Tender Value
₹42.5 L
EMD Value
₹42,600
Closing Date
17 Nov 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Officer, Veraval-Patan Joint Nagarpalika, Veraval
PROPOSED ESTIMATE FOR BITUMEN ROAD WORK AT VERAVAL, DIST. GIR-SOMNATH (PACKAGE-IOJN-26-27)
363488
Muni./P.W.D./1714
Open
Civil Works - Roads
Works
Gir Somnath
3 documents required · 3 mandatory
₹1,500
Veraval Patan Joint Municipality Veraval
₹42,600
5 Nov 2026
5 Nov 2026
5 Nov 2026
17 Nov 2026
5 Nov 2026
120 days
Name of Work : PROPOSED ESTIMATE FOR BITUMEN ROAD WORK AT VERAVAL, DIST. GIR-
SOMNATH (PACKAGE-IOJN-26-27)
Estimated Unit Total Amount
Estimated Unit Total Amount
Rates according to
Item Total in Figure estimated
Item Descrption
No. Quantities quantities.
Box cutting the road surface to proper slope and
camber for making a base for road work including
removing the excavated stuff and depositing on the
1 road side slope as directed upto 50 M. (use material
spreding on the road side sholuder)
Providing and laying compacted W.B.M. 150 mm.
thick of Grading-II B.T. metal of size 45 mm to
mm in two layers including using 13% Stone
screening 13.2 mm size and 7% stone dust as filler
including spreading, watering and consolidation by
268.50 vibratory roller etc. complete. 1290.78 Cu.Mt. ₹
Providing and laying 75mm thick Built up spray
grout in two layers using black crashed stone
aggregate as per gradation and specification
including using cationic rapid setting emulsion for
tack coat at the rate of 4.00 kg./10 Sqm by
mechanical sprayer and bitumen of VG-30 grade for
3 mixing at the rate of 19.90kg/ M.T. by weight of total
mix (i.e. 1.99%) and mixing the aggregate and
bitumen by continuous batching drum mix plant and
spreading the same by paver finisher and
consolidation by vibrator roller including cost of all
materials, fuel, labours, tools and plants, using
268.50 contractor's own machineries 2757.30 M.T ₹
Providing and laying 50mm thick compacted
bitumenous macadam using black crushed stone
aggregate and filler material as per gradation of
M.O.R.T. & H. specification including using catonic
rapid setting emulsion for tack coat at the rate of
2.50 kg/10 sqm., by mechanical sprayer and
bitumen of 60-70 grade for mixing at the rate of
4 34.00Kg/M.T. by weight of total mix (i.e.3.4%) and
mixing the aggregate and bitumen by continuous
drum mix plant and spreading the same by paver
finisher and consolidation by vibratory roller
including cost of all materials, fuel, labours, tools
and plants, using contractor's own machineries.
Estimated Unit Total Amount
Estimated Unit Total Amount
Rates according to
Item Total in Figure estimated
Item Descrption
No. Quantities quantities.
Providing and laying 25mm thick semi dence
bitumenous concrete using black crushed stone
aggregate and filler materials as per gradation of
M.O.R.T & H. specification including using bitumen
of 60-70 grade of mixing at the rate of
Kg/M.T. by weight of total mix (i.e. 5.00%) and
mixing the aggregate and bitumen by continuous
drum mix plant and spreading the same by paver
finisher and consolidatoin by vibratory roller
including cost of all materials, fuel, labours, tools
and plants, using contractor's own machineries.
Providing and laying asphalt painting (VG-30 grade)
on B.T surface using bulk asphalt @ 5.00 kg/10
sqm & spreading stone dust @0.03 cum/10 sqm on
painted surface including cost of asphalt & stone
dust & all labour work incl. rolling with PTR roller etc
4942.50 complete. 47.47 Sq.Mt. ₹
Road marking with hot applied thermoplastic paints
with reflectorising glass beads on bitumin surface
providing and laying a hot applied thermoplastic
compound 2.5 mm thick including reflectorising
glass beads @ 250gms per sqm area, thickness of
2.5mm is excluding of surface applied glass beds
as per IRC:35-2015. The finished surface to be
level, uniform and free from streaks and holes.
zebra patta /bump patta lane/center line/ edge
7 line/cut patta. The white color marking should
provide liminance coefficinet on cemend road shalll
be min 130 mcd/m2/lux and Asphalt Road shall be
min 100 mcd/m2/lux during the service life during
the day time. The marking should meet the
performance criteria for night time reflectivity, wet
reflectivity and skid resistance as mentioned in the
section-15 of IRC 35-2015. Warranty for the Retro
reflectivity should be two years.
Supplying and fixing cat eye (Stimsonite) made out
from Acrilo beautile sterine injuction high
compressed molding with reflector made of MMC
(prismatic type of size 12cm x 6cm x 2.5cm)
provided with bituminous adhesive 100g. with each
174.00 unit for fixing. (Engineer grade) 217.40 No. ₹
Tracing of old Manhole. All Types Of Manhole at
Scarifying gravelled macadam or bitumen macadam
surface 6 cm to 10 cm.depth including stacking
10 useful materials on road side and disposing off
remaining stuff.
Estimated Unit Total Amount
Estimated Unit Total Amount
Rates according to
Item Total in Figure estimated
Item Descrption
No. Quantities quantities.
Modification of Existing House Connection
Chambers, Risening up to 23cm. average of 0.23m
wide R.c.c Copping with Inside 15mm Thick
Cement Plaster, Curing and Dismentaling existing
11 Chamber's Precast cement frame and Cover and
also fitting the copping work as directed as required
and also refitting of existing house connection
chamber's coller and cover as required..
Providing and laying cement concrete 1:3:6 (1-
cement : 3- coarse sand : 6- Crushed stone
12 aggregate 40 mm. Nominal size) and curing
complete excluding cost of form work in :(a)
51.40 Foundation and plinth 3301.69 Cu.Mt. ₹
All the work shall be carried out as per MOST specification and specification on the division or as
Rates quoted includes clearance of site (prior to commencement of work and at its closed) in all
2) respects and held gross for under all conditions, site moisture weather etc.
The Contractor shall exhibits a board as per Govt. circular No. 2DK – 3277 / 1657 N Dt. 26–01-73
3) with detail of specification and details of work and amount involved at site without any payment as
directed by the Engineer in charge.
Testing of materials be as per statement attached with the Specifications, the materials shall be
tested in G.E.R.I. Bill for testing shall be paid by the CHIEF OFFICER and 1% of the (one percent) of
4) amount put to tender after shall be recovered from the running account bills of the works. (As per
G.R. (R&B) Deptt., No. TNC/1085/4/C dtd. 20.12.91.
5) The contractor shall quote even "NIL" if no reduction is proposed.
One precent of estimated cost put to tender for this work shall be recovered from the contract
payments as "LABOUR CESS". In terms of the Gujarat Government Gazette Extra ordinary dated
6) 12.12.04. Implementation of building and other construction workers regulation of equipments and
conditions of service Act-1996)
Photographs of before work and after work will be submitted by the contractor at the time of Each bill
The contractor is solely responsible to bare all applicable taxes. I.e. GST etc. and department will not
8) entertain any contractor representation to reimburse any financial burden due to applicable taxes :
Signature of contractor
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
001_DTP_10_R0.pdf
002_Schedule-B Upload 10_R0 - Copy.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .