Tender Value
₹1.1 Cr
EMD Value
₹2.1 L
Closing Date
27 Aug 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
ELECT TRD
14 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnover of 'V/N or V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheet duly certified by the Chartered Accountant/Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii)One similar work costing not less than the amount equal to 60% of advertised value of the tender. (b)(1) In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or (iii)One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender.
Defination of Similar Work :- Design, supply, erection, testing & commissioning of new construction or modification/replacement/augmentation of existing installations of (1) 50 Hz, single phase 25kV AC OHE system or 25kV AT feeding system (2x25kV) OR (2) 66kV and above rating transmission lines including erection of transmission towers and foundation work of 66KV or above voltage level in Railway/state electricity Board/Power Grid Corporation/DISCOMs/NHPC or any other PSU/Govt organization.
27 conditions · 6 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
The tenderer shall clearly specify whether the tender issubmitted on his own (Proprietary Firm) or on behalf of aPartnership Firm / company / Joint Venture (JV) / RegisteredSociety / Registered Trust / Hindu Undivided Family (HUF) /Limited Liability Partnership (LLP) etc. The tenderer(s) shallenclose the attested copies of the constitution of their concern,and copy of PAN Card along with their tender. TenderDocuments in such cases are to be signed by such persons asmay be legally competent to sign them on behalf of the firm,company, association, trust or society, as the case may be. Incase of Partnership firm / Joint Venture (JV) / Hindu UndividedFamily(HUF) / Limited Liability Partnership(LLP)or Partners ofPartnership firm/LLP/etc., the firm should submit the valid Powerof Attorney, Partnership Deed/Article ofAssociation/Memorandum of Association, Board of Resolution,Certificate of Incorporation along with the tender. If the firm issole proprietor firm, the bidder should submit the supportingdocument of sole proprietorship firm.
tenderer should quote his offer along with GST and other taxes
For all the tenders having advertised cost of Rs 10 lakh orabove, the contractor shall have the option to take paymentfrom Railways through a letter of credit (LC) arrangement. Thetenderer shall affirm having read over and agreed to the termsand conditions of the LC option. ivThe above option of takingpayment through LC arrangement, once exercised by tendererat the time of bidding, shall be final and no change shall bepermitted, thereafter, during execution of contract. (TheTenderer should be submit his/their opinion for taking paymentthrough letter of credit (LC) arrangement).
The Bid Security shall be rounded off to the nearest 100. ThisBid Security shall be applicable for all modes of tendering. Anyfirm recognized by Department of Industrial Policy andPromotion (DIPP) as 'Startups' shall be exempted from paymentof Bid Security detailed above. Labour Cooperative Societiesshall submit only 50% of above Bid Security detailed above.Subject to exemptions provided above document, the tendermust be accompanied by a Bid Security as mentioned, failingwhich the tender shall be summarily rejected.
The tenderer shall submit along with the tender document,documents in support of his/their claim to fulfill the eligibilitycriteria as mentioned in the tender document. Each page of thecopy of documents/certificates in support of credentials,submitted by the tenderer, shall be self- attested/digitally signedby the tenderer or authorized representative of the tenderingfirm. Self-attestation shall include signature, stamp and date (oneach page). Only those documents which are declared explicitlyby the tenderer as "documents supporting the claim ofqualifying the laid down eligibility criteria", will be considered forevaluating his/their tender
A certificate may be uploaded along with the offer that theTenderer(s) has/have gone through all the conditions of contractand rates, specifications, etc. embodied in Indian RailwayStandard General Condition of Contract-2022 with correctionSlips up to the date of closing of the tender.
1.The Railway reserves the right to verify all statements,information and documents submitted by the bidder in histender offer, and the bidder shall, when so required by theRailway, make available all such information, evidence anddocuments as may be necessary for such verification. Any suchverification or lack of such verification, by the Railway shall notrelieve the bidder of its obligations or liabilities hereunder norwill it affect any rights of the Railway there under. 2.a) In case ofany information submitted by tenderer is found to be falseforged or incorrect at any time during process for evaluation oftenders, it shall lead to forfeiture of the tender Bid Securitybesides banning of business for a period of upto two years. (b) Incase of any information submitted by tenderer is found to befalse forged or incorrect after the award of contract, the contractshall be terminated. Bid Security, Performance Guarantee andSecurity Deposit available with the railway shall be forfeited. Inaddition, other dues of the contractor, if any, under this contractshall be forfeited and agency shall be banned for doing businessfor a period of upto two years.
FAMILARISATION: Tenderer should visit the site of the aboveworks and have familiarized him self/them selves of the workingconditions therein in all respects and in particular the following:1. Topography of the area, 2. Conditions at the site of work, 3.Availability of local labour, both skilled and un skilled and theprevailing labour rate, 4. Availability of Water and Electricity, 5.The existing roads and access to the site of work, 6. Availabilityof space for putting labour camps, offices, stores, go down,engineering yard etc. NOTE: The FAMILARISATION certificateshall be submitted by the tenderer as per format attached atAnnexures.
The tenderer should go through all the eligibility conditions (likeSpecial Technical Criteria, Standard Technical Criteria, StandardFinancial criterial etc.) as mentioned in the document andsubmit relevant documents and fill the enclosedformats/annexures in support of the condition. All thedocuments should be in legible format
TRD works in connection with Provision of turn table along with yard modification in RYD & NCC in WMY under ADEN/MYD/VSKP
VSKP-TRD-67-24-25DT030826~SCOR
VSKP-TRD-67-24-25DT030826
Open
Works - General
11 Months
Visakhapatnam, Andhra Pradesh
₹0
₹2.1 L
27 Aug 2026
3 Aug 2026
13 Aug 2026
283 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 1,07,33,520.85 | ||
| — | 2.50 | — | — | ||
| Preparation of Design & drawing for OHE | — | — | — | 48,365 | |
| — | 202.00 | — | — | ||
| Concrete for foundation & plinth in other than hard and rocky soil | — | — | — | 15,39,442 | |
| — | 28.00 | — | — | ||
| Supply of Traction Mast | — | — | — | 29,00,688 | |
| — | 20.00 | — | — | ||
| Erection of Traction Mast (in PB) | — | — | — | 2,64,680 | |
| — | 8.00 | — | — | ||
| Erection of Traction Mast (in NPB) | — | — | — | 51,792 | |
| — | 1.25 | — | — | ||
| Supply of Small Part Steel | — | — | — | 1,71,016.25 | |
| — | 1.00 | — | — | ||
| Erection of Small Part Steel (in PB) | — | — | — | 11,715 | |
| — | 0.25 | — | — | ||
| Erection of Small Part Steel (in NPB) | — | — | — | 1,412.5 | |
| — | 40.00 | — | — | ||
| Supply of single bracket assembly for conventional OHE with SPS | — | — | — | 10,80,440 | |
| — | 20.00 | — | — | ||
| Erection of single bracket assembly for conventional OHE with SPS (in PB) | — | — | — | 47,900 | |
| — | 20.00 | — | — | ||
| Erection of single bracket assembly for conventional OHE with SPS (in NPB) | — | — | — | 32,420 | |
| — | 2.00 | — | — | ||
| Supply of solid core cut-in insulator :component | — | — | — | 6,060 | |
| — | 1.00 | — | — | ||
| Erection of Solid core cut-in-Insulator- Component (in PB) | — | — | — | 2,610 | |
| — | 1.00 | — | — | ||
| Erection of Solid core cut-in-Insulator- Component (in NPB) | — | — | — | 1,102 | |
| — | 2.00 | — | — | ||
| Supply of S/I assembly | — | — | — | 66,080 | |
| — | 2.00 | — | — | ||
| Supply of Core Insulator | — | — | — | 14,160 | |
| — | 1.00 | — | — | ||
| Erection of S/I assembly (in PB) | — | — | — | 10,515 | |
| — | 1.00 | — | — | ||
| Erection of S/I assembly (in NPB) | — | — | — | 4,723 | |
| — | 2.00 | — | — | ||
| Supply of Solid core suspension Insulator - Component | — | — | — | 7,896 | |
| — | 1.00 | — | — | ||
| Erection of Solid core suspension Insulator - Component (in PB) | — | — | — | 2,623 | |
| — | 1.00 | — | — | ||
| Erection of Solid core suspension Insulator - Component (in NPB) | — | — | — | 1,417 | |
| — | 8.00 | — | — | ||
| Supply of Guy rod assembly including mast anchor/guy rod attachment. | — | — | — | 1,31,968 | |
| — | 4.00 | — | — | ||
| Erection of Guy rod assembly including mast anchor/guy rod attachment (in PB) | — | — | — | 9,696 | |
| — | 4.00 | — | — | ||
| Erection of Guy rod assembly including mast anchor/guy rod attachment (in NPB) | — | — | — | 4,740 | |
| — | 2.00 | — | — | ||
| Supply of Regulating equipment 3 pulley type with counter weight assembly, guide tube for conventional OHE. | — | — | — | 3,78,538 | |
| — | 1.00 | — | — | ||
| Erection of Regulating equipment 3 pulley type with counter weight assembly, guide tube for conventional OHE (in PB) | — | — | — | 11,556 | |
| — | 1.00 | — | — | ||
| Erection of Regulating equipment 3 pulley type with counter weight assembly, guide tube for conventional OHE (in NPB) | — | — | — | 4,896 | |
| — | 4.00 | — | — | ||
| Supply of Component for Termination of double conductor of OHE | — | — | — | 75,240 | |
| — | 2.00 | — | — | ||
| Erection of Termination of double conductor of OHE (in PB) | — | — | — | 6,390 | |
| — | 2.00 | — | — | ||
| Erection of Termination of double conductor of OHE (in NPB) | — | — | — | 3,078 | |
| — | 3.00 | — | — | ||
| Supply of Component for Anti-Creep with Cadmium copper catenary wire | — | — | — | 52,068 | |
| — | 2.00 | — | — | ||
| Erection of Anti-Creep with Cadmium copper catenary wire (in PB) | — | — | — | 5,468 | |
| — | 1.00 | — | — | ||
| Erection of Anti-Creep with Cadmium copper catenary wire (in NPB) | — | — | — | 1,551 | |
| — | 20.00 | — | — | ||
| Supply of 25 KV Post Insulator | — | — | — | 98,640 | |
| — | 20.00 | — | — | ||
| Supply of Component for 25Kv Post Insulator | — | — | — | 18,020 | |
| — | 10.00 | — | — | ||
| Erection of 25Kv Post Insulator(in PB) | — | — | — | 11,600 | |
| — | 10.00 | — | — | ||
| Erection of 25Kv Post Insulator in NPB | — | — | — | 4,280 | |
| — | 80.00 | — | — | ||
| Supply of 36/28mm busbar | — | — | — | 85,120 | |
| — | 40.00 | — | — | ||
| Erection of of 36/28mm busbar (in PB) | — | — | — | 25,640 | |
| — | 40.00 | — | — | ||
| Erection of of 36/28mm busbar(in NPB) | — | — | — | 11,480 | |
| — | 6.00 | — | — | ||
| Supply of Connector & Terminal | — | — | — | 31,272 | |
| — | 3.00 | — | — | ||
| Erection of Connector & Terminal (in PB) | — | — | — | 4,071 | |
| — | 3.00 | — | — | ||
| Erection of of Connector & Terminal(in NPB) | — | — | — | 1,605 | |
| — | 2.00 | — | — | ||
| Supply of Single Pole Isolator with insulators (1600A) | — | — | — | 1,13,280 | |
| — | 4.00 | — | — | ||
| Supply of Earth contact Assembly | — | — | — | 52,140 | |
| — | 4.00 | — | — | ||
| Supply and Erection of Interlocking Device between SPI& DPI | — | — | — | 62,716 | |
| — | 1.00 | — | — | ||
| Erection of 25KV Single Pole Isolator with inter locking arrangement (in PB) | — | — | — | 9,230 | |
| — | 1.00 | — | — | ||
| Erection of 25KV Single Pole Isolator with inter locking arrangement (in NPB) | — | — | — | 4,535 | |
| — | 2.00 | — | — | ||
| Supply of 25KV Double Pole Isolator with insulators (1600 A) | — | — | — | 1,93,284 | |
| — | 1.00 | — | — | ||
| Erection of 25KV Double Pole Isolator with earth contact assembly inter locking arrangement (in PB) | — | — | — | 9,434 | |
| — | 1.00 | — | — | ||
| Erection of 25KV Double Pole Isolator with earth contact assembly inter locking arrangement (in NPB) | — | — | — | 4,687 | |
| — | 60.00 | — | — | ||
| Supply of Structure Bond. | — | — | — | 42,840 | |
| — | 60.00 | — | — | ||
| Erection of Structure Bond | — | — | — | 4,440 | |
| — | 20.00 | — | — | ||
| Supply of Longitudinal Bond (C-Bond for X-over) | — | — | — | 11,080 | |
| — | 20.00 | — | — | ||
| Erection of Longitudinal Bond (C-Bond for X-over) | — | — | — | 1,340 | |
| — | 20.00 | — | — | ||
| Supply of Transverse/ Special Bond | — | — | — | 15,020 | |
| — | 20.00 | — | — | ||
| Erection of Transverse/ Special Bond | — | — | — | 1,580 | |
| — | 20.00 | — | — | ||
| Transfer of equipment from one Mast/ Support to another/ same mast or support in PB | — | — | — | 1,49,940 | |
| — | 10.00 | — | — | ||
| Transfer of equipment from one Mast/ Support to another/ same mast or supportin NPB | — | — | — | 33,810 | |
| — | 10.00 | — | — | ||
| Provision of an additional bracket assembly on a mast or support in PB | — | — | — | 22,200 | |
| — | 10.00 | — | — | ||
| Provision of an additional bracket assembly on a mast or support in NPB | — | — | — | 11,230 | |
| — | 20.00 | Each Span | — | ||
| Slewing of OHE in PB | — | — | — | 4,57,520 | |
| — | 80.00 | Each Span | — | ||
| Adjustment of existing OHE | — | — | — | 43,360 | |
| — | 80.00 | Each Span | — | ||
| Tower wagon checking | — | — | — | 43,360 | |
| — | 4.00 | — | — | ||
| Supply of Contact wire splice | — | — | — | 4,600 | |
| — | 2.00 | — | — | ||
| Erection of Contact wire splice (in PB) | — | — | — | 18,816 | |
| — | 2.00 | — | — | ||
| Erection Contact wire splice (in NPB) | — | — | — | 9,700 | |
| — | 10.00 | — | — | ||
| Supply of Catenary splice | — | — | — | 6,190 | |
| — | 5.00 | — | — | ||
| Erection of Catenary splice (in PB) | — | — | — | 43,560 | |
| — | 5.00 | — | — | ||
| Erection of Catenary splice (in NPB) | — | — | — | 21,405 | |
| — | 0.20 | — | — | ||
| Dismantling of OHE in PB | — | — | — | 16,725 | |
| — | 4.00 | — | — | ||
| Dismantling of Mast/ Structure upright etc. (by cutting) In PB | — | — | — | 34,316 | |
| — | 4.00 | — | — | ||
| Dismantling of Cantilever In PB | — | — | — | 8,148 | |
| — | 2.00 | — | — | ||
| Dismantling of Small parts steel In PB | — | — | — | 27,820 | |
| — | 4.00 | — | — | ||
| Retrival of Mast / TTU from Solid Core foundations without damage or leaning of Mast In PB | — | — | — | 49,152 | |
| — | 20.00 | — | — | ||
| Dismantling of any type of bond | — | — | — | 1,120 | |
| — | 2.00 | — | — | ||
| Dismantling of Section Insulator (in PB) | — | — | — | 15,940 | |
| — | 2.00 | — | — | ||
| Dismantling of Portal/TTC Boom Assembly In PB | — | — | — | 27,780 | |
| — | 4.00 | — | — | ||
| Dismantling of Guy Rod Assembly In PB | — | — | — | 8,652 | |
| — | 4.00 | — | — | ||
| Dismantling of Guy Rod Assembly In NPB | — | — | — | 4,440 | |
| — | 2.00 | — | — | ||
| Dismantling of Anti-Creep In PB | — | — | — | 28,464 | |
| — | 2.00 | — | — | ||
| Dismantling of Anti-Creep In NPB | — | — | — | 10,722 | |
| — | 2.00 | — | — | ||
| Dismantling of Regulating equipment with counter weight assembly In PB | — | — | — | 19,128 | |
| — | 2.00 | — | — | ||
| Dismantling of Regulating equipment with counter weight assembly In NPB | — | — | — | 10,066 | |
| — | 20.00 | — | — | ||
| Dismantling of existing caution Boards in PB | — | — | — | 4,700 | |
| — | 20.00 | — | — | ||
| Dismantling of existing caution Boards in NPB | — | — | — | 3,780 | |
| — | 20.00 | — | — | ||
| Dismantling of C/G/ATJ/Al. Jumper with PG clamps | — | — | — | 4,400 | |
| — | 10.00 | — | — | ||
| Dismantling of Solid Core Suspension insulator with SPS in PB | — | — | — | 17,660 | |
| — | 10.00 | — | — | ||
| Dismantling of Solid Core Suspension insulator with SPS in NPB | — | — | — | 8,830 | |
| — | 6.00 | — | — | ||
| Supply of Single Earth Electrode | — | — | — | 26,400 | |
| — | 6.00 | — | — | ||
| Erection of Single Earth Electrode | — | — | — | 15,414 | |
| — | 20.00 | — | — | ||
| Supply of Single Bracket assembly for Tram way type OHE | — | — | — | 3,13,000 | |
| — | 10.00 | — | — | ||
| Erection of Single Bracket assembly for Tram way type OHE (in PB) | — | — | — | 26,150 | |
| — | 10.00 | — | — | ||
| Erection of Single Bracket assembly for Tram way type OHE (in NPB) | — | — | — | 13,780 | |
| — | 2.00 | — | — | ||
| Supply of Regulating Equipment's three pulley type with counter weight assembly for Tram Way OHE. | — | — | — | 2,88,192 | |
| — | 2.00 | — | — | ||
| Erection of Regulating Equipments three pulley type with counter weight assembly for Tram Way OHE (in PB) | — | — | — | 20,792 | |
| — | 2.00 | — | — | ||
| Erection of Regulating Equipments three pulley type with counter weight assembly for Tram Way OHE (in NPB) | — | — | — | 9,792 | |
| — | 2.00 | — | — | ||
| Supply of Component for Termination of Tram Way Type OHE regulated | — | — | — | 13,880 | |
| — | 1.00 | — | — | ||
| Erection of Termination of Tram Way Type OHE regulated (in PB) | — | — | — | 4,111 | |
| — | 1.00 | — | — | ||
| Erection of Termination of Tram Way Type OHE regulated (in NPB) | — | — | — | 2,059 | |
| — | 0.80 | — | — | ||
| Erection of contract wire along with supply of required components (Regulated with bridle ) in PB | — | — | — | 1,49,745.6 | |
| — | 2.50 | — | — | ||
| Erection of OHE(in PB) | — | — | — | 3,09,572.5 | |
| — | 4.00 | — | — | ||
| Supply of additional fitting for turnout or overlap for extra materials | — | — | — | 17,128 | |
| — | 2.00 | — | — | ||
| Erection of additional fitting for turnout or overlap for extra materials in PB | — | — | — | 4,718 | |
| — | 2.00 | — | — | ||
| Erection of additional fitting for turnout or overlap for extra materials in NPB | — | — | — | 1,842 | |
| — | 10.00 | — | — | ||
| Supply of Copper jumper(C-jumper & anti-theft) | — | — | — | 55,690 | |
| — | 5.00 | — | — | ||
| Erection of Copper jumper(C-jumper & anti-theft) (in PB) | — | — | — | 2,145 | |
| — | 5.00 | — | — | ||
| Erection of Copper jumper(C-jumper & anti-theft) (in NPB) | — | — | — | 805 | |
| — | 200.00 | — | — | ||
| Supply of 50 x 6 mm MS Flat | — | — | — | 46,000 | |
| — | 100.00 | — | — | ||
| Laying of 50 x 6 mm MS Flat in the Ground | — | — | — | 9,300 | |
| — | 100.00 | — | — | ||
| Laying of 50 x 6 mm MS Flat exposed | — | — | — | 8,600 | |
| — | 200.00 | — | — | ||
| "PVC Sleeve of 3 to 5 mm thickness suitable for Structure Bond of M.S. Flat of size 40x6 mm. IS 5831:1984" | — | — | — | 11,800 | |
| — | 20.00 | — | — | ||
| Supply of Cadmium Copper Large span wire (130 sqmm) | — | — | — | 22,840 | |
| — | 20.00 | — | — | ||
| Erection of Cadmium Copper Large span wire (130 sqmm) (in PB) | — | — | — | 2,120 | |
| — | 20.00 | — | — | ||
| Supply of Retro reflective Caution Board for 25KV Traction | — | — | — | 15,440 | |
| — | 20.00 | — | — | ||
| Erection of Retro reflective Caution Board for 25KV Traction | — | — | — | 1,420 | |
| — | 20.00 | — | — | ||
| Supply of Retro reflective Danger Board for 25KV | — | — | — | 15,440 | |
| — | 20.00 | — | — | ||
| Erection of Retro reflective Danger Board for 25KV | — | — | — | 1,420 | |
| — | 20.00 | — | — | ||
| Supply of Retro reflective Caution Board (Un-wired Turn-out) | — | — | — | 45,160 | |
| — | 20.00 | — | — | ||
| Erection of Retro reflective Caution Board (Un-wired Turn-out) | — | — | — | 7,260 | |
| — | 20.00 | — | — | ||
| Supply of Retro reflective Public Caution Board. In three languages | — | — | — | 30,500 | |
| — | 20.00 | — | — | ||
| Erection of Retro reflective Public Caution Board. In three languages | — | — | — | 2,720 | |
| — | 20.00 | — | — | ||
| Supply of Retro reflective Elect.Engine Stop Board | — | — | — | 43,600 | |
| — | 20.00 | — | — | ||
| Erection of Retro reflective Elect.Engine Stop Board | — | — | — | 5,720 | |
| — | 20.00 | — | — | ||
| Supply of Retro reflective Working limit Board (Power Block) | — | — | — | 16,640 | |
| — | 20.00 | — | — | ||
| Erection of Retro reflective Working limit Board (Power Block) | — | — | — | 6,440 | |
| — | 20.00 | — | — | ||
| Supply of Retro reflective danger board for height guages | — | — | — | 33,840 | |
| — | 20.00 | — | — | ||
| Erection of Retro reflective danger board for height guages | — | — | — | 8,960 | |
| — | 20.00 | — | — | ||
| Supply of Retro reflective Caution Board 25KV (Nearby OHE ) | — | — | — | 11,240 | |
| — | 20.00 | — | — | ||
| Erection of Retro reflective Caution Board 25KV (Nearby OHE ) | — | — | — | 1,120 | |
| — | 1.00 | — | — | ||
| Supply of Sectioning Diagram Board | — | — | — | 15,828 | |
| — | 1.00 | — | — | ||
| Erection of Sectioning Diagram Board | — | — | — | 1,255 | |
| — | 2.00 | — | — | ||
| Supply of Electric Shock Treatment Chart. | — | — | — | 6,260 | |
| — | 2.00 | — | — | ||
| Erection of Shock Treatment Chart. | — | — | — | 494 | |
| — | 60.00 | — | — | ||
| Supply of Retro Reflective Number Plates | — | — | — | 66,900 | |
| — | 60.00 | — | — | ||
| Erection of Retro Reflective Number Plates | — | — | — | 3,660 | |
| — | 20.00 | — | — | ||
| Supply of Retro reflective Sigma Sign Board | — | — | — | 18,640 | |
| — | 20.00 | — | — | ||
| Erection of Retro reflective Sigma Sign Board | — | — | — | 940 | |
| — | 8.00 | — | — | ||
| Catenary wire ending clamps | — | — | — | 4,464 | |
| — | 8.00 | — | — | ||
| Contact wire ending clamps | — | — | — | 2,360 | |
| — | 10.00 | — | — | ||
| Erection o f contact wire under FOB & splicing with catenary by means of ending clamps | — | — | — | 52,810 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
AnnexureVVA.pdf
ATTACHMENT
Annexure-1.pdf
ATTACHMENT
GCC2022_1.pdf
ATTACHMENT
TenderConditions.pdf
ATTACHMENT
SCOPEOFWORKTURNTABLE_1.pdf SCOPE OF WORK
ATTACHMENT
SCOPEOFWORKTURNTABLE_1.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .