Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.0 LAccepted-AOC | ₹40.0 L | L1 | Accepted-AOC Being lowest bidder |
| 2 | L2₹70 L+₹30.0 L (75.0%)Rejected-Finance | ₹70 L+₹30.0 L (75.0%) | L2 | Rejected-Finance Not lowest bidder. |
| 3 | L3₹1.2 Cr+₹77.0 L (192.5%)Rejected-Finance | ₹1.2 Cr+₹77.0 L (192.5%) | L3 | Rejected-Finance Not lowest bidder. |
Tender Value
Refer Docs
EMD Value
₹1.4 L
Closing Date
4 Jul 2022, 12:00 pmClosed
Chief Engineer Project Vijayak
HQ CE (P) Vijayak, C/o 56 APO Pin 931721
Cnsltncy Srvces for Ppration of DPR and providing Pre-Const actvtes for Const of 2 lane Highway Handenbroke-Zingpal B/w Crdinte 34042-52.97-N, 76040-15.53-E(5Km frm Handnbrok End) and 34044-27.49-N, 76045-42.16-E(Km4.01 frm Zngpal end)in UT of Ladakh
2022_BRO_521878_1
CE (P) Vijayak /02/2022-23
Open Tender
Civil Works
Item Rate
180 days
Handenbroke-Zingpal in UT of Ladakh
As per TD and RFP, Technical evaluation will be carried out through INFRACON
9 documents required · 9 mandatory
₹0
₹1.4 L
Yes
HQ CE (P) Vijayak, Kargil
6 Sept 2022
5 May 2022
5 Jul 2022
6 May 2022
4 Jul 2022
20 May 2022
7 May 2022 - 14 May 2022
19 May 2022
Amount
Schedule A (Fixed Lumpsum Cost)
Remuneration for Local/ Expatriate Staff (including per diem allowance)
KEY PROFESSIONALS (Team Leader Cum Senior Highway Engineer -1 no, Senior Bridge Engineer -1 no, Highway cum pavement Engineer-1 no, Material-cum-Geotechnical Engineer-Geologist -1 no and Senior Survey Engineer -1 no)
OTHER PROFESSIONALS (Traffic and Safety Expert, Environmental Specialist, Quantity Surveyor /Documentation Expert, Land Acquisition Expert and Utility Expert)
Sub-Professional Staff: (To be assessed by Consultant as per requirement of assignment, Minimum 6 to be deployed) TBN
Support Staff (Fixed Rates) (Office Manager-1 Nos, Typist -2 Nos, Office Boy -2 Nos and Night Watchman -2 Nos)
Transportation (Fixed costs) The vehicles hired by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for use of consultants
Duty Travel to Site (Fixed Costs)
Office Rent (Fixed Costs) The rent cost includes operation & maintenance, cleaning, repairs, etc for entire duration of services.
Office Supplies, Utilities and Communication (Fixed Costs) (Office Supplies, Drafting Supplies, Computer Running Costs and Domestic and International Communication).
Office Furniture and Equipment (Fixed costs)
Investigation (Fixed Cost) :
Roughness Survey
Axle Load Survey
Material Survey and Investigation
Sub-grade Investigation
Traffic Survey
Socio-economic & Census Survey/Studies
Land Acquisition Studies
Any other investigations/surveys
Land Acquisition Team including support staff and logistics/ transportation : (Ex-Land Revenue Inspector /Officer or equivalent, Ex-Kanoogo/ Girdwar or equivalent, Ex-Patwari or equivalent, Typist & Peon)
Logistics for Land Acquisition Team (Logistics for Land acquisition Team, Computer including necessary peripherals, Printers & Vehicles (Bolero or equivalent) with monthly running limit of 4000 km)
Schedule B (Item rate costs)
Topographiccal Survey (fixed Rate) & Investigation
Topographic Survey including hire charges for equipment and supply survey teams comprising of project survey field staff etc. inclusive of cost of material, labour
Detailed topographic surveys using mobile/ aerial LiDAR or better technology
Sub-soil Investigation
Boring in all type of soils (other than hard rock)
Boring in hard rock
Reports and Document
Monthly Report
Inception Report & QAP
Environment and Social Impact Screening Report
Draft Feasibility Report
Final Feasibility Report
Strip Plan with L.A. Reports
Draft LA and Clearances I Report
Final LA and Clearances I Report
Draft Environmental Assessment report & RAP
Final Environmental Assessment report & RAP
Draft Detailed Design Report & Drawings etc.
Draft EMP
Draft Bidding Documents
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc.
Final EMP
Final Bidding Documents
Draft 3(a) ,3(A) and 3(D) notification for land acquisition( 3 copies each)
LA & Clearances II Report
Cost of supply and fixing Boundary Pillars Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed at an interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval.(lump-sum)
CivilMantra Infracon Private Limited
LnT Infrastructure Engineering Limited
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .