| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.3 LAccepted-AOC CHANDRONA TEHSIL NOHRADHAR DISTRICT SIRMOUR H P | ₹36.3 L | L1 | Accepted-AOC accept |
| 2 | L2₹39.7 L+₹3.4 L (9.40%)Rejected-Finance GROUND FLOOR THAKUR COMPLEX BASANTPUR | BASANTPUR | SHIMLA | HIMACHAL PRADESH | 171018 | ₹39.7 L+₹3.4 L (9.40%) | L2 | Rejected-Finance reject |
| 3 | L3₹39.8 L+₹3.4 L (9.49%)Rejected-Finance | ₹39.8 L+₹3.4 L (9.49%) | L3 | Rejected-Finance reject |
| 4 | L4₹41.4 L+₹5.1 L (14.0%)Rejected-Finance | ₹41.4 L+₹5.1 L (14.0%) | L4 | Rejected-Finance reject |
| 5 | L5₹43.7 L+₹7.4 L (20.4%)Rejected-Finance VILLAGE PO AND TEHSIL DEHRA DISTT KANGRA HP | KANGRA | HIMACHAL PRADESH | 175013 | ₹43.7 L+₹7.4 L (20.4%) | L5 | Rejected-Finance reject |
| Sl No | Description | Qty | Unit | aman sood L5 | ANISH SHARMA L3 | MAXIM ENGINEERING SOLUTIONS L4 | RAKESH KUMAR L2 | M/S ASHOK KUMAR L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00Excavation in foundation trenches etc. in all kinds of soil such as pick jumper work blasting soft or hard rock or by chiselling where blasting is prohibited soft/hard rock in all lifts stacking the excavated soil as directed by the Engineer-in-charge clear from the edge of excavation and then returning the stacked soil in 15cm layers when required into plinth sides of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed by the Engineer-in-charge in all leads and lifts. | ||||||||
| 2.00 | Pick work 40%,jumper work 30% and chiselling work in soft rock and hard rock | 199.52 | Cum | 990 ₹1,97,524.8 | 800 ₹1,59,616 | 1,000 ₹1,99,520 | 400 ₹79,808 Lowest | 987 ₹1,96,926.24 |
| 3.00 | Providing and laying cement concrete 1:4:8 (1cement, 4and 8 graded stone aggregate 20mm nominal size) complete excluding cost of work in foundatiion and plinth. | 23.97 | Cum | 6,990 ₹1,67,550.3 | 6,500 ₹1,55,805 Lowest | 8,000 ₹1,91,760 | 7,500 ₹1,79,775 | 6,987 ₹1,67,478.39 |
| 4.00Providing form work with steel plated 3.15mm thick welded with angle iron in frame 30x30x5mm, so as to give a fair finish including centring,shuttering,strutting and propping etc. with wooden battens and ballies height of propping and centering below supporting floor to ceiling not exceeding 4 meters and removal of the same for in situ-reinforced concrete and plain concrete work in :- | ||||||||
| 5.00 | Vertcal surface such as walls (any thickness ) partitions and the like including attached pillasters, buttresses plinth and string courses and the like | 747.87 | Sqm | 351 ₹2,62,502.37 | 370 ₹2,76,711.9 | 400 ₹2,99,148 | 350 ₹2,61,754.5 | 327 ₹2,44,553.49 Lowest |
| 6.00 | Edges of slabs and breaks in floors and walls runder 20cm wide | 105.3 | Rmt | 151 ₹15,900.3 | 102 ₹10,740.6 | 110 ₹11,583 | 100 ₹10,530 | 87 ₹9,161.1 Lowest |
| 7.00Providing and laying cement concrete 1:1.5:3(1cement:1.5sand:3 graded stone aggregate 20mm nominal size)and including under water curing complete excluding the cost of form work and reinforced concrete work :- | ||||||||
| 8.00 | In foundation ,footing,bases of column and the like | 21.24 | Cum | 11,990 ₹2,54,667.6 | 9,500 ₹2,01,780 | 10,000 ₹2,12,400 | 9,500 ₹2,01,780 | 9,397 ₹1,99,592.28 Lowest |
| 9.00 | Wall(any thickness but not less than .10 mtrs attaches pillasters,buttresses plinth and stirng courses etc.,fron top of found,level up to floor level | 96.23 | Cum | 12,990 ₹12,50,027.7 | 9,800 ₹9,43,054 | 10,500 ₹10,10,415 | 9,500 ₹9,14,185 | 7,777 ₹7,48,380.71 Lowest |
| 10.00 | Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone aggregate 40mm nominal size ) wfith 15% plum and curing complete excluding the cost of form work in retaining / breast wall, the size of plums shall usually be 150mm to 300mm as per HPPWD specificationwith in all leads and lifts complete in all respect. | 77.76 | Cum | 6,590 ₹5,12,438.4 Lowest | 7,500 ₹5,83,200 | 8,100 ₹6,29,856 | 7,900 ₹6,14,304 | 6,737 ₹5,23,869.12 |
Tender Value
₹43.8 L
EMD Value
₹87,667
Closing Date
8 Apr 2026, 11:00 amClosed
EE
Jal Shakti Division Jawalamukhi
Check dam at Tillu Nallah in Sudharlahar, Naun Nallah in Jakhlahar and Duhak Nallah
2026_HPIPH_132875_1
JAM-KNG02-742
Open Tender
Civil Works
Item Rate
180 days
Jawalamukhi
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,000
EE Jawalamukhi
₹87,667
20 Apr 2026
30 Mar 2026
8 Apr 2026
30 Mar 2026
8 Apr 2026
30 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Excavation in foundation trenches etc. in all kinds of soil such as pick jumper work blasting soft or hard rock or by chiselling where blasting is prohibited soft/hard rock in all lifts stacking the excavated soil as directed by the Engineer-in-charge clear from the edge of excavation and then returning the stacked soil in 15cm layers when required into plinth sides of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed by the Engineer-in-charge in all leads and lifts. | |||||
| 2Pick work 40%,jumper work 30% and chiselling work in soft rock and hard rock | |||||
| 3Providing and laying cement concrete 1:4:8 (1cement, 4and 8 graded stone aggregate 20mm nominal size) complete excluding cost of work in foundatiion and plinth. | |||||
| 4Providing form work with steel plated 3.15mm thick welded with angle iron in frame 30x30x5mm, so as to give a fair finish including centring,shuttering,strutting and propping etc. with wooden battens and ballies height of propping and centering below supporting floor to ceiling not exceeding 4 meters and removal of the same for in situ-reinforced concrete and plain concrete work in :- | |||||
| 5Vertcal surface such as walls (any thickness ) partitions and the like including attached pillasters, buttresses plinth and string courses and the like | |||||
| 6Edges of slabs and breaks in floors and walls runder 20cm wide | |||||
| 7Providing and laying cement concrete 1:1.5:3(1cement:1.5sand:3 graded stone aggregate 20mm nominal size)and including under water curing complete excluding the cost of form work and reinforced concrete work :- | |||||
| 8In foundation ,footing,bases of column and the like | |||||
| 9Wall(any thickness but not less than .10 mtrs attaches pillasters,buttresses plinth and stirng courses etc.,fron top of found,level up to floor level | |||||
| 10Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone aggregate 40mm nominal size ) wfith 15% plum and curing complete excluding the cost of form work in retaining / breast wall, the size of plums shall usually be 150mm to 300mm as per HPPWD specificationwith in all leads and lifts complete in all respect. | |||||
stage.html
html • 0.05 MB
technical_196506.pdf
techsummary_196506.pdf
finance_196506.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.50 MB
Form6.pdf
Tender Documents • 0.41 MB
Form8.pdf
Tender Documents • 0.83 MB
TC.pdf
Tender Documents • 0.34 MB
BOQ_196506.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .