Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹64,417.39Accepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹65,766.92+₹1,349.53 (2.09%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | VENUGOPALAN L1 | CHAMI L2 |
|---|---|---|---|---|---|
| 1.00Soak Pit construction-Koranchira anganwadi | |||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 0.76 | cum | 359.7 ₹274.45 Lowest | 360 ₹274.68 |
| 1.00 | OD271613/2025-2026:Providing and fixing ready made concrete soak pit 90cm diameter and 30cm depth including conveyance fixing and labour etc | 4 | no | 1,045.35 ₹4,181.4 Lowest | 1,100 ₹4,400 |
| 1.00 | 50.18.9.7.2:Providing and fixing PVC pipes includings jointing of pipes with one step PVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge.63 mm dia 4 Kgf/cm2 | 10 | metre | 348.35 ₹3,483.5 Lowest | 360 ₹3,600 |
| 2.00Adakkaputhur anganwadi-I | |||||
| 2.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 0.34 | cum | 359.7 ₹121.94 Lowest | 360 ₹122.04 |
| 2.00 | OD272627/2025-2026:Providing and fixing ready made concrete soak pit 60 cm diameter and 60 cm depth including conveyance fixing and labour etc.. | 2 | 1 nos | 3,019.9 ₹6,039.8 Lowest | 3,050 ₹6,100 |
| 2.00 | 50.18.9.7.2:Providing and fixing PVC pipes includings jointing of pipes with one step PVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge.63 mm dia 4 Kgf/cm2 | 8 | metre | 348.35 ₹2,786.8 Lowest | 360 ₹2,880 |
| 3.00Chundankunnu anganwadi | |||||
| 3.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 0.34 | cum | 359.7 ₹121.94 Lowest | 360 ₹122.04 |
Tender Value
₹64,419
EMD Value
₹1,610
Closing Date
27 Sept 2025, 12:00 pmClosed
Assistant Engineer
LID EW section Vellinezhi GP
Annual Plan-VELLINEZHI GP. 2025-26, PRO. NO. 242-SOAK PIT CONSTRUCTION IN ANGANWADI AND CONSTITUENT OFFICES-General Civil Work
2025_LSGD_799606_22
ET/02/AE/LID EW/KGP/2025-26
Open Tender
Civil Works - Buildings
Item Rate
240 days
Vellinezhi GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
Yes
₹1,610
Yes
1 Nov 2025
19 Sept 2025
29 Sept 2025
19 Sept 2025
27 Sept 2025
19 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .