Loading…
Loading…
Tender Value
₹6.6 L
EMD Value
₹7,000
Closing Date
8 Apr 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer, Ahmedabad Irrigation Division, Ahmedabad
Jungle clearance and clearing silt of the Iyava Drain under Sanand Irrigation Sub Division, Sanand.
289786
24 of 2025-26
Open
Miscellaneous Works
Ahmedabad
8 documents required · 6 mandatory · 2 optional
₹900
Yes
Executive Engineer, Ahmedabad Irrigation Division, Ahmedabad
₹7,000
Yes
25 Mar 2026
25 Mar 2026
25 Mar 2026
8 Apr 2026
25 Mar 2026
BILL OF QUANTITY
Name of work:- Jungle clearance and clearing silt of the Iyava Drain under Sanand Irrigation Sub Division, Sanand
Qty. Item No. Description of Item Unit Rate in Rs. Amount in Rs.
Jungle clearance of specified category and bushes for canal/dam work as directed
with depositing the materials etc. complete (Excluding tree of grith above 0.5 Mt)
0.348 a) Light Dense ha 12553.00
0.348 b) Medium Dense ha 21487.00
1.624 c) Heavy Dense ha 30543.00
Clearing silt from drain bed by digging the same to the required bed level and
gradient including depositing the excavated earth regularly in spoil bank for
4110.75 2 utilising the same for preparing the banks after breacking clods as and where Cmt 146.00
directed for lead up to 50 Mt. & all lifts
FOR MAIN, LATERAL AND SUB-LATERAL DRAINS (By Machinary)
In words Six Lakh Sixty One Thousands Six hundred Seventeen Rupees and Twenty Five paisa Only
I/We am/are willing to carry out the work at…… % above/below percent(Should be written in figures and words) of the estimated rate mentioned above.
Amount of my /our tender works out as under.
Estimated amount put to Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
1 The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for which no
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017 Cement
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD Book Iyava.pdf
BOQ Iyava.pdf
Tender notice 24 of 2025-26 - for CD and publication.pdf
Download all tender documents and submit your bid