| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.7 LAccepted-AOC | L1 | Accepted-AOC ok | |
| 2 | L2₹8.2 L+₹1.4 L (21.4%)Rejected-Finance | L2 | Rejected-Finance HIGHER | |
| 3 | L3₹8.2 L+₹1.5 L (21.8%)Rejected-Finance VILLAGE BUTANA BUTANA KUNDU | L3 | Rejected-Finance HIGHER | |
| 4 | L4₹8.2 L+₹1.5 L (22.5%)Rejected-Finance 1 WARD NO 01 RAVIDAS MANDIR KHARKHODA SONIPAT HARYANA 131402 | SONIPAT | HARYANA | 131402 | L4 | Rejected-Finance HIGHER |
Tender Value
₹9.3 L
EMD Value
₹18,700
Closing Date
28 May 2026, 10:00 amClosed
Padam Bhushan
Muncipal Corporation Sonipat
1250 - Construction of shed on the track in Dada Bhaiyan Bhawan,village Rathdhana, ward no.9, M.C.Sonipat
2026_HRY_523038_1
20264332F999 3D6D 4918 9688 3C882C944F81292ULB
Open Tender
Civil Works
Works
180 days
Sonepat
2 documents required · 2 mandatory
₹1,000
₹18,700
Yes
9 Jun 2026
20 May 2026
28 May 2026
20 May 2026
28 May 2026
20 May 2026
20 May 2026 - 22 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [11.85.1]Painting over wooden/metal surface with acid proof paint of approved brand and manufacture of required colour to give an even shade : 1. Two or more coats on new work [Through Rate] | - | Sqm | 56 | - |
| 2 | [13.27]Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. [Through Rate] | - | Kg. | 71 | - |
| 3 | [13.30.1]Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. 1. Hot finished welded type tubes [Through Rate] | - | Kg. | 105 | - |
| 4 | [4.14.1]Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil. [Through Rate] | 1 | cum | 83 | ₹82.92 |
| 5 | [6.1.6]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) [Through Rate] | 1 | cum | 2,442 | ₹2,439.56 |
| 6 | [6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) [Through Rate] | 1 | cum | 4,374 | ₹4,369.63 |
| 7 | [6.30.1]Centering and shuttering including strutting, propping etc. and removal of form for 1. Foundations, footings, bases of columns, etc. for mass concrete [Through Rate] | 1 | Sqm | 156 | ₹155.84 |
| 8 | [6.33.3]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 3. Cold twisted bars [Through Rate] | - | Kg. | 68 | - |
| 9 | [9.22.1]Providing corrugated G.S. sheet roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (up to any pitch in horizontal/ vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. 1. 1.00 mm thick with zinc coating not less than 275 gm/m² [Through Rate] | - | Sqm | 1,157 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_601966.xls
BOQ • 0.29 MB
AD0164713.pdf
Additional Documents • 1.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .