| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹83.3 LAccepted-Finance 2ND FLOOR MAA SHARDA NAGAR KABID KHEDI INDORE M P 452001 | INDORE | MADHYA PRADESH | 452001 | ₹83.3 L | L1 | Accepted-Finance Quoted rate is lower. (Cluster-2 only) (Cluster-1 and 3 will be retendered being single responsive bidder) |
| 2 | L2₹1.0 CrRejected-Finance | ₹1.0 Cr | L2 | Rejected-Finance Quoted rate is higher. (Cluster-2 only) (Cluster-1 and 3 will be retendered being single responsive bidder) |
| 3 | Rejected-Technical | - | - | Rejected-Technical Non-Responsive |
| 4 | Rejected-Technical | - | - | Rejected-Technical Non-Responsive |
| 5 | Rejected-Technical | - | - | Rejected-Technical Non-Responsive |
| Sl No | Description | Qty | Unit | S KUMAR CREATION PRIVATE LIMITED L1 | UNITED TELECOM L2 |
|---|---|---|---|---|---|
| 1.00Excavation of trenches | |||||
| 1.10 | Excavation of trenches in Normal/Soft Soil to a standard depth of 1.65m as specified in laying practices of OF cable, and backfilling the excavated trenches after laying the PLB pipe with or without protection | 10,040 | Per meter | 123.12 ₹12.4 L | 225 ₹22.6 L |
| 1.11 | Excavation of trenches in Normal/Soft/Rocky area to a standard depth of 90 Cm as specified in laying practices of OF Cable and backfilling the excavated trenches after aying the PLB for Nalikhal-Yamkeshwar | 5,000 | Per meter | 217.24 ₹10.9 L | 350 ₹17.5 L |
| 1.20 | Excavation of trenches in Rocky Soil to a standard depth of 1.65m as specified in laying practices of OF cable, and backfilling the excavated trenches after laying the PLB pipe with or without protection | 150 | Per meter | 333.91 ₹50,086.50 | 500 ₹75,000 |
| 1.21 | Excavation of trenches in Soft Rocky Soil to a standard depth of 1.65m as specified in laying practices of OF cable, and backfilling the excavated trenches after laying the PLB pipe with or without protection for Kaladhungi-Bazpur (Nayagaon-Barhaini) | 2,844 | Per meter | 173.83 ₹4.9 L | 280 ₹8.0 L |
| 1.40 | Excavation of trenches in Soft/Hard Rocky Soil to a standard depth of 1.20 m as specified in laying practices of OF cable, and backfilling the excavated trenches after laying the PLB pipe with or without protection for Kaladhungi-Bazpur (Nayagaon-Kaladhungi) | 890 | Per meter | 222.7 ₹2.0 L | 380 ₹3.4 L |
| 1.60 | Horizontal Directional Drilling for laying of U/G PLB/ HDPE pipes to a standard depth of 1.65m as specified in laying practices of OF Cable, by HDD method | 16,550 | Per meter | 177.3 ₹29.3 L | 280 ₹46.3 L |
| 2.00LAYING OF PLB Upto 50mm DIAMETER AND JOINTING WITH COUPLER(Material to be supplied by BSNL) | |||||
| 2.10 | 1st Pipe | 18,984 | Per meter | 12.8 ₹2.4 L | 18 ₹3.4 L |
| 3.00OFC PULLING (OF Cable & Accessories to be supplied by BSNL) - Pulling of O.F Cabl , and allied works (VIZ. Replacing couplers and Bank filling in case of Manholes Sealing of PLB ends, refilling sand ,Refixing RCC cover and backfilling in case of joint chamber / Manhole). No. charges to be paid for opening of Manholes/Joint chamber. | |||||
Tender Value
₹2.5 Cr
EMD Value
₹5.0 L
Closing Date
11 Sept 2025, 2:00 pmClosed
AGM MM
In the chamber of AGM (MM) O/o CGMT Uttarakhand Dehradun
Tender for underground OFC Rehabilitation work Partial and Complete in Uttarakhand Circle.
2025_BSNL_245672_1
Tender for underground OFC Rehabilitation work Partial and Complete in Uttarakhand Circle.
Open Tender
OFC Laying Works
365 days
Uttarakhand
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,950
Yes
AO (Cash) O/o CGMT Uttarakhand BSNL
₹5.0 L
Yes
Dehradun
6 Jan 2026
21 Aug 2025
12 Sept 2025
21 Aug 2025
11 Sept 2025
21 Aug 2025
21 Aug 2025 - 28 Aug 2025
26 Aug 2025
Amount
Excavation of trenches
Excavation of trenches in Normal/Soft Soil to a standard depth of 1.65m as specified in laying practices of OF cable, and backfilling the excavated trenches after laying the PLB pipe with or without protection
Excavation of trenches in Normal/Soft/Rocky area to a standard depth of 90 Cm as specified in laying practices of OF Cable and backfilling the excavated trenches after aying the PLB for Nalikhal-Yamkeshwar
Excavation of trenches in Rocky Soil to a standard depth of 1.65m as specified in laying practices of OF cable, and backfilling the excavated trenches after laying the PLB pipe with or without protection
Excavation of trenches in Soft Rocky Soil to a standard depth of 1.65m as specified in laying practices of OF cable, and backfilling the excavated trenches after laying the PLB pipe with or without protection for Kaladhungi-Bazpur (Nayagaon-Barhaini)
Excavation of trenches in Soft/Hard Rocky Soil to a standard depth of 1.20 m as specified in laying practices of OF cable, and backfilling the excavated trenches after laying the PLB pipe with or without protection for Kaladhungi-Bazpur (Nayagaon-Kaladhungi)
Horizontal Directional Drilling for laying of U/G PLB/ HDPE pipes to a standard depth of 1.65m as specified in laying practices of OF Cable, by HDD method
LAYING OF PLB Upto 50mm DIAMETER AND JOINTING WITH COUPLER(Material to be supplied by BSNL)
1st Pipe
OFC PULLING (OF Cable & Accessories to be supplied by BSNL) - Pulling of O.F Cabl , and allied works (VIZ. Replacing couplers and Bank filling in case of Manholes Sealing of PLB ends, refilling sand ,Refixing RCC cover and backfilling in case of joint chamber / Manhole). No. charges to be paid for opening of Manholes/Joint chamber.
Up to 96F
OFC BLOWING (OF Cable & Accessories to be supplied by BSNL) - Blowing of OF Cable, and allied works (viz. Replacing couplers and Back filling in case of Manholes, Sealing of PLB ends, refilling sand,Refixing RCC cover and backfilling in case of joint chamber/ Manhole.) No charges to be paid for opening of Manholes/Joint Chambers.
Up to 48F
DWC PIPE LAYING (DWCPipe to be supplied by BSNL)
DWC Pipe (Up to 100mm O.D), fixing,Handling & laying in trenches.
DWC/GI pipe lying & fixing with GI clamps (on bridge & culvert or external walls of building) as per specifications along with supply of GI clamps (4 mm thickness, 25 mm width) and all installation materials. Clamps spacing should be approx 1 m to take care of load
6. Boring & CC WORKS
Boring /Cutting (Morrum/Pucca Road) Black Top or Concrete Road (Depth 1.65m) at Road Crossing and any other unavoidable hindrance.
Providing CC protection (20x20 Cm) in the ratio of 1:2:4 for casing PLB Pipe /GI Pipe/DWC Pipe in Roads,Bridges, Crossings and Culverts and for low depth protection , or on wheel guard of bridge as specified in the construction practices of OF cable construction ,including materials.
JOINTING CHAMBER
Supply and fixing of pre-cast RCC joint chamber with size 1.2 M inner dia x0.3 M depth and ring thickness of 40mm made of standard 1:2:4 concrete mix. It should have split RCC cover (with two halves) of thickness 40mm made of cement concrete mix of 1:2:4. Base should be circular RCC plate 40mm thick made of cement concrete mix of 1:2:4, scope includes required excavation, backfilling with clean sand and all above operations including supply of materials. Details as per specification.
ROUTE /JOINT INDICATOR
Supplying, fixing nad concreting of routes/joint indicator, painting and sign writing of route /joint indicator as per the specification.
CABLE SPLICING WORKS - Splicing of all the fibers of OF cable laid at every joint within specified splicing loss range (<=0.02dB) and making termination at the ends. All materials and labours except Joint Closer to be supplied by Bidder /Vendor)
For 12 Fiber
For 24 Fibers – in Route
Documentation of Route Index Diagram in soft and hard copies (Three sets of each)
Documentation of Route Index Diagram in soft and Hard copies (Three sets of each)
Description of Work / Item(s)
Amount
Excavation of trenches
Excavation of trenches in Normal/Soft Soil to a standard depth of 1.65m as specified in laying practices of OF cable, and backfilling the excavated trenches after laying the PLB pipe with or without protection
Excavation of trenches in Soft Rocky Soil to a standard depth of 1.65m as specified in laying practices of OF cable, and backfilling the excavated trenches after laying the PLB pipe with or without protection
Horizontal Directional Drilling for laying of U/G PLB/ HDPE pipes to a standard depth of 1.65m as specified in laying practices of OF Cable, by HDD method
LAYING OF PLB Upto 50mm DIAMETER AND JOINTING WITH COUPLER(Material to be supplied by BSNL)
1st Pipe
OFC PULLING (OF Cable & Accessories to be supplied by BSNL) - Pulling of O.F Cabl , and allied works (VIZ. Replacing couplers and Bank filling in case of Manholes Sealing of PLB ends, refilling sand ,Refixing RCC cover and backfilling in case of joint chamber / Manhole). No. charges to be paid for opening of Manholes/Joint chamber.
Up to 48F
OFC BLOWING (OF Cable & Accessories to be supplied by BSNL) - Blowing of OF Cable, and allied works (viz. Replacing couplers and Back filling in case of Manholes, Sealing of PLB ends, refilling sand,Refixing RCC cover and backfilling in case of joint chamber/ Manhole.) No charges to be paid for opening of Manholes/Joint Chambers.
DWC PIPE LAYING (DWCPipe to be supplied by BSNL)
6. Boring & CC WORKS
Providing CC protection (20x20 Cm) in the ratio of 1:2:4 for casing PLB Pipe /GI Pipe/DWC Pipe in Roads,Bridges, Crossings and Culverts and for low depth protection , or on wheel guard of bridge as specified in the construction practices of OF cable construction ,including materials.
JOINTING CHAMBER
Supply and fixing of pre-cast RCC joint chamber with size 1.2 M inner dia x0.3 M depth and ring thickness of 40mm made of standard 1:2:4 concrete mix. It should have split RCC cover (with two halves) of thickness 40mm made of cement concrete mix of 1:2:4. Base should be circular RCC plate 40mm thick made of cement concrete mix of 1:2:4, scope includes required excavation, backfilling with clean sand and all above operations including supply of materials. Details as per specification.
ROUTE /JOINT INDICATOR
Supplying, fixing nad concreting of routes/joint indicator, painting and sign writing of route /joint indicator as per the specification.
CABLE SPLICING WORKS - Splicing of all the fibers of OF cable laid at every joint within specified splicing loss range (<=0.02dB) and making termination at the ends. All materials and labours except Joint Closer to be supplied by Bidder /Vendor)
For 24 Fibers – in Route
Documentation of Route Index Diagram in soft and hard copies (Three sets of each)
Documentation of Route Index Diagram in soft and Hard copies (Three sets of each)
Description of Work / Item(s)
Amount
Excavation of trenches
Excavation of trenches in Normal/Soft/Rocky area to a standard depth of 120 Cm as specified in laying practices of OF Cable and backfilling the excavated trenches after aying the PLB
Horizontal Directional Drilling for laying of U/G PLB/ HDPE pipes to a standard depth of 1.65m as specified in laying practices of OF Cable, by HDD method
LAYING OF PLB Upto 50mm DIAMETER AND JOINTING WITH COUPLER(Material to be supplied by BSNL)
1st Pipe
OFC PULLING (OF Cable & Accessories to be supplied by BSNL) - Pulling of O.F Cabl , and allied works (VIZ. Replacing couplers and Bank filling in case of Manholes Sealing of PLB ends, refilling sand ,Refixing RCC cover and backfilling in case of joint chamber / Manhole). No. charges to be paid for opening of Manholes/Joint chamber.
OFC BLOWING (OF Cable & Accessories to be supplied by BSNL) - Blowing of OF Cable, and allied works (viz. Replacing couplers and Back filling in case of Manholes, Sealing of PLB ends, refilling sand,Refixing RCC cover and backfilling in case of joint chamber/ Manhole.) No charges to be paid for opening of Manholes/Joint Chambers.
Up to 48F
DWC PIPE LAYING (DWCPipe to be supplied by BSNL)
DWC Pipe (Up to 100mm O.D), fixing,Handling & laying in trenches.
DWC/GI pipe lying & fixing with GI clamps (on bridge & culvert or external walls of building) as per specifications along with supply of GI clamps (4 mm thickness, 25 mm width) and all installation materials. Clamps spacing should be approx 1 m to take care of load
6. Boring & CC WORKS
Providing CC protection (20x20 Cm) in the ratio of 1:2:4 for casing PLB Pipe /GI Pipe/DWC Pipe in Roads,Bridges, Crossings and Culverts and for low depth protection , or on wheel guard of bridge as specified in the construction practices of OF cable construction ,including materials.
JOINTING CHAMBER
Supply and fixing of pre-cast RCC joint chamber with size 1.2 M inner dia x0.3 M depth and ring thickness of 40mm made of standard 1:2:4 concrete mix. It should have split RCC cover (with two halves) of thickness 40mm made of cement concrete mix of 1:2:4. Base should be circular RCC plate 40mm thick made of cement concrete mix of 1:2:4, scope includes required excavation, backfilling with clean sand and all above operations including supply of materials. Details as per specification.
ROUTE /JOINT INDICATOR
Supplying, fixing nad concreting of routes/joint indicator, painting and sign writing of route /joint indicator as per the specification.
CABLE SPLICING WORKS - Splicing of all the fibers of OF cable laid at every joint within specified splicing loss range (<=0.02dB) and making termination at the ends. All materials and labours except Joint Closer to be supplied by Bidder /Vendor)
For 24 Fibers – in Route
For 96 Fibers -in Route
Documentation of Route Index Diagram in soft and hard copies (Three sets of each)
Documentation of Route Index Diagram in soft and Hard copies (Three sets of each)
UNITED TELECOM (BID ID -896768)
UNITED TELECOM (BID ID -896768)
UNITED TELECOM (BID ID -896768)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid