| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.7 LAccepted-Finance | L1 | Accepted-Finance L1 bidder | |
| 2 | L2₹12.4 L+₹68,699 (5.87%)Accepted-Finance | L2 | Accepted-Finance L2 bidder | |
| 3 | L3₹13.7 L+₹2.0 L (17.2%)Accepted-Finance | L3 | Accepted-Finance L3 bidder | |
| 4 | L4₹15.0 L+₹3.3 L (28.0%)Accepted-Finance B 383 KANCHIRAM NAGAR MORADABAD | L4 | Accepted-Finance L4 bidder |
Tender Value
₹15.0 L
EMD Value
₹16,000
Closing Date
1 Jan 2024, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE ETC I, Lucknow
Pareshan Bhawan, Vibhuti Khand, Luciknow
Work
2023_UPTCL_868373_1
E-tender 73/2023-24
Open Tender
Electrical Works
Piece-work
30 days
Lucknow
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
A/c No 2408002190005438, IFS PUNB0691100, PNB, Lko
₹16,000
16 Jan 2024
6 Dec 2023
2 Jan 2024
6 Dec 2023
1 Jan 2024
6 Dec 2023
Amount
(A) SUPPLY
1) Supply of Bolted type single tension fitting suitable for Twin Moose conductor without Turn buckle ,D-socket, Ball assembly hook ,yoke,plate, d-clip, tension clamp etc with duly made of LM6 aluminium alloy complete with GI nuts and bolt and spring/plain washer as per sample
2) Supply of PG clamp duly made of LM6 aluminium alloy suitable For Moose/Moose complete with 4 no. 16x90mm size GI nuts and bolt and spring/plain washer as per sample.
3) Supply of PG clamp duly made of LM6 aluminium alloy suitable For Moose/Zebra complete with 4 no. 16x90mm size GI nuts and bolt and spring/plain washer as per sample
4) Supply of PG clamp duly made of LM6 aluminium alloy suitable For Moose/Panther complete with 4 no. 16x90mm size GI nuts and bolt and spring/plain washer as per sample.
5) Supply of PG clamp duly made of LM6 aluminium alloy suitable For Zebra/Zebra complete with 4 no. 16x90mm size GI nuts and bolt and spring/plain washer as per sample.
6) Supply of PG clamp duly made of LM6 aluminium alloy suitable For Panther/Panther complete with 4 no. 16x90mm size GI nuts and bolt and spring/plain washer as per sample.
7) Supply of Bus Post Clamp Suitable For Moose duly made of LM6 aluminium alloy complete with 4 no. 16x90mm size GI nuts and bolt and spring/plain washer as per sample.
8) Supply of 132KV CB clamp made of LM6 one side connecting single Moose conductor and another side connecting with theCB plate complete with clamp HDG nut - bolts and washer as per sample as per sample
9) Supply of 132KV isolator clamp made of aluminium alloy LM6 one side connecting Moose conductor and another side connecting with the Isolator Thimble/ plate complete with clamp HDG nut - bolts and washer as per sample
10) Supply of Spacers for Twin Moose conductor 100mm spacing as per technical specification.
(B) Work
11) Opening/cutting of R, Y &B phase of ACSR Moose jumper OF 132KV existing Main Bus made of Moose conductor between bus sections below gantries step by step during bus bar replacement work also includes dismantling by all associated clamps/fitting .(1 job includes all 3 phases)
12) Dismantling of R,Y,B existing jumper of ACSR Panther conductor of 132 KV Hanuman Setu and 132 Bus Coupler Bay feeder bay from Main bus bar by opening of all associated clamps step by step during Bus replacement.
13) Dismantling of 132 KV old main bus bar R,Y&B phase bus section of Moose conductor and lowering down of conductor from substation gantry to complete dismantling works including dismantling all associated tension clamps &fitting to complete job satisfactorily. (1 job includes 1 phase)
14) Fixing/Erection of quadruple Moose suspension fitting under bus section of Main bus below gantries with suitable hardware such as hoisting disc insulators etc. to complete job satisfactorily. (1 job includes all 3 phases)
15) Stringing and proper sagging of New 132kv Main Bus bar (R, Y& B) by Twin Moose conductor the work includes fitting of tension clamps, hoisting of 70KN disc insulator tension fitting, spacers, ,P-G clamp, and cutting conductor as per requirements etc. to complete job satisfactorily. (1 job includes 1 phase)
16) Reconnecting of R, Y & B Phase of 132KV main bus bar of Twin Moose conductor between bus sections below gantries step by step during bus replacement with help of suitable PG clamps through quadruple suspension fitting &spacers etc, conductor cutting as per requirement.(1 job includes all 3 phases)
17) Reconnecting new jumper of ACSR zebra conductor of 132 KV Hanuman Setu and 40 MVA T/F HV Side Bay of R, Y &B Phase from 132 KV main bus bar made of Twin Moose conductor with help of suitable PG clamps through quadruple suspension fitting &spacers etc, conductor cutting as per requirement.
18) Opening/cutting of R, Y & B phase of ACSR Moose jumper from 33 KV existing Main Bus made of Moose conductor between bus sections below gantries step by step during bus bar replacement work . also includes dismantling by all associated clamps/fitting .(1 job includes all 3 phases)
19) Dismantling of existing jumper of Twin ACSR Zebra conductor of 33 Kv Spare, 33 Kv UPTRON, 33Kv Basantkunj, Two No. 33KV PT, 33 KV Bus Coupler, Malihabad ,Balaghat, Rajajipuram, 63MVA T/F -I, Station T/F-I feeder bay from Main bus bar by opening of all associated clamps step by step during Damaged 33 KV Bus replacement Work.
20) Dismantling of 33 KV old main bus bar R,Y& B phase bus section of Moose conductor and lowering down of conductor from substation gantry to complete dismantling works including dismantling all associated tension clamps &fitting to complete job satisfactorily. (1 job includes 1 phase)
21) Fixing/Erection of Moose suspension fitting under bus section of 33KV Main bus below gantries with suitable hardware such as hoisting disc insulators etc. to complete job satisfactorily. (1 job includes all 3 phases)
22) Stringing and proper sagging of New 33 kv Main Bus bar (R, Y& B) by Twin Moose conductor the work includes fitting of tension clamps, hoisting of 70KN disc insulator tension fitting, spacers, ,P-G clamp, and cutting conductor as per requirements etc. to complete job satisfactorily. (1 job includes 1 phase)
23) Reconnecting Jumpers of R, Y & B Phase of 33 KV main bus bar of Twin Moose conductor between bus sections below gantries step by step during bus replacement with help of suitable PG clamps through suspension fitting &spacers etc, conductor cutting as per requirement.(1 job includes all 3 phases)
24) Reconnecting new jumper of ACSR Twin zebra conductor of 33 Kv Spare, 33 Kv UPTRON, 33Kv Basantkunj, Two No. 33KV PT, 33 KV Bus Coupler, Malihabad ,Balaghat, Rajajipuram, 63MVA T/F -I, Station T/F-I bay of R, Y &B Phase of 33KV main bus bar of Twin Moose conductor during bus replacement with help of suitable PG clamps through quadruple suspension fitting &spacers etc, conductor cutting as per requirement.
25) Opening of panther jumpers from 33 KV jack bus bar from line isolator to Gantry of every Feeder bay including Opening of Panther dropper from 33 KV Jack Bus after opening/cutting its nuts & bolts of PG clamps and end clamps of 33 KV feeder ( 01 Job Includes one Jumper )
Modification in Hydrant System for New 63 MVA T/F Bay
26) Supply/fabrication and laying of following 'B' class M.S. Pipe above the ground as per drawing & specification complete with associated Elbow /Bend, Tee, Socket, Flanges etc. by due cutting, bending, welding etc.Above work also includes crossing of roads and cable trenches underground after digging of earth including re-concreting of road crossing as per standard ratio of RCC and filling & leveling of earth (Note- Underground Pipe Line should be anticorosive treated by bituminous painting of outer surfac and wrapping hot dip bitumen jute in two layers and pipeline above ground should be painted with one coat red oxide & two coat synthetic enamel paint of best quality ISI mark). Work includes jointing of Pipe from overhead Tank to Boring . work includes Extension of Hydrant system to New 63MVA T/F bay)
i) Supply/fabrication and laying of 100 NB dia. M.S. Pipe
ii) Supply/fabrication and laying of 80 NB dia. M.S. Pipe
iii) Supply/fabrication and laying of 25 NB dia. M.S. Pipe
27) Supply and installation of following M.S. Pipe accessories with associated fixture & fitting etc. :
i) 100/80 NB dia Double Flanged Sluice Valve/Butterfly valve
ii) NRV 100/80 mm dia. SIR make of working pressure 16 Kg/cm2
28) Supply & Installation of Gun Metal (GM/SS) single headed 63 mm Hydrant Post complete with all accessories, fixture & fitting such as GM/SS HydrantValve, M.S. Hose box, 1 x 15 m long RRL (reinforced rubber lined) hose with 63 mm dia GM/SS coupling GM branch Pipe / Nozzle etc. (1 Job for each Hydrant Post).
29) Construction of Guarders & RCC Foundation supports made in the ratio of 1:2:4 of Cement, Sand, Stone Ballast (20 mm) for fixing of M.S. Pipe Line with necessary Support Base Plate with due grouting of 4 No. Foundation Eye Bolts.
30) Pipe dismantling after cutting the Hydrant Pipe in regular pieces , opening of J-clamp and digging the Pipe and shifting the Pipe to store . (Work in Proposed 132kv Bus coupler bay & 33kv extension side)
31) Painting of newly erected Pipe following with 01 coat red oxide and 02 coat with enamel Red paint green ISI mark paint complete with its MS Flat & vertical support after removing rust using rage mall.
Erection of 33kV Transfer Bus Isolator
32) Opening of old & existing ACSR Panther conductor jumpers from Line Isolator to Post Insulator/Gantry
33) Erection of Equipments :- Erection of following equipments as per instruction manual of various equipment and technical specification including shifting of material/equipment from store to erection site including all other associated work to complete the job satisfactorily :-
i) 33 KV BI
34) Erection of main and auxiliary structure consisting of columns, beams, peaks, masts etc. and auxiliary structures required for installation of Bays ABL etc. including shifting of all material i.e. structure parts nuts, bolts washer etc. from store to site of erection, erection of structure as per drawings and practices using flat and spring washer with each bolt. Matching of holes, cutting, matching of member if required shall also be done by the contractor without any extra cost to complete the work satisfactorily. All material to be erected shall be supplied by the UPPTCL free of cost but all men, material and T&P required for satisfactorily completion of work shall be arranged by the contractor at his own cost.
35) Laying MS flat for Earthing of Structures/equipments by cutting,. bending , laying 700mm below ground level as per Corporation norms in the following way: Double earthing of all structure and equipments. One earthing will be from top and another from bottom by 50x6mm/75x10mm MS Flat to be provided by dept. free of cost.Work includes excavation and backfilling of soil
i) 25x6mm. MS Flat
ii) 50x6mm. MS Flat
36) Reconnecting new jumper of ACSR Twin Panther conductor of all 14bays of R, Y &B Phase from TBI to LI with help of suitable PG clamps etc, conductor cutting as per requirement.
MANAS ELECTRICALS
Gupta Elect and Engg Works
r s enterprises
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .