Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹70.0 CrAccepted-AOC | ₹70.0 Cr | L1 | Accepted-AOC Award of Contract |
| 2 | L2₹80.2 CrRejected-Finance | ₹80.2 Cr | L2 | Rejected-Finance Rejected being L2 |
| 3 | L3₹90.8 CrRejected-Finance | ₹90.8 Cr | L3 | Rejected-Finance Rejected being L3 |
| 4 | L4₹93.1 CrRejected-Finance | ₹93.1 Cr | L4 | Rejected-Finance Rejected being L4 |
| 5 | Rejected-Technical PRA HOUSE NEHRU PARK ROAD SURAJPUR SURAJPUR CHHATTISGARH 497229 | SURAJPUR | CHHATTISGARH | 497229 | - | - | Rejected-Technical Technically non responsive due to bidder did not submit shortfall documents on Defence e Procurement Portal. |
| Sl No | Description | Qty | Unit | M/S EMERGENT TECHNOLOGIES | A&T Infracon Private Limited | A.K Builders | NG Projects Limited |
|---|---|---|---|---|---|---|---|
| 1.00Construction on EPC mode of Greenfield Alignment to NHDL specifications with paved shoulder from Naku of design Km 0.00 To Nakula of design Km 9.130 of total design length 9.130 Km on road Chungthang-Lachen Monastery-Log Bridge-Muguthang-Naku Section (Nakula) (Part of NH-310AG) in the State of Sikkim under Project Swastik of BRO (Pkg-IX) (Job No 301/129) (Second Call) | |||||||
| 1.01 | Construction on EPC mode of Greenfield Alignment to NHDL specifications with paved shoulder from Naku of design Km 0.00 To Nakula of design Km 9.130 of total design length 9.130 Km on road Chungthang-Lachen Monastery-Log Bridge-Muguthang-Naku Section (Nakula) (Part of NH-310AG) in the State of Sikkim under Project Swastik of BRO (Pkg-IX) (Job No 301/129) (Second Call) | 1 | EPC | 69,98,29,785.2 ₹70.0 Cr | 90,75,17,733 ₹90.8 Cr | 80,15,74,269 ₹80.2 Cr | 93,13,45,500 ₹93.1 Cr |
Tender Value
₹107.7 Cr
EMD Value
₹2.1 Cr
Closing Date
24 Jun 2025, 5:00 pmClosed
CE (P) Swastik
HQ CE (P) Swastik Upper Burtuk Swastik, Gangtok Pin 737101, Sikkim
Construction on EPC mode of Greenfield alignment to NHDL specifications with paved shoulders from Naku of design km 0.00 to Nakula of design km 9.130 of total design length 9.130 km on road Chungthang-Lachen Monastry-Log Bridge-Muguthang-Naku section
2025_BRO_707049_1
CE(P)SWTK/02/2025-26/EPC
Open Tender
Civil Works - Roads
1095 days
On Road Naku to Nakula Km 0.00 to Km 9.130
As Per RFP
2 documents required · 2 mandatory
₹20,000
Chief Engineer Project Swastik
₹2.1 Cr
26 Nov 2025
8 May 2025
25 Jun 2025
8 May 2025
24 Jun 2025
9 Jun 2025
8 May 2025 - 2 Jun 2025
Construction on EPC mode of Greenfield Alignment to NHDL specifications with paved shoulder from Naku of design Km 0.00 To Nakula of design Km 9.130 of total design length 9.130 Km on road Chungthang-Lachen Monastery-Log Bridge-Muguthang-Naku Section (Nakula) (Part of NH-310AG) in the State of Sikkim under Project Swastik of BRO (Pkg-IX) (Job No 301/129) (Second Call)
Construction on EPC mode of Greenfield Alignment to NHDL specifications with paved shoulder from Naku of design Km 0.00 To Nakula of design Km 9.130 of total design length 9.130 Km on road Chungthang-Lachen Monastery-Log Bridge-Muguthang-Naku Section (Nakula) (Part of NH-310AG) in the State of Sikkim under Project Swastik of BRO (Pkg-IX) (Job No 301/129) (Second Call)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tenderdocument.pdf
Tender Documents • 7.41 MB
Tenderdocument_2.pdf
Tender Documents • 1.32 MB
Tenderdocument_3.pdf
Tender Documents • 3.78 MB
Tenderdocument_4.pdf
Tender Documents • 1.91 MB
Tenderdocument_5.pdf
Tender Documents • 3.20 MB
BOQ.xls
BOQ • 0.34 MB
Tenderdocument_6.pdf
Tender Documents • 4.64 MB
Tenderdocument_7.pdf
Tender Documents • 35.03 MB
Download all tender documents and submit your bid