Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 LAccepted-Finance | ₹1.2 L | L1 | Accepted-Finance L1 |
| 2 | L2₹1.7 L+₹51,821.83 (44.7%)Rejected-Finance 73D SOUTH SINTHEE ROAD KOLKATA 700030 | 24 PARAGANAS NORTH | WEST BENGAL | 700030 | ₹1.7 L+₹51,821.83 (44.7%) | L2 | Rejected-Finance L2 |
| 3 | L3₹1.7 L+₹52,656.32 (45.4%)Rejected-Finance | ₹1.7 L+₹52,656.32 (45.4%) | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical 268 RABINDRA RALLY BAGHAJATIN KOLKATA 700086 | KOLKATA | KOLKATA | WEST BENGAL | 700086 | - | - | Rejected-Technical Credential mismatched |
| 5 | Rejected-Technical | - | - | Rejected-Technical Credential mismatched |
Tender Value
₹1.7 L
EMD Value
₹3,338
Closing Date
18 Aug 2026, 3:00 pmClosed
Executive Engineer,KID
Office of the Executive Engineer Kakdwip Irrigation Division Postal address Kakdwip, South 24 Parganas, Pin-743347
Emergent ghoges ( 2 nos) repairing at Sundarban Embankment damaged due to new Moon Kotal on and from 13.07.2026 to 17.07.2026 in between ch 18.62 km and ch 18.68 Km at Mouza Mrinalnagar near Gundakata, Block Kakdwip on the left embankment of Bansta
2026_IWD_1038059_18
WBIW/EE/KIDIVISION/e-SNIT- 09 (e)/2026-27
Open Tender
CIVIL WORKS
Percentage
7 days
Kakdwip
Please refer Tender documents.
6 documents required · 6 mandatory
₹3,338
Yes
3 Sept 2026
14 Aug 2026
18 Aug 2026
14 Aug 2026
18 Aug 2026
14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying, dressing and stacking at site bamboo pins above 5 cm. diameter and upto 7.5 cm. diameter. (Dia. To be measured at mid length). | - | Mtr. | 34.56 | - |
| 2 | Driving bamboo pins in standing or flowing water including scaffolding and driving appliances.
(a) Where boats are not necessary. | - | Mtr. | 13.11 | - |
| 3 | Supplying, fitting and fixing with iron nails half split bamboo wailing pieces (av. dia. of bamboo not less than 5.0 cm.) | - | Mtr. | 26.22 | - |
| 4 | Supplying to site empty cement polythene bags (capacity50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg). | - | Each | 7.15 | - |
| 5 | Labour charges for filling empty cement gunny bag / polythene bag (capacity50kg) with all kinds of earth (wetordry), sand or agreegates (stone/brick) and sewing as done in case of cement bags, (tying with a knot after filling will not be accepted), and stacking with in a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials).
NB:-Volume of earth / sand filled bags should not be less than 0.028 cum / bag. | - | Each | 8.34 | - |
| 6 | Dumping in position earth /sand filled gunny / poly bags (capacity50kg) within a lead of 30 metre inclusive of all lifts. | - | Each | 3.58 | - |
| 7 | Earthwork in closing ghoges in embankments including cutting, filling, puddling with water and ramming including all leads and lifts, if necessary. | - | Cum | 128.71 | - |
| 8 | Dismantling of existing structures like culverts, bridges,
retaining walls and other structure comprising of
masonry, cement concrete, steel work, including T&P
and scaffolding wherever necessary, sorting the
dismantled material, disposal of unserviceable
material and stacking the serviceable material with all
lifts and lead of 1000 m as per Technical Specifications
Clause 202 for Rural Roads of MORD. (I) By Manual Means b) Cement Concrete | - | Cum. | 475.53 | - |
| 9 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.
(i) Pakur Variety. Cement: PPC/PSC/OPC (33 grade) | - | Cum. | 7,597.12 | - |
| 10 | Hire and labour charges for Shuttering with or
without staging upto 4.0 m height using approved
stout props with wooden planks/ply wood/steel
sheet plate with required bracing for any kind of
plain or reinforced concrete works in all sorts of
minor structure including culvert, box culvert, cross
drain etc. The rate is inclusive of fitting, fixing and
striking out after completion of work as per
specification and direction. (b) Where staging is not required. | - | sqm | 255.05 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.13 MB
Tendernotice_2.pdf
PDF • 1.03 MB
BOQ_2550117.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .