| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-Finance | ₹5.0 L | L1 | Accepted-Finance L1 BIDDER |
| 2 | L2₹5.5 L+₹42,494.60 (8.44%)Rejected-Finance NO 1 DIGHIRPAR P O WEST DIGHIRPAR P S CANNING DIST SOUTH 24 PGS | CANNING | SOUTH 24 PARGANAS | WEST BENGAL | ₹5.5 L+₹42,494.60 (8.44%) | L2 | Rejected-Finance L2 BIDDER |
| 3 | L3₹5.5 L+₹46,533.34 (9.24%)Rejected-Finance | ₹5.5 L+₹46,533.34 (9.24%) | L3 | Rejected-Finance L3 BIDDER |
| 4 | Rejected-Technical 17 5 KP ROY LANE ROAD KOLKATA 700031 | KOLKATA | KOLKATA | WEST BENGAL | 700031 | - | - | Rejected-Technical IMPROPER CREDENTIAL |
Tender Value
₹5.9 L
EMD Value
₹11,707
Closing Date
15 Jun 2026, 2:00 pmClosed
EE SDD
Office of the Executive Engineer Suburban Drainage Division Jalasampad Bhavan(7th Floor), Bidhannagar, Kolkata- 700 091.
Operation Maintenance of 10 vented sluice gate (both draw and flap shutters) at Pujali over Churial Diversion khal during monsoon 2026 within Pujali Municipality, P.S-Budge Budge, under Suburban Drainage Sub-Division No.II
2026_IWD_1024675_1
WBIW/EE/SDD/e-NIT-01/2026-27
Open Tender
CIVIL WORKS
Percentage
150 days
Pujali over Churial Diversion khal
Please refer Tender documents.
6 documents required · 6 mandatory
₹11,707
Yes
24 Jun 2026
18 May 2026
16 Jun 2026
18 May 2026
15 Jun 2026
18 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg). | - | Each | 7.15 | - |
| 2 | Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,( tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials).
NB:- Volume of earth/ sand filled bags should not be less than 0.028 cum/ bag. | 5,000 | Each Bag | 8.34 | ₹41,700 |
| 3 | Dumping in position earth / sand filled gunny / poly bags (capacity 50 kg) within a lead of 30 metre inclusive of all lifts. | 5,000 | Each Bag | 3.58 | ₹17,900 |
| 4 | Earthwork in excavation in all kinds of soil for making embankments,repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of,
NB :- Measurement to be taken on the basis of stack measurement / prepost work section measurement after deduction of void as per norms No extra payment will be made for stacking.
E) Beyond 4.00 km and upto 5.00 km
Earth work note for Royalty:-
(This rate is includes for compensation for earth for land owned/arranged by the contractor @ Rs. 25.00 per m3 and royalty charges on earth @ 29.00 per m3 & Cesses chagges @ Rs. 5.30 per m3 ( i.e., Rs. 15.00 per 100 cft. ), as per Govt. notification which will be paid on production of necessary documents in support of payment made towards the royalty & Cesses.) (The payment is to be made on the basis of thefinished compacted volume.)
Specified in 6th corrigenda PWD( Road & Bridge) | - | Cum | 371 | - |
| 5 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specifications Clause 202 for Rural Roads of MORD I) By Manual Means b) Cement Concrete | 10.8 | Cum | 475.53 | ₹5,135.72 |
| 6 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm
nominal size) excluding shuttering and reinforcement if any, in ground floor
as per relevant IS codes. | 10.8 | Cum | 7,042.49 | ₹76,058.89 |
| 7 | Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction.
b) Where staging is not required. | 19.34 | Sqm | 255.05 | ₹4,932.67 |
| 8 | Supplying / Replacing Gun Metal Bush for screw gearing arrangement required for hanging arrangement of draw shutter and fitting & fixing with the screw gearing arrangement for operating the draw shutter by taking out the old screw gearing
arrangement and Gun Metal bush etc. complete as per direction of the Engineer-in-charge. (The old materials to be returned to Departmental Godown.)
(b) 65 mm. dia. | 2 | Each | 7,940.96 | ₹15,881.92 |
| 9 | Supplying, fitting and fixing of Mild Steel Guide Channel with necessary Mild Steel lugs of required length and size by making hole into wall and fixing with necessary masonry work with maintaining proper line and level as directed by the Engineer-incharge. This item includes two coats of anti-corrossive bituminous paint over two coats of red lead primer. Payment will be made on actual length of Guide Channel. | 264.62 | Kg | 91.77 | ₹24,284.18 |
| 10 | Supplying, fitting & fixing Cast Iron wheel (after taking out existing one if necessary), rim made of 28 mm. to 36 mm. dia to fit any size of gear rod including carriage to site, painting with two coats of bituminous paint over two coats of red lead primer etc. complete as per direction of the Engineer-in-charge.
(b) 60 cm. dia. Cast Iron wheel | 2 | Per Set | 3,276.26 | ₹6,552.52 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.53 MB
WB_2911.pdf
Tender Documents • 1.86 MB
BARCHART1.pdf
Tender Documents • 0.15 MB
BOQ_2518202.xls
BOQ • 0.39 MB
Image_002.pdf
PDF • 0.31 MB
CORRI_1_SDD.pdf
PDF • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .