| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹41.0 LAccepted-AOC | L1 | Accepted-AOC Lowest bidder | |
| 2 | L2₹43.2 L+₹2.0 L (4.75%)Rejected-Finance MAHABHAIRAB PO TEZPUR DISTT SONITPUR ASSAM PIN 784 001 | SONITPUR | ASSAM | 784001 | L2 | Rejected-Finance Become L2 | |
| 3 | L3₹43.8 L+₹2.6 L (6.41%)Rejected-Finance | L3 | Rejected-Finance Become L3 | |
| 4 | L4₹46.6 L+₹5.4 L (13.2%)Rejected-Finance C O MALAY DUTTA MADHYAPARA OPP DARRANG COLLEGE GIRLS HOSTEL P O TEZPUR DISTT SONITPUR ASSAM 784 001 | SONITPUR | ASSAM | 784001 | L4 | Rejected-Finance Become L4 |
Tender Value
Refer Docs
EMD Value
₹86,000
Closing Date
24 Oct 2022, 6:00 pmClosed
GE South Tezpur
GE South Tezpur Mission Chariali Tezpur, Assam
REPAIR/MAINT/CLEANING AND SANITIZATION OF UNDER GROUND/OVER HEAD RESERVOIR/STORAGE TANK AND REPAIR/MAINT OF MECHANICAL LAUNDRY PLANT, BOILER OIL FIRE INCINATOR AND FIRE HYDRANT WITH ALLIED WORKS AT SAA UNDER GE (S) TEZPUR
2022_MES_554578_1
8660
Open Tender
Civil Works
Item Rate
270 days
GE South Tezpur
As per NIT
4 documents required · 4 mandatory
₹500
Yes
GE South Tezpur
₹86,000
Yes
27 Dec 2022
27 Sept 2022
26 Oct 2022
27 Sept 2022
24 Oct 2022
10 Oct 2022
Amount
M&L for seven stage cleaning and sterilization of inside the RCC/ Steel Underground/semi underground/Over head/Sedmentation/clear water sumps of capacity UG sump reservoir 60000 gallons through bacteriological treatment by using TERBAC G5/Inchor-5/NB-10/ TERBAC-G-65/ Inoxi-60/NB-69 AND ULTRA VIOLET RAY. Location: PH NO-4 seven stages are as under plants:- (a). First Stage is to drain out the water by using exit valve or high capacity dewatering system. (b). Second stage is cleaning all the algae formation inside the tank by using TERBAC G10/ Inoxi-60/NB-69 a laboratory tested branded chemical of the company ans scrubbing the walls of the tanks. (c). Third strage is fresh water cleaning by high speed jet pump. (d). Fourth stage and first bacteria screening is decertification by using TERBAC-G5/ Inohor-5/NB-10 a Govt Laboratory certified brannded halogen compound. (e). Fifth stage is cleaning the floor of water tank by industrial vaccum cleaner. (f) . Sixth stage is the second bacterio screening and sterilizing method by using ultra violet ray within the tnk and kills all suspended bacteria. (g) Seventh stage of cleaning and third bacteria screening is to sterilize the floor of the water tank by using laboratory certified, branded strong oxidizing agent TERBAC-G65/Inoxi-60/NB-69 . NOTE:-(i) COMPANY WILL SUBMIT GOVERNMENT LABORATORY TEST CERTIFICATE OF TERBAC-G5/INCHOR-5/NB-10, TERBAC-G65/ INOXIi-60/NB-69, BEFORE CLEANING, FIX THE STICKER MENTIONING THE DATE OF CLEANING & NAME OF SITE AND ALSO PROVIDE CERTIFICATE CONFIRMING THE COMPLETION OF STERILIZATION OF WATER TANKS MENTIONING THE NAME OF STATION AND DATE OF CLEANING. ALL THE CLEANING & STERILIZATION STAFFS SHOULD BE UNDER ACCIDENTAL INSURANCE COVERAGE.) (ii) OUTLET PIPE OF OHT SHOULD BE PLUGGED BEFORE CLEANING THE OHT TO AVOID.ENTERING SCALS AND THE SAME SHELL BE RECONNECTED AFTER CLEANING THE OHT AND THE QUOTED RATE IS DEEMED TO INCLUDE FOR THE ROVISION . (III) STERILIZATION TEAM WILL BE COMPRISED OF AT LEAST 30% MEMBERS WHO ARE MINIMUM 03 MONTS CERTIFICATE HOLDER IN WATER TANKS STERILIZATION. (IV) CONTRACTOR WILL BE RESPONSIBLE FOR RECTIFICATION OF COMPLAINTS OCCURRED DURING CLEANING THE TANK IE. NO WATER IN TANK/OVER FLOW DUE TO BROKEN OF FLOAT VALVE/ BLOCKAGE TO BE INCLUDED IN QUOTED RATE. NOTE:-THE WORK SHALL BE CARRIED THROUGH SPECILIZED AGENCY Approved by GE Based on past Experience.
All as per ser item No 1 above but for of inside UG sump reservoir capacity 130000 gallons through bacteriological treatment by using TERBAC G5/Inchor-5/NB-10/ TERBAC-G-65/ Inoxi-60/NB-69 AND ULTRA VIOLET RAY.Location: PHNO-1(A)
All as per ser item No 1 above but for of inside UG sump reservoir capacity 25000 gallons through bacteriological treatment by using TERBAC G5/Inchor-5/NB-10/ TERBAC-G-65/ Inoxi-60/NB-69 AND ULTRA VIOLET RAY. Location: PH NO-6
All as per ser item No 1 above but for of inside overhead reservoir capacity 50000 gallons through bacteriological treatment by using TERBAC G5/Inchor-5/NB-10/ TERBAC-G-65/ Inoxi-60/NB-69 AND ULTRA VIOLET RAY. Location:Pump House No 2.
All as per ser item No 1 above but for of inside overhead reservoir capacity 100000 gallons through bacteriological treatment by using TERBAC G5/Inchor-5/NB-10/ TERBAC-G-65/ Inoxi-60/NB-69 AND ULTRA VIOLET RAY. Make: RAYS CLEANTECH/ INUS WATERTECH/ SATYA ENTERPRISE. Location:Pump House No 5.
All as per ser item No 1 above but for of inside overhead reservoir capacity 50000 gallons through bacteriological treatment by using TERBAC G5/Inchor-5/NB-10/ TERBAC-G-65/ Inoxi-60/NB-69 AND ULTRA VIOLET RAY. Location:Pump House No 3.
All as per ser item No 1 above but for of inside overhead reservoir capacity 35000 gallons through bacteriological treatment by using TERBAC G5/Inchor-5/NB-10/ TERBAC-G-65/ Inoxi-60/NB-69 AND ULTRA VIOLET RAY. Location:Pump House No 3.
All as per ser item No 1 above but for of inside overhead reservoir capacity 100000 gallons through bacteriological treatment by using TERBAC G5/Inchor-5/NB-10/ TERBAC-G-65/ Inoxi-60/NB-69 AND ULTRA VIOLET RAY. Location:Pump House No 4.
All as per ser item No 1 above but for of inside overhead reservoir capacity 100000 gallons through bacteriological treatment by using TERBAC G5/Inchor-5/NB-10/ TERBAC-G-65/ Inoxi-60/NB-69 AND ULTRA VIOLET RAY. Location:Pump House No 1.
All as per ser item No 1 above but for of inside overhead reservoir capacity 10000 gallons through bacteriological treatment by using TERBAC G5/Inchor-5/NB-10/ TERBAC-G-65/ Inoxi-60/NB-69 AND ULTRA VIOLET RAY.Location:Pump House No 7.
All as per ser item No 1 above but for of inside Semi- underground/balancing static water reservoir capacity 20000 gallons through bacteriological treatment by using TERBAC G5/Inchor-5/NB-10/ TERBAC-G-65/ Inoxi-60/NB-69 AND ULTRA VIOLET RAY. Location: Swimming pool
All as per ser item No 1 above but for of inside Underground open well sump capacity 100000 gallons through bacteriological treatment by using TERBAC G5/Inchor-5/NB-10/ TERBAC-G-65/ Inoxi-60/NB-69 AND ULTRA VIOLET RAY. Make: Location: Fire Fighting BH (Near Pump House No 1(A)
All as per ser item No 1 above but for of inside static sadimentation RCC water reservoir of capacity 80000 gallons through bacteriological treatment by using TERBAC G5/Inchor-5/NB-10/ TERBAC-G-65/ Inoxi-60/NB-69 AND ULTRA VIOLET RAY.Location:Pump House No 1.
All as per ser item No 1 above but for of inside static sadimentation RCC water reservoir of capacity 30000 gallons through bacteriological treatment by using TERBAC G5/Inchor-5/NB-10/ TERBAC-G-65/ Inoxi-60/NB-69 AND ULTRA VIOLET RAY.Location:Pump House No 2.
All as per ser item No 1 above but for of inside static sadimentation RCC water reservoir of capacity 15000 gallons through bacteriological treatment by using TERBAC G5/Inchor-5/NB-10/ TERBAC-G-65/ Inoxi-60/NB-69 AND ULTRA VIOLET RAY.Location:Pump House No 3.
All as per ser item No 1 above but for of inside static sadimentation RCC water reservoir of capacity 50000 gallons through bacteriological treatment by using TERBAC G5/Inchor-5/NB-10/ TERBAC-G-65/ Inoxi-60/NB-69 AND ULTRA VIOLET RAY.Location:Pump House No 4.
All as per ser item No 1 above but for of inside static sadimentation RCC water reservoir of capacity 40000 gallons through bacteriological treatment by using TERBAC G5/Inchor-5/NB-10/ TERBAC-G-65/ Inoxi-60/NB-69 AND ULTRA VIOLET RAY.Location:Pump House No 5.
All as per ser item No 1 above but for of inside static sadimentation RCC water reservoir of capacity 40000 gallons through bacteriological treatment by using TERBAC G5/Inchor-5/NB-10/ TERBAC-G-65/ Inoxi-60/NB-69 AND ULTRA VIOLET RAY.Location:Pump House No 6
All as per ser item No 1 above but for of inside static sadimentation RCC water reservoir of capacity 15000 gallons through bacteriological treatment by using TERBAC G5/Inchor-5/NB-10/ TERBAC-G-65/ Inoxi-60/NB-69 AND ULTRA VIOLET RAY.Location:Pump House No 7
All as per ser item No 1 above but for of inside static Clear water RCC reservoir of capacity 40000 gallons through bacteriological treatment by using TERBAC G5/Inchor-5/NB-10/ TERBAC-G-65/ Inoxi-60/NB-69 AND ULTRA VIOLET RAY.Location:Pump House No 1
All as per ser item No 1 above but for of inside static Clear water RCC reservoir of capacity 40000 gallons through bacteriological treatment by using TERBAC G5/Inchor-5/NB-10/ TERBAC-G-65/ Inoxi-60/NB-69 AND ULTRA VIOLET RAY. Make.Location:Pump House No 2
All as per ser item No 1 above but for of inside static Clear water RCC reservoir of capacity 25000 gallons through bacteriological treatment by using TERBAC G5/Inchor-5/NB-10/ TERBAC-G-65/ Inoxi-60/NB-69 AND ULTRA VIOLET RAY.Location:Pump House No 3
All as per ser item No 1 above but for of inside static Clear water RCC reservoir of capacity 25000 gallons through bacteriological treatment by using TERBAC G5/Inchor-5/NB-10/ TERBAC-G-65/ Inoxi-60/NB-69 AND ULTRA VIOLET RAY. Location:Pump House No 4
All as per ser item No 1 above but for of inside static Clear water RCC reservoir of capacity 25000 gallons through bacteriological treatment by using TERBAC G5/Inchor-5/NB-10/ TERBAC-G-65/ Inoxi-60/NB-69 AND ULTRA VIOLET RAY.Location:Pump House No 5
M&L for seven stage cleaning and sterilization of inside the RCC/ PVC water storage tank of capacity not exceeding 500 Ltr of any description and in any position comprising following cleaning and sterilization of water tanks through bacteriological treatment by using TERBAC G5/Inchor-5/NB-10/ TERBAC-G-65/ Inoxi-60/NB-69 AND ULTRA VIOLET RAY. Location: SAA seven stages are as under plants:- (a). First Stage is to drain out the water by using exit valve or high capacity dewatering system. (b). Second stage is cleaning all the algae formation inside the tank by using TERBAC G10/ Inoxi-60/NB-69 a laboratory tested branded chemical of the company ans scrubbing the walls of the tanks. (c). Third strage is fresh water cleaning by high speed jet pump. (d). Fourth stage and first bacteria screening is decertification by using TERBAC-G5/ Inohor-5/NB-10 a Govt Laboratory certified brannded halogen compound. (e). Fifth stage is cleaning the floor of water tank by industrial vaccum cleaner. (f) . Sixth stage is the second bacterio screening and sterilizing method by using ultra violet ray within the tnk and kills all suspended bacteria. (g) Seventh stage of cleaning and third bacteria screening is to sterilize the floor of the water tank by using laboratory certified, branded strong oxidizing agent TERBAC-G65/Inoxi-60/NB-69 . NOTE:-(i) COMPANY WILL SUBMIT GOVERNMENT LABORATORY TEST CERTIFICATE OF TERBAC-G5/INCHOR-5/NB-10, TERBAC-G65/ INOXIi-60/NB-69, BEFORE CLEANING, FIX THE STICKER MENTIONING THE DATE OF CLEANING & NAME OF SITE AND ALSO PROVIDE CERTIFICATE CONFIRMING THE COMPLETION OF STERILIZATION OF WATER TANKS MENTIONING THE NAME OF STATION AND DATE OF CLEANING. ALL THE CLEANING & STERILIZATION STAFFS SHOULD BE UNDER ACCIDENTAL INSURANCE COVERAGE) (ii) OUTLET PIPE OF OHT SHOULD BE PLUGGED BEFORE CLEANING THE OHT TO AVOID.ENTERING SCALS AND THE SAME SHELL BE RECONNECTED AFTER CLEANING THE OHT AND THE QUOTED RATE IS DEEMED TO INCLUDE FOR THE ROVISION . (III) STERILIZATION TEAM WILL BE COMPRISED OF AT LEAST 30% MEMBERS WHO ARE MINIMUM 03 MONTS CERTIFICATE HOLDER IN WATER TANKS STERILIZATION. (IV) CONTRACTOR WILL BE RESPONSIBLE FOR RECTIFICATION OF COMPLAINTS OCCURRED DURING CLEANING THE TANK IE. NO WATER IN TANK/OVER FLOW DUE TO BROKEN OF FLOAT VALVE/ BLOCKAGE TO BE INCLUDED IN QUOTED RATE. NOTE:-THE WORK SHALL BE CARRIED THROUGH SPECILIZED AGENCY Approved by GE Based on past Experience.
All as per ser item No 25 above but for of inside the RCC/ PVC water storage tank of capacity not exceeding 1000 Ltr through bacteriological treatment by using TERBAC G5/Inchor-5/NB-10/ TERBAC-G-65/ Inoxi-60/NB-69 AND ULTRA VIOLET RAY.
All as per ser item No 25 above but for of inside the RCC/ PVC water storage tank of capacity not exceeding 2000 Ltr through bacteriological treatment by using TERBAC G5/Inchor-5/NB-10/ TERBAC-G-65/ Inoxi-60/NB-69 AND ULTRA VIOLET RAY.
Supply fix in repair Ball brass valves bearing ISI Mark high pressure with polytene float and flynut complete including connection with existing iron pipe and brass ferrule with necessary fittings for iron pipe of 20 mm bore.Complete all as specified and as directed.
Ditto as item No 28 but for 15 mm dia pipe
Preparing the surface by removing the spalled and loose plaster from existing surface and making it sound and clean by removing all dust particle and washing the surface with jet water. Then allowing the surface to dry and check for any cracks, honeycombing and other foreign particle complete as directed by site engineer.
Supplying, providing, mixing and laying over the prepared surface with cement mortar of average 15 mm thick or as per requirements in proporting 1:3 (1 Cement : 3 Sand) mixed with bonding agent, Nitoband SBR lated @ 5 liter per 50 Kgs of cement and integral waterproofing admixture complast WL of Fosroc Chemicals @ 125 ml per 50 Kg of cement complete as specified and directed by the Department.
M&L cross arms, bracing, supports, clamps and back plate fabricated from structural steel section including nut, bolts, washers, welding, bending, cold or hot, drilling holes for bolts in any shape or size as indicated or directed and inclusive of one primer coat, one under coat and one finishing coat of aluminium/Black paint complete all as specified and as directed .
The Semi-Annual Routine check up and preventive maintenance of oil fired steam boiler 300 kg/h make-Thermax model (a) RXA-04,Sl no-1241 through authorise service agency of OEM or Origin (Tharmax) company at 155 BH with the following condition. (a) Routine check up visites for procative and preventive maintenance guidance safety and equipments and also helth checkup four times in each boiler in a year from the work order (b) Guidance for overhauling of the equipments as per the scope, Four times in year in each boiler. (c) All Break Down visits .
All as per Item No -33 above but for boiler RXA-04, Sl no-1242
Maintenance and servicing of oil fired steam boiler 300 kg/h make-Thermax model (a) RXA-04,Sl no-1241 with control pannel through authorise service agency of OEM or Origin (Tharmax) company including Dismantling the Steam Boiler for overhauling and taking out of all electrical connection and steam line, lifting up steam coil by chain pulley system with other spare parts for inspection and Descaling of boiler coil inner tube by cleaning agent and decorbonise the same for proper passing of steam and overhauling of waterpump, fuel pump and replace the unserviceable spares parts/ defective/wornout parts with new spares such as sequence controller, photo resistor cell,valve sheat assembly, gland washer,nozzle, electrode cap, electrode, HT cable, loocking glass, RTD sensor, Temperature controller, Dial type thrmometer, steam pressure switch, water pressure switch, Hose metalic braded, Ignition Transformer, Packing Kylam, Packing Asbestos, Fuel pump, water pump,pressure gauge, glove valve, gate valve, pipe, Motor,blower, MCCB, MCB, contactor, Maxclean chemical, Nut bolts, lubricating oil, and Cleaning of strainers with vaccum cleaner, cleaning of POL tank etc all as specified and directed. ( (Note spares required for above maint will be measured and paid separately under relevent items of Sch).
All as per Item No -35 above but for boiler RXA-04, Sl no-1242
Disconnecting of unserviceable Fuel pump for Thermax Model No RXA -04/10.54 and supply and fixing new fuel pump model-AJ6 AC, complete all as specified and as directed by Engr in Charge. Make - Suntee or equivalent.
S & F in repair water pressure switch complete all as specified and directed
S & F in repair steam pressure switch complete all as specified and directed
S & F in repair sequence controller LMO 24 complete all as specified and directed
S & F in repair photocell QRB 1 complete all as specified and directed
S & F in repair Hooter square complete all as specified and directed
S & F in repair temperature controller TC 513 complete all as specified and directed
S & F in repair RTD sensor 5 mtr long complete all as specified and directed
S & F in repair LEADER Make GM Steam Stop Valve SS working Parts, Screw End size-3/4" with IBR TC complete all as specified and directed
S & F in repair solenoid coil bor burner rod complete all as specified and directed
S & F in repair safety valve 25 NB complete all as specified and directed
S & F in repair filter element for Diesel filter complete all as specified and directed
S & F in repair Sealing Ring for Diesel Filter complete all as specified and directed
S & F in repair Metallic Wire Breaded Hose 3/8" 60 " Long complete all as specified and directed
S & F in repair LEADER Make GM Steam Stop Valve SS working Parts, Screw End size-1" with IBR TC complete all as specified and directed
S & F in repair LEADER Make GM Steam Stop Valve SS working Parts, Screw End size-1/2" with IBR TC complete all as specified and directed
Supply only chemical Maxclean-05 complete all as specified
Supply only chemical Maxtrat 3221 for softening plant complete all as specified
Supply and fix water softening filter media (strong acid cation resin-sodium) complete all as specified and directed.
S & F in repair heating coil for Boiler (Thermax model No- RXA-04) complete all as specified and directed.
S & F in repair Pressure Gauge , 0 TO 40 KG 68 MM, 1/4"BSP Back connection complete all as specified and directed.
S & F in repair Pressure Gauge,0-25 KG, D100, 3/8 BSPT, PCB complete all as specified and directed.
S & F in repair Packing Hylam complete all as specified and directed.
S & F in repair Packing Asbestos complete all as specified and directed.
S & F in repair Nozzle 7.5 Gp 45 Deg complete all as specified and directed.
Opening of Front loading type washer extractor 120 Kg capacity and dismantling unit after disconnection of electrical /stremline and taking out of the shaft, pully with others spares for carryout inspection of all bearing, bush, coupling, pully and overhauling the same, rectification the defects including repacement of unserviceable spare parts and assembling the same for smooth running after applying approved grade of grease , gasket nut bolt washer etc. (NOTE :- Spare required will be measured under separate item).Complete all as specified and as directed.
All as per item 62 above but for slucing machine of capacity 30 Kg.
All as per item 62 above but for Dry Tumbler front loading type of capacity 60 Kg.
All as per item 62 above but for flat work iron
Dismantlung of Flat work Ironer double roll of roller (mending macine) after disconnection of electrical /stremline and taking out of the shaft, pully with others spares for carryout inspection of all bearing, bush,chest cleaning/ polishing/refitting through (Fabcare) company (NOTE: Heavy labor /Truck jacks/Heavy hammer / Heavy tools to be arranged by contractor at site for chest loading/unloading from machine. Accommodation to Fabcare staff during maintenance provided by contractor).Complete all as specified and as directed.
S & F in repair Solenoid valve 5/2 way, TG sereis 220 V, AC 12/15 watt, pressure 2-10 Kg/Sqcm media - Air, 1/4" BSP connectin (Make: Airchamp/Equivalent) complete all as specified
S & F in repair Steam hose pipe 1"x 650 mm (as per sample) complete all as specified
S & F in repair DTC+TC for manding machine as per sample complete all as specified
S & F in repair V belt main pully to motor fenner make for washer extractor 120/30 Kg , Drying tumbler of 60 kg capacity complete all as specified
S & F in repair PCB computer controller complete set (as per sample) complete all as specified
S & F in repair Emergency push button (as per sample) complete all as specified
S & F in repair Pressure switch (Make: APEX/KI/equivalent) complete all as specified
S & F in repair Flexible Hose pipe for drain 4.5"x4' (as per sample) complete all as specified
S & F in repair Manifold (4 way) (as per sample) complete all as specified
S & F in repair S.S plate for new display/ PCB computer controller for 120 kg washer extractor complete all as specified
S & F in repair Door gasket heat proof with fixing solution complete all as specified
S & F in repair Butter fly valve pneumatic actuator fitted for 120 kg washer extractor complete all as specified
S & F in repair Nipple 1/4x4 mm (as per sample) complete all as specified
S & F in repair Elbow 3/4x4 mm (as per sample) complete all as specified
S & F in repair Elbow 1/4x4 mm (as per sample) complete all as specified
S & F in repair Elbow 1/8x4 mm (as per sample) complete all as specified
S & F in repair PU pipe 4 mm with flare nut of length 1.5 mtr for Flat bed Press complete all as specified
S & F in repair V belt main pully to motor fenner make for slucing machine 30 Kg capacity (Make - Fenner / Nirlon / Equivalent) complete all as specified
S & F in repair Single solenoid valve 1/2" heavy duty(make-Jamatics) complete all as specified
S & F in repair MPD for flat bed press (Make-as per sample) complete all as specified
S & F in repair Push button ON/OFF (Make - L&T / Siemen /BCH or equvalent) complete all as specified
S & F in repair Silencer water flow control (Make:as per sample) complete all as specified
S & F in repair Silencer for solenoid valve (Make:as per sample) complete all as specified
S & F in repair High tension stainless steel compressed spring 6" long 1" dia complete all as specified
S & F in repair Ball bearing Braket size 513 including taking out old one (Make - SKF / TATA or equivalent) complete all as specified.
S & F in repair Timmer (0-15/0-60), 120/250V (Make - DIEHL Germany / L&T / Equivalent) complete all as specified.
S & F in repair Over load relay 4-6 Amp/6-10 A type ML (Make: L&T/Siemens/BCH) with copper wire / lug / socket for connection complete all as specified
S & F in repair Power contactor type ML 1.5 (Make: L&T/Siemens/BCH) with copper wire, lugs, socket for connection complete all as specified.
S & F in repair Power contractor NHD 25 A 4 pole coil voltage 415 V 50 HZ complete all as specified (Make : BCH/L&T)
Dismantling and taking down the existing electrical induction motor 3 Phase 415 volt of capacity upto 3 HP,935 RPM from base drive pully after disconnecting all electrical connection, striping out the motor complete for overhauling, servicing the motor winding by any hot compressed air and cleaning the winding with thinner and apply two coats of antimoisture heat resistance insulating varnish and drying up, cleaning the rotor and stator, replacement of defective parts such as bearing, terminal plate and reassembling the motor and refitting the same for smooth running of the machine (Make- crompton)( Note:spares parts for repair will be measured under separate items).Complete all as specified and as directed.
All as per item No. 96 above but capacity 30.00 HP.
Taking down motor 30 HP 415 volts, 1460 RPM after disconnecting all electrical connection nut, bolts from base plate and transportation to repair workshop and dismantling the motor stator, removing worn out copper winding, cleaning the stator and rewinding the same with super enamelled copper wire of existing size and specification and vernish the same with antimoisture heat resistance including varnishing and drying up slowly and including replacement of all types insulating tape, terminal plate, cable socket etc and reassembling the same, transporting to site for refixing in existing position for smooth running Complete all as specified and as directed.
All as per item No. 98 above but capacity upto 3.0 HP capacity motor complete.
Dismantling/removing of ID / FD fan motor after disconnecting all electrical connection, nut /bolts etc from its base, stripping out the motor and blower for repair/overhauling including varnish, greasing after servicing the motor winding, cleaning the rotor stator and reassembling the same and refixing it for smooth running.Complete all as specified and as directed.
Disconnecting the electric connection from Main supply and taking out the Air compressor from inside the mechanical laundry plant room and reinstalled at out side of mechanical laundry plant as per specification of manufacturer and make neccessary electric connection and compreesed air supply connection up to required Laundry equipments all as directed.
Taking out of jockey pump set from pump foundation after disconnection from motor /suction and delivery pipe and transportation to workshop dismantling the same and segregating of serviceable and unserviceable parts repairing and overhauling the pump set after replacement of defective parts and machine work and re-setting to the existing position connecting motor /all pipe line and commissioning and testing on full load to the entire satisfaction of Engr-in-Charge including two coats of synthetic enamel paint over a coat of primer including preparation of old painted surface all as speicified and directed.(Make-Kirloskar )
Taking out of old 12.5 HP jockey induction motor of 3 phase 415 volts 50 Hz from the existing position after disconnecting all electrical cable earthing and pipe line/pump connection and transportation to workshop,dismantling the motor and rewinding the same with existing guage super enamelled copper wire of approved make varnishing the same and heating properly in heat chamber, re-assembling the motor after replacement of DE/NDE bearing terminal box all rusted nut and bolts and install the same to the existing position and apply 2 coats of synthetic enamel paints after successfully repairs and testing complete up to water supply as specified and directed (MAKE -Crompton )
M&L for cutting existing incinerator outer casing to remove complete lining of U/S fire brick work and supply and fix new heat resistant fire brick with fire resistant cement morter confirming to relevant IS complete and making good the cutting portion of outer casing by welding comlete all as per existing shape as directed
Supply and fixing Ionisation type smoke detector of dual chambers, dual source with 2 radio active sources, having in built LED to indicate fire indication complete with base plate 1.6 mm thick sheet steel mounting box.Complete all as specified and as directed.
Taking up water pipeline of any size any type including all fittings from trenches mild steel pipe (IS: 1239 Part-I) heavy class with flanged/socket and spigot ends including all fittings viz, forged steel screwed fittings, flanges, bends, tees, reducers, elbow, clamps, hangers etc and kept in safe custody for reuse/disposal /taking credit the same for the following bore as directed by the Engineer-in-Charge
Supply and lay in trenches / fix to wall MS ERW pipe of 150 mm dia of medium grade with reducer, bends, elbows, union etc complete and connecting to the existing pipe line all as specified Make : JINDAL/TATA
All as in Item No-107 above but for 100mm bore
All as in Item No-107 above but for 80mm bore
S&F bends (any type, radius and angle) tapers any type (strainght, bend, increasing, decreasing or double socket etc) tee pieces single brancehs 'Y' junction double branch, cross (all socket or socket and spigot) collars, caps and plugs for pipe of Bore upto 150mm complete all as specified and directed.
S & F in repair Detectors Complying with and type certified to Addressable type multisensor heat & smoke detector with base with self built intelligence as per IS: 11360 complete all as specified and directed
S & F in repair Fire alarm control panel complying with BS EN 54 Single loop panel of capacity from 99 detectors & 99 modules upto 200 detector and modules complete all as specified and directed.
S & F in repair Pressure gauge 4"dial 0-14 kgs rating complete all as specified and directed.
S & F in repair Pressure switch Universal type complete all as specified and directed.
S & F in repair RRL hose type - A 15 m complete all as specified and directed
S & F in repair Sluice Valve of dia 150mm Class PN 1.6 complete all as specified and directed.
S & F in repair non return Sluice Valve of dia 150mm Class PN 1.6 complete all as specified and directed.
S & F steam globe stop valve 25mm dia with hand wheel including necessary fitting suitable for steam line after taking out old one Make - Zoloto/Neeta
All as in Item No- 118 above but for 20 mm dia
S & F Globe type non return valve bronze 15/20 mm BSPT 15 nb/20nb bore with necessary fitting suitable for steam line after taking out old one. Make - Zoloto /Neeta) Note 1:-The contract sum shall be arrieved at after deducting amount of schedule of credit from the total quated amount. Note 2-Contractor's supervisor and main worker would wear shirt/T-shirt of colour sky blue/brown/yellow preferable embosed with contractor's firm name while carriying out any activities in defence area for better check of security purpose. Note 3:-The tenderer (all eligible contractors) shall ascertain the taxes & levies as on date. The subject tender caters all the taxes & levies as on date including the latest notification of GST issued as on date ( issued by Central Board of Indirect Taxes and Customs)
D G Corporation
M/S Deep-Jeet
M/S Jiban Krishan Das and Co
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .