Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.1 LAccepted-AOC N A | FARIDABAD | HARYANA | 121004 | ₹6.1 L Quoted ₹6.8 L | L1 | Accepted-AOC Work awarded |
| 2 | L2₹6.9 L+₹7,000 (1.02%)Rejected-Finance N A | PALWAL | HARYANA | 121004 | ₹6.9 L+₹7,000 (1.02%) | L2 | Rejected-Finance L2 |
| 3 | L3₹7.0 L+₹14,000 (2.05%)Rejected-Finance HIMACHAL PRADESH HP | LAHUL AND SPITI | HIMACHAL PRADESH | 172111 | ₹7.0 L+₹14,000 (2.05%) | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical R O V P O DHALOH TEHSIL GHUMARWIN DISTT BILASPUR H P | BILASPUR | HIMACHAL PRADESH | 174001 | - | - | Rejected-Technical Not eligible as per NIT Conditions |
| 5 | Rejected-Technical HIMACHAL PRADESH HP | MANDI | HIMACHAL PRADESH | 175047 | - | - | Rejected-Technical Not eligible as per NIT Conditions |
| Sl No | Description | Qty | Unit | Nisha Kumari L2 | Sukh Dev L1 | MUKHTIAR SINGH PATIYAL L3 |
|---|---|---|---|---|---|---|
| 1.00 | Operation of pumping machinery and distribution system of water supply from different Sector storage tank, to different habitations being feeded from LWSS Kanfara whose line plan and technical data sheet is attached with, by the contractor through skilled / unskilled manpower i.e Pump Operator/Beldar/ Helper for running, maintenance and operation of pumping machinery and distribution system contigent to the work, watch and ward of all structures, machinery including rising main, operation of wheels from various tanks at different locations for distribution of water through the laid distribution network and maintaining all records regarding distribution of water to consumers at consumers ends as per the direction of the Engineer-in-charge. | 1 | Job | 6,90,000 ₹6,90,000 | 6,83,000 ₹6,83,000 Lowest | 6,97,000 ₹6,97,000 |
| 2.00 | Description of main components of the scheme is as under:-
1 No pump house with WTP and 1 No storage tank
Rising main: 1Booster stage 65mm dia 100 Rmt, 2nd Booster stage: 80mm dia 800 Rmt Pumping machinery 2nd Booster stage: 1x7 SHP. 1st stage-2x30-80 HP 15mm dia-9170 Rmt 20mm
Distribution system: 15mm 3000Rmt 25mm×3000Rmt 32mmdia-2500Rmt and 40mm dia-400 Rmt-18 07 Km
No of storage tanks: 3 Nos, 6 No habtiston, Total working hours. 25 through, 4 Nos perons
Indicators to be mentioned:
(i) Average per day Nos of complaints received though differnt mode such as CM Sanklap E-Samadhan, complaint register and toll free No.
(ii) Quantity of water lifted per day Pumping hours per day) and energy consumptoin per day Unit. | - | - | - | - | - |
Tender Value
₹6.9 L
EMD Value
₹13,800
Closing Date
31 Jul 2026, 3:00 pmClosed
EE JSV Division Jagatkhana
EE JSV Division Jagatkhana
(SH Deployment of manpower for operation of pumping machinery and distribution system of water supply from sector storage tank to different habitations for one year.
2026_HPIPH_139628_1
NIT 5267-5366 dt 21.07.2026
Open Tender
Repair and Maintenance Works
Item Rate
365 days
Swarghat
Please refer Tender documents.
3 documents required · 3 mandatory
₹350
Yes
₹13,800
Yes
8 Sept 2026
22 Jul 2026
31 Jul 2026
22 Jul 2026
31 Jul 2026
22 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Operation of pumping machinery and distribution system of water supply from different Sector storage tank, to different habitations being feeded from LWSS Kanfara whose line plan and technical data sheet is attached with, by the contractor through skilled / unskilled manpower i.e Pump Operator/Beldar/ Helper for running, maintenance and operation of pumping machinery and distribution system contigent to the work, watch and ward of all structures, machinery including rising main, operation of wheels from various tanks at different locations for distribution of water through the laid distribution network and maintaining all records regarding distribution of water to consumers at consumers ends as per the direction of the Engineer-in-charge. | 1 | Job | 100 | ₹100 |
| 2 | Description of main components of the scheme is as under:-
1 No pump house with WTP and 1 No storage tank
Rising main: 1Booster stage 65mm dia 100 Rmt, 2nd Booster stage: 80mm dia 800 Rmt Pumping machinery 2nd Booster stage: 1x7 SHP. 1st stage-2x30-80 HP 15mm dia-9170 Rmt 20mm
Distribution system: 15mm 3000Rmt 25mm×3000Rmt 32mmdia-2500Rmt and 40mm dia-400 Rmt-18 07 Km
No of storage tanks: 3 Nos, 6 No habtiston, Total working hours. 25 through, 4 Nos perons
Indicators to be mentioned:
(i) Average per day Nos of complaints received though differnt mode such as CM Sanklap E-Samadhan, complaint register and toll free No.
(ii) Quantity of water lifted per day Pumping hours per day) and energy consumptoin per day Unit. | - | - | 100 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
PWD6.pdf
Tender Documents • 0.68 MB
PWD8.pdf
Tender Documents • 1.42 MB
TC6.pdf
Additional Documents • 0.53 MB
BOQ_207008.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .