Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance D 36 SECTOR 6 NOIDA GAUTAM BUDDHA NAGAR UTTAR PRADESH 201301 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | Admitted-Finance |
| 3 | Rejected-Technical A 21 BEHIND LIONS CLUB SCHOOL III PHASE THIRU VI KA INDUSTRIAL ESTATE GUINDY CHENNAI 600 032 | CHENNAI | TAMIL NADU | 600001 | Rejected-Technical Techno commercially rejected |
Tender Value
Refer Docs
EMD Value
₹7,000
Closing Date
18 Apr 2022, 2:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GM(PJ-Contracts)
PLHO NOIDA
EIA and RA study of for laying of POL pipelines in common corridor for setting up grass root terminal at Vallur Chennai
2022_PLHO_149757_1
PLCC/EIA and RA Vallur/MON/22033
Limited
Other Services
Works
485 days
Tamil nadu
As per tender terms and condition
6 documents required · 6 mandatory
₹7,000
Yes
2 May 2022
8 Apr 2022
19 Apr 2022
8 Apr 2022
18 Apr 2022
13 Apr 2022
120 days
Amount
EIA RA study Tamil Nadu Stations
Carrying out Environment Impact Assessment (EIA) & Risk Analysis (RA) study to assess probable impact on environment/risk due to the project & suggest required mitigation measures, If any, for obtaining the required clearances from State Pollution Control Board/ MoEF&CC, GoI for the project of "laying of POL Pipelines in Common Corridor for setting up grass root terminal at Vallur (Chennai)" in adherence to the EIA Notification, 2006 & subsequent amendments (Draft EIA notification 2020) made by MoEF&CC, Govt. of India. Carrying out Environment Impact Assessment (EIA) study to establish present environmental parameters in & around the pipeline station facilities in 15 km radius and 1 km along pipeline route (500 meters on either side of the pipeline from centre-line) under the subject project of "laying of POL Pipelines in Common Corridor for setting up grass root terminal at Vallur (Chennai)". Identifying & evaluating potential environmental impacts that are consequent to the project facilities, carrying out consequence analysis of release of hydro-carbon to water-bodies etc. and recommend necessary mitigation measures, prepare EIA report covering all the relevant data on air, water, noise, land-use, temperature, available facilities, surrounding industries, place of historical importance, marine life, flora & fauna, water bodies, coastal areas, occupation, health, etc. of neighboring people etc. in accordance with the regulations of the concerned State PCB's, Notification of MoEF&CC, GoI as mentioned above and prepare an Environment Management Plan(EMP). Identification of Eco-sensitive area falling under the project, if any, shall also be included under this study. Carrying out Risk Analysis (RA) study for the proposed facilities envisaged under the project of "laying of POL Pipelines in Common Corridor for setting up grass root terminal at Vallur (Chennai)" taking into account the proposed facilities and existing facilities in its surroundings, study done should identify the potential hazards, assess the impact of all probable accidental hazards and mitigation measures to reduce hazards of all the facilities, prepare RA report with mitigation measures & Disaster Management Plan(DMP). Risk analysis study shall comprise of, but not limited to: -Identification of risks by HAZOP/FETI approaches -Hazard analysis/damage model studies for the facilities, radiation effects etc. -Maximum Credible Accident Analysis bringing out type of fire hazards from the facilities, past accident analysis, risk factors, societal risk, Domino effects etc. -Observation of risk assessment study / recommendations. -Preparation & submission of ON-SITE EMERGENCY PLAN / DISASTER MANAGEMENT PLAN (DMP) for the subject pipeline, based on Risk Analysis and assessment.
Eco Chem Sales and Service
Eco Chem Sales and Service
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .