Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹61.1 CrAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹64.0 Cr+₹3.0 Cr (4.89%)Admitted-Finance C 20A METAL COLONY AMBABARI JAIPUR DIST JAIPUR RAJSTHAN PIN 302023 | JAIPUR | RAJASTHAN | 302023 | L2 | Admitted-Finance | ||
| 3 | L3₹65.4 Cr+₹4.3 Cr (7.06%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹66.4 Cr+₹5.3 Cr (8.67%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹67.0 Cr+₹6.0 Cr (9.80%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹76.5 Cr
EMD Value
₹76.5 L
Closing Date
22 Apr 2025, 6:00 pmClosed
ACE PWD ZONE KOTA
ACE PWD ZONE KOTA
Widening and Strengthening of NH 148D (Samarawata Village) Bambooli Bamangaon Jarkhoda Karwar Arnetha Antarda Talwas SH 34 (Jetpur Km. 68/700) km. 0/0 to 33/00 (MDR 410)
2025_CEPWD_454295_1
ACE PWD ZONE KOTA NITNO-22/2024-25
Open Tender
Civil Works
Percentage
450 days
BUNDI
Please refer Tender documents.
3 documents required · 3 mandatory
₹50,000
50000 EE PWD DIV. NAINWA
₹76.5 L
ACE PWD ZONE KOTA
9 May 2025
24 Mar 2025
24 Apr 2025
24 Mar 2025
22 Apr 2025
24 Mar 2025
4 Apr 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, brush, shrubs, saplings and trees of girth upto 300mm, removal of stumps, disposal of unserviceable Material and stacking of serviceable Material upto 1000m from road boundary. (MoRTH Specification : Clause 201). BY MECHANICAL MEANS In area of Thorney Jungle | 33.33 | Hectare | 17,947 | ₹5,98,173.51 |
| 2 | Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock pilling at designated locations and disposal of dismantled Materials upto a lead of 1000 mtrs. stacking serviceable and unserviceable Materials separately. (MoRTH specification : Clause 202) | 2,805 | Cum | 740 | ₹20,75,700 |
| 3 | Dismantling of flexible pavements and disposal of dismantled Materials upto a lead of 1000 mtrs. Stacking serviceable and unserviceable Materials separately. (MoRTH specification : Clause 202) BY MECHANICAL MEANS Bituminous Courses | 915.94 | Cum | 190 | ₹1,74,028.6 |
| 4 | Construction of embankment with approved Material obtained from borrow-pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting by vibratory roller 8-10 tonne to meet requirement of Table 300-2 including cost of compensation for earth taken from private land with lead upto 1 km as per MoRTH Specification : Clause No. 305. | 2,91,473.98 | Cum | 117 | ₹3,41,02,455.66 |
| 5 | Earthwork in excavation for roadway in soil, including stacking / disposal of surplus Material exclusive of compensation of earth (MoRTH specification : clause 301 to 305). By Hydraulic Excavator CK-90 of 0.9 cum bucket capacity and tipper with disposal upto 1000 mtrs. | 7,430.54 | Cum | 37 | ₹2,74,929.98 |
| 6 | Providing, laying and spreading and compacting specified graded crushed stone in sub-base course including premixing the Material at OMC in mechanical mixer (Pug mill), carriage of mixed Material, laying in uniform layers with Motor Grader, F.E. Loader, on a prepared surface and compacting with Vibratory Compactor to achieve the desired density including all Material, labour, machinery, lighting barricading and maintenance of Driversion complete. (MoRTH specification clause 401). with all lead & lift | 19,701.1 | Cum | 1,422 | ₹2,80,14,964.2 |
| 7 | Construction of sub-grade and earthen shoulders with approved Material obtained from borrow-pits with all lifts and leads, transporting to site, spreading, grading to require slope and compacted by vibratory roller 8-10 tonne to meet requirement of Table 300-2 as per MoRTH specification : Clause No. 305. | 29,160 | Cum | 147 | ₹42,86,520 |
| 8 | Providing, laying and spreading of granular sub-base by providing coarse graded Material, spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per MoRTH Specification : clause No. 401. Grading-III | 19,318.5 | Cum | 509 | ₹98,33,116.5 |
| 9 | Providing, laying, spreading and compacting crushed graded stone aggregate as per Table 400-10 & 400.11 to Wet Mix Macadam specifications including premixing the Material with water to OMC in mechanical mixer (Pug mill) as per design mix, carriage of mixed Material by tipper to site laying in uniform layers, with motor grader/F.E. loader/Paver Finisher, in sub-base/base course on a well prepared under-base and compacting with Vibratory Roller to achieve the desired density including lighting, guarding, barricading and maintenance of Driversion etc. (MoRTH specification : Clause 406). with all lead & lift | 40,519.5 | Cum | 1,604 | ₹6,49,93,278 |
| 10 | Providing and applying primer coat over prepared surface of granular base with bitumen emulsion as per IS:8887 & manufacturer’s specifications @7.50 kg/10 sqm with a self propelled or towed bitumen pressure sprayer equipped for spraying the Material uniformly at specified rates and temperatures (including cleaning of road surface) as per MoRTH specification : Cl. 502, 112 | 1,62,078 | Sqm | 35.3 | ₹57,21,353.4 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_815465.xls
BOQ • 0.34 MB
1-SBDPart-01.pdf
Tender Documents • 0.76 MB
1-SBDPart-02.pdf
Tender Documents • 16.41 MB
166618285.pdf
Tender Documents • 2.15 MB
166618287.html
Tender Documents • 0.06 MB
CERTIFICATE-MDR-410.pdf
Tender Documents • 0.18 MB
RATE-ANALYSIS-MDR-410.rar
Tender Documents • 6.76 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .