| 1 | L1₹82.0 LAdmitted-Finance 79 MAHENDRA BANARJEE ROAD BEHALA KOLKATA 700060 | KOLKATA | WEST BENGAL | 700060 | ₹82.0 L | L1 | Admitted-Finance |
| 2 | L2₹82.1 L+₹10,924 (0.13%)Admitted-Finance 1080 JESSORE ROAD DUM DUM KOLKATA 700028 | KOLKATA | NORTH 24 PARGANAS | WEST BENGAL | 700028 | ₹82.1 L+₹10,924 (0.13%) | L2 | Admitted-Finance |
| 3 | L3₹94.5 L+₹12.5 L (15.2%)Admitted-Finance 131 JANGALPUR ROAD AIRPORT GATE NO 3 3 NO MOTILAL COLONY 24 PARGANAS N KOLKATA 700081 | KOLKATA | NORTH 24 PARGANAS | WEST BENGAL | 700081 | ₹94.5 L+₹12.5 L (15.2%) | L3 | Admitted-Finance |
| 4 | L4₹94.9 L+₹12.9 L (15.7%)Admitted-Finance 801 VENUS BENECIA PAKVAN DINING LANE OPP RAJPATH CLUB S G HIGHWAY BODAKDEV AHMEDABAD 380053 | AHMADABAD | GUJARAT | 380053 | ₹94.9 L+₹12.9 L (15.7%) | L4 | Admitted-Finance |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not meeting NIT criteria |
| Sl No | Description | Qty | Unit | ANIRBAN ENTERPRISE L2 | EASTERN POWER ENGINEERING L3 | MANNA ELECTRONICS AND ELECTRICAL WORKS L1 | ABHISHEK INTEGRATIONS LIMITED L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | SH-I : Round the clock Operation & Maintenance -
Round the clock Operation & Maintenance of available electrical equipments installed at Cargo substations and Admin power house including carrying out all the maintenance as per recommended maintenance schedule (Daily checking), attending all break down maintenance for all the electrical equipments installed at Substations as and when required basis or as directed by the EIC including providing 02 nos. mobile smart phone, SIM cards with yearly recharge for communication purpose. (mobile smart phone & SIM cards will be taken back by the agency after completion of work)
The total minimum manpower provision as follows: -
i) For General Shift Duty.
(a) Sr. Supervisor - 1 no.
(b)Highly skilled manpower - 1 no.
(c) Unskilled Manpower- 1 no.
ii) For Round the Clock Shift Duty.
(a) Skilled manpower (3 shift including reliever for two locations) - 7 nos.
(b) Unskilled manpower (3 shift including reliever for one location ) - 3.5 nos. | 24 | month | 3,15,000 ₹75,60,000 Lowest | 3,53,305 ₹84,79,320 | 3,18,624 ₹76,46,976 | 3,62,519 ₹87,00,456 |
| 2.00 | SH-II : Other Electrical Works -
Checking & maintenance of batteries & battery charger sets installed at Cargo Substation for HT switchgears i/c checking control wiring, tightening of all terminals after cleaning of terminals, providing petroleum jelly. Top up the batteries with distilled water etc. i/c. minors hardwares and spares complete as required.
a) First year | 12 | Job | 400 ₹4,800 | 100 ₹1,200 Lowest | 350 ₹4,200 | 150 ₹1,800 |
| 3.00 | Checking & maintenance of batteries & battery charger sets installed at Cargo Substation for HT switchgears i/c checking control wiring, tightening of all terminals after cleaning of terminals, providing petroleum jelly. Top up the batteries with distilled water etc. i/c. minors hardwares and spares complete as required.
a) Second year | 12 | Job | 400 ₹4,800 | 100 ₹1,200 Lowest | 350 ₹4,200 | 150 ₹1,800 |
| 4.00 | Filtration & dehydration of transformer oil to improve the breakdown voltage of oil
as per relevant IS standard by oil filtration machine, carrying out BDV test of oil i/c. transportation of filtration machine to site etc. as required.
a) First year | 7,000 | Ltr. | 5 ₹35,000 | 12 ₹84,000 | 4 ₹28,000 Lowest | 10 ₹70,000 |
| 5.00 | Filtration & dehydration of transformer oil to improve the breakdown voltage of oil as per relevant IS standard by oil filtration machine, carrying out BDV test of oil i/c. transportation of filtration machine to site etc. as required.
b) Second year | 7,000 | Ltr. | 5 ₹35,000 | 13 ₹91,000 | 4 ₹28,000 Lowest | 10 ₹70,000 |
| 6.00 | Maintenance of 1 no. APFC panel, 1 no. LT panels, 1 no. AMF panel (monthly minimum one time and as and when required) installed in cargo substation of the airport area for improvement of power factor i/c checking & tightening of the terminals, checking, control wirings if required replace the faulty portion of control wiring. Providing necessary cleaning materials, insulating tapes, minor hardwares, wires, thimble/lugs, ferrules etc., as required (capacitors and major components shall be supplied by the department).
a) First Year | 24 | Job | 400 ₹9,600 | 1,000 ₹24,000 | 350 ₹8,400 Lowest | 2,000 ₹48,000 |
| 7.00 | Maintenance of 1 no. APFC panel, 1 no. LT panels, 1 no. AMF panel (monthly minimum one time and as and when required) installed in cargo substation of the airport area for improvement of power factor i/c checking & tightening of the terminals, checking, control wirings if required replace the faulty portion of control wiring. Providing necessary cleaning materials, insulating tapes, minor hardwares, wires, thimble/lugs, ferrules etc., as required (capacitors and major components shall be supplied by the department).
b) Second Year | 24 | Job | 400 ₹9,600 | 1,000 ₹24,000 | 350 ₹8,400 Lowest | 2,000 ₹48,000 |
| 8.00 | Cleaning of luminaries, maintaining serviceability of emergency light in and around S/S building i/c upkeeping of Electrical sub-station by i/c cleaning, uprooting of bushes / jungles etc. within the periphery of sub-station, as and when required as directed by Engg. I/C.
a) First Year | 12 | Job | 400 ₹4,800 | 100 ₹1,200 | 200 ₹2,400 | 10 ₹120 Lowest |
| 9.00 | Cleaning of luminaries, maintaining serviceability of emergency light in and around S/S building i/c upkeeping of Electrical sub-station by i/c cleaning, uprooting of bushes / jungles etc. within the periphery of sub-station, as and when required as directed by Engg. I/C.
b) Second Year | 12 | Job | 400 ₹4,800 | 100 ₹1,200 | 200 ₹2,400 | 10 ₹120 Lowest |
| 10.00 | Supplying & topping up of transformer oil in the transformer by oil filtering machine including transportation and opening and closing nut / bolts / valves etc. as required.
a) First Year | 1,000 | Ltr. | 12 ₹12,000 Lowest | 180 ₹1,80,000 | 15 ₹15,000 | 150 ₹1,50,000 |
Tender Value
₹1.1 Cr
EMD Value
₹2.2 L
Closing Date
21 Nov 2023, 11:00 amClosed
D MONDAL SM EE
OPERATIONAL OFFICE BUILDING NSCBI AIRPORT AAI KOLKATA
Work Contract for Round the clock operation and preventive maintenance contract of Cargo Substation NSCBI Airport during 2023 25
2023_AAI_173150_1
AAC/EMD-VIII/OM/CARGO/2023-24
Open Tender
Electrical Works
Item Rate
730 days
NSCBI AIRPORT KOLKATA
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,180
Yes
₹2.2 L
Yes
7 Dec 2023
4 Nov 2023
22 Nov 2023
5 Nov 2023
21 Nov 2023
5 Nov 2023
5 Nov 2023 - 10 Nov 2023
Amount
SH-I : Round the clock Operation & Maintenance - Round the clock Operation & Maintenance of available electrical equipments installed at Cargo substations and Admin power house including carrying out all the maintenance as per recommended maintenance schedule (Daily checking), attending all break down maintenance for all the electrical equipments installed at Substations as and when required basis or as directed by the EIC including providing 02 nos. mobile smart phone, SIM cards with yearly recharge for communication purpose. (mobile smart phone & SIM cards will be taken back by the agency after completion of work) The total minimum manpower provision as follows: - i) For General Shift Duty. (a) Sr. Supervisor - 1 no. (b)Highly skilled manpower - 1 no. (c) Unskilled Manpower- 1 no. ii) For Round the Clock Shift Duty. (a) Skilled manpower (3 shift including reliever for two locations) - 7 nos. (b) Unskilled manpower (3 shift including reliever for one location ) - 3.5 nos.
SH-II : Other Electrical Works - Checking & maintenance of batteries & battery charger sets installed at Cargo Substation for HT switchgears i/c checking control wiring, tightening of all terminals after cleaning of terminals, providing petroleum jelly. Top up the batteries with distilled water etc. i/c. minors hardwares and spares complete as required. a) First year
Checking & maintenance of batteries & battery charger sets installed at Cargo Substation for HT switchgears i/c checking control wiring, tightening of all terminals after cleaning of terminals, providing petroleum jelly. Top up the batteries with distilled water etc. i/c. minors hardwares and spares complete as required. a) Second year
Filtration & dehydration of transformer oil to improve the breakdown voltage of oil as per relevant IS standard by oil filtration machine, carrying out BDV test of oil i/c. transportation of filtration machine to site etc. as required. a) First year
Filtration & dehydration of transformer oil to improve the breakdown voltage of oil as per relevant IS standard by oil filtration machine, carrying out BDV test of oil i/c. transportation of filtration machine to site etc. as required. b) Second year
Maintenance of 1 no. APFC panel, 1 no. LT panels, 1 no. AMF panel (monthly minimum one time and as and when required) installed in cargo substation of the airport area for improvement of power factor i/c checking & tightening of the terminals, checking, control wirings if required replace the faulty portion of control wiring. Providing necessary cleaning materials, insulating tapes, minor hardwares, wires, thimble/lugs, ferrules etc., as required (capacitors and major components shall be supplied by the department). a) First Year
Maintenance of 1 no. APFC panel, 1 no. LT panels, 1 no. AMF panel (monthly minimum one time and as and when required) installed in cargo substation of the airport area for improvement of power factor i/c checking & tightening of the terminals, checking, control wirings if required replace the faulty portion of control wiring. Providing necessary cleaning materials, insulating tapes, minor hardwares, wires, thimble/lugs, ferrules etc., as required (capacitors and major components shall be supplied by the department). b) Second Year
Cleaning of luminaries, maintaining serviceability of emergency light in and around S/S building i/c upkeeping of Electrical sub-station by i/c cleaning, uprooting of bushes / jungles etc. within the periphery of sub-station, as and when required as directed by Engg. I/C. a) First Year
Cleaning of luminaries, maintaining serviceability of emergency light in and around S/S building i/c upkeeping of Electrical sub-station by i/c cleaning, uprooting of bushes / jungles etc. within the periphery of sub-station, as and when required as directed by Engg. I/C. b) Second Year
Supplying & topping up of transformer oil in the transformer by oil filtering machine including transportation and opening and closing nut / bolts / valves etc. as required. a) First Year
Supplying & topping up of transformer oil in the transformer by oil filtering machine including transportation and opening and closing nut / bolts / valves etc. as required. b) Second Year
Checking earth pit i/c measuring the earth resistance bimonthly and repairing of earth pit wherever required by making necessary work, replacement of watering funnel, nut and bolts washers etc. and change broken cover by new cover i/c clearing, painting etc., as required. a) First Year
Checking earth pit i/c measuring the earth resistance bimonthly and repairing of earth pit wherever required by making necessary work, replacement of watering funnel, nut and bolts washers etc. and change broken cover by new cover i/c clearing, painting etc., as required. b) Second Year
Overhauling & servicing of arresting leakage of transformer HT and LT side, conservator tank, Bucholz relay, top cover, all radiators, Bushing changing etc. of transformers at Cargo Substation with dehydration / filtration transformer oil etc. i) Upto 500 KVA a) First Year
Overhauling & servicing of arresting leakage of transformer HT and LT side, conservator tank, Bucholz relay, top cover, all radiators, Bushing changing etc. of transformers at Cargo Substation with dehydration / filtration transformer oil etc. i) Upto 500 KVA b) Second Year
Overhauling & servicing of arresting leakage of transformer HT and LT side, conservator tank, Bucholz relay, top cover, all radiators, Bushing changing etc. of transformers at Cargo Substation with dehydration / filtration transformer oil etc. ii) Above 500 KVA and upto 2000 KVA Transformer) a) First Year
Overhauling & servicing of arresting leakage of transformer HT and LT side, conservator tank, Bucholz relay, top cover, all radiators, Bushing changing etc. of transformers at Cargo Substation with dehydration / filtration transformer oil etc. ii) Above 500 KVA and upto 2000 KVA Transformer) b) Second Year
SH: III - Maintenance of VCB / OCB & ACBs etc. Overhauling and servicing of existing LT ACB's of various makes up to 3200 Amp. Rating installed at Cargo Sub-stations at NSCBI Airport. a) First Year
Overhauling and servicing of existing LT ACB's of various makes up to 3200 Amp. Rating installed at Cargo Sub-stations at NSCBI Airport. b) Second Year
Overhauling and servicing of existing HT 6 KV / 11 KV OCB’s / VCB's of various makes i/c relay calibration installed at Cargo Sub-stations at NSCBI Airport. a) First year
Overhauling and servicing of existing HT 6 KV / 11 KV OCB’s / VCB's of various makes i/c relay calibration installed at Cargo Sub-stations at NSCBI Airport. b) Second year
Replacement of faulty WTI & OTI of the existing transformer located at Cargo Sub-stations, NSCBI Airport a) First Year
Replacement of faulty WTI & OTI of the existing transformer located at Cargo Sub-stations, NSCBI Airport b) Second Year
SITC of silica gel breather as per sample in the existing transformer located at Cargo Sub-station, NSCBI Airport. a) First Year
SITC of silica gel breather as per sample in the existing transformer located at Cargo Sub-station, NSCBI Airport. (b) Second Year
SH: IV - Painting etc. Painting the existing surface of cubicle panel with two coats of ISI marked synthetic enamel paint of approved colour including scrubbing, cleaning the surface etc. as required at Cargo Sub-station. a) First Year
Painting the existing surface of cubicle panel with two coats of ISI marked synthetic enamel paint of approved colour including scrubbing, cleaning the surface etc. as required at Cargo Sub-station. b) Second Year
Scrubbing, cleaning, the old paint from the existing surface of rolling shutters at cargo sub-stations and painting the same with two coats of ISI marked synthetic enamel paint of approved colour etc. as required. a) First Year
Scrubbing, cleaning, the old paint from the existing surface of rolling shutters at cargo sub-stations and painting the same with two coats of ISI marked synthetic enamel paint of approved colour etc. as required. b) Second Year
Scrubbing, cleaning the old paint from the existing surface of power transformer of following capacity located at cargo sub-stations and spray painting the same transformers with two coats of ISI marked synthetic enamel paint / aluminium paint or as per existing paint of approved colour etc. as required. i) Upto 500 KVA a) First Year
Scrubbing, cleaning the old paint from the existing surface of power transformer of following capacity located at cargo sub-stations and spray painting the same transformers with two coats of ISI marked synthetic enamel paint / aluminium paint or as per existing paint of approved colour etc. as required. i) Upto 500 KVA b) Second Year
Scrubbing, cleaning the old paint from the existing surface of power transformer of following capacity located at cargo sub-stations and spray painting the same transformers with two coats of ISI marked synthetic enamel paint / aluminium paint or as per existing paint of approved colour etc. as required. ii) Above 500 KVA and upto 2000 KVA Transformer. a) First Year
Scrubbing, cleaning the old paint from the existing surface of power transformer of following capacity located at cargo sub-stations and spray painting the same transformers with two coats of ISI marked synthetic enamel paint / aluminium paint or as per existing paint of approved colour etc. as required. ii) Above 500 KVA and upto 2000 KVA Transformer. b) Second Year
Lettering of maximum 2" size (Alpha / numerical) on the finished painted surface of feeder pillar / panel / earth pits with synthetic enamel paint of approved colour etc. as required. a) First Year
Lettering of maximum 2" size (Alpha / numerical) on the finished painted surface of feeder pillar / panel / earth pits with synthetic enamel paint of approved colour etc. as required. b) Second Year
Cleaning, rubbing the old paint from the existing surface of DG set installed at cargo sub-station and painting the same with heat proof spray painting with two coats of synthetic enamel paint of approved colour i/c lettering, numbering etc. as required. i) Upto 500 KVA DG sets a) First Year
Cleaning, rubbing the old paint from the existing surface of DG set installed at cargo sub-station and painting the same with heat proof spray painting with two coats of synthetic enamel paint of approved colour i/c lettering, numbering etc. as required. i) Upto 500 KVA DG sets b) Second Year
Cleaning the surface of chequered plates at cargo sub-stations and painting with two coats of synthetic enamel black paint etc. as required. a) First Year
Cleaning the surface of chequered plates at cargo sub-stations and painting with two coats of synthetic enamel black paint etc. as required. b) Second Year
Repairing of existing shutter at cargo sub-station of various sizes after removing the same from existing frame and frame work, shutter rail, shaft, side guides and arrangement for inside operation etc. including all servicing, greasing, oiling, requiring of locking arrangement complete fixing as per direction of Engineering-in-charge. a) First Year
Repairing of existing shutter at cargo sub-station of various sizes after removing the same from existing frame and frame work, shutter rail, shaft, side guides and arrangement for inside operation etc. including all servicing, greasing, oiling, requiring of locking arrangement complete fixing as per direction of Engineering-in-charge. b) Second Year
ANIRBAN ENTERPRISE
EASTERN POWER ENGINEERING
ABHISHEK INTEGRATIONS LIMITED
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
TENDERDOCUMENT.pdf
Tender Documents • 9.13 MB
BOQ_189756.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .