| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.8 LAccepted-AOC GRAM PO ULLI CHOUBTTAKHAL DISTRICT PAURI GARHWAL | PAURI GARHWAL | UTTARAKHAND | 246001 | L1 | Accepted-AOC AOC | |
| 2 | L2₹29.5 L+₹67,809.40 (2.36%)Rejected-Finance | L2 | Rejected-Finance Second Lowest | |
| 3 | L3₹33.9 L+₹5.1 L (17.8%)Rejected-Finance | L3 | Rejected-Finance Third Lowest | |
| 4 | L4₹34.2 L+₹5.4 L (18.8%)Rejected-Finance | L4 | Rejected-Finance Fourth Lowest | |
| 5 | L5₹35.0 L+₹6.2 L (21.5%)Rejected-Finance | L5 | Rejected-Finance Fifth Lowest |
Tender Value
₹38 L
EMD Value
₹76,000
Closing Date
29 Jun 2024, 5:00 pmClosed
Project Manager
Project Manager,Temp Construction Unit, Uttrakhand Peyjal Nigam, Pauri Garhwal
CONSTRUCTION OF RETAINING WALL AT GOVT. POLYTECHNIC PABAO (CHOPRIYOUN), BLOCK - PABAO , DISTT. - PAURI GRAHWAL
2024_MDPEY_72348_1
430/G-5 /21 Date 13-06-2024
Open Tender
Civil Works
Item Rate
180 days
PABAO, DISTT. - PAURI GRAHWAL
Please refer tender document
3 documents required · 3 mandatory
₹3,540
PM,Temp.Const.Unit, UKPJN, Pauri
₹76,000
26 Jun 2025
14 Jun 2024
2 Jul 2024
14 Jun 2024
29 Jun 2024
15 Jun 2024
Amount
Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction
Concrete with cement, coarse sand and 40 mm gauge stone ballast in proportion 1:4:8 in foundations and floors including supply of all material, labour and T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203
Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203 of MORD Specifiction
Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more
Centering and shuttering including strutting, propping etc. and removal of form for :Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two or more coats on new work
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
Providing and laying 60mm thick faciory made cement concrete interlocking paver block of M -30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50mm thick compacted bed of coarse sand, filling the joints with line sand etc. all complete as per the direction of Engineer-in-charge.
M/s Shantanu Associates
M/S KUSUM CONSTRUCTION
M/s Rakesh Kumar Contractor
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_86792.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .