.91 | Cum | 450 | ₹29,659.5 |
| 6 | Providing and laying position cement concrete of specified grade excluding the cost of centering and shuttering. All work upto plinth level 1:4:8 (1 cement : 4 coarse sand (zone-III) derived from natural source: 8 graded stone aggregate 20 mm nominal size)derived from natural sources. | 50.62 | Cum | 5,800 | ₹2,93,596 |
| 7 | Providing and laying position cement concrete of specified grade excluding the cost of centering and shuttering. All work upto plinth level 1:3:6 (1 cement : 3 coarse sand (zone-III) derived from natural source: 6 graded stone aggregate 20 mm nominal size)derived from natural sources. | 150.11 | Cum | 6,500 | ₹9,75,715 |
| 8 | Cement concrete flooring 1:2:4 (1 cement :2 coarse sand :4 graded stone aggregate) finished with a floating coat neat cement including cement slurry, but excluding the cost of nosing of steps etc. complete 50mm thick with 20mm nominals size stone aggregate. | 1,781.1 | sqm | 520 | ₹9,26,172 |
| 9 | Dry random rubble masonry with hard stone in foundation and plinth:With bond stone, quarry stone | 34.66 | cum | 3,930.63 | ₹1,36,235.64 |
| 10 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1.5:3 (1 cement : 1.5 coarse sand : 3graded stone aggregate 20 mm nominal size) cruched | 85.52 | Cum | 11,000 | ₹9,40,720 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.35 MB
BOQ_45281.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid