Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.0 LAccepted-AOC | ₹6.0 L | L1 | Accepted-AOC Low Bid |
| 2 | L2₹6.2 LRejected-AOC | ₹6.2 L | L2 | Rejected-AOC High Bid |
| 3 | L3₹6.2 LRejected-AOC | ₹6.2 L | L3 | Rejected-AOC High Bid |
| Sl No | Description | Qty | Unit | SAIFULLA KH L2 | MOHAMMED ASHIQU M L1 | SANEEJ L3 |
|---|---|---|---|---|---|---|
| 1.00Maintenance works to MP tiled roof | ||||||
| 1.00 | 15.31:Dismantling tiled roofing with battens, boarding etc. complete including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. | 330.38 | sqm | 199.44 ₹65,891.59 | 193.94 ₹64,074.48 | 199.44 ₹65,891.59 |
| 1.00 | 15.14.1:Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead:Of sectional area 40 square centimetres and above | 1.92 | cum | 4,232.4 ₹8,126.21 | 4,115.59 ₹7,901.93 | 4,232.4 ₹8,126.21 |
| 1.00 | OD203004/2025-2026:Providing & Re-fixing on roof pressed clay tile (Mangalore tile) of 20 mm nominal thickness and of approved size and as per approved pattern on steel frame work complete (steel frame work to be paid separately) | 330.38 | sqm | 195 ₹64,424.69 | 190.17 ₹62,828.94 | 195.57 ₹64,613 |
| 1.00 | 50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 2,053.38 | kg | 171.81 ₹3.5 L | 167.07 ₹3.4 L | 171.81 ₹3.5 L |
| 1.00 | 50.6.1.2:Solid block masonry using pre cast solid blocks (Factory made) of size 40x20x20cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level thickness 20cm and above in: CM 1:6 ( 1 cement: 6 coarse sand) etc complete. | 2.4 | cum | 6,906.51 ₹16,548 | 6,715.89 ₹16,091.27 | 6,906.51 ₹16,548 |
| 1.01 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 31.94 | sqm | 339.63 ₹10,849.14 | 330.26 ₹10,549.83 | 339.63 ₹10,849.14 |
| 1.01 | 13.46.1:Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) | 31.94 | sqm | 192.21 ₹6,139.96 | 186.91 ₹5,970.65 | 192.21 ₹6,139.96 |
Tender Value
₹5.2 L
EMD Value
₹13,124
Closing Date
4 Nov 2025, 12:00 pmClosed
Smitha Mol John
Office of the Assistant Engineer LID-EW Section, Chokkad Grama Panchayat
Annual Plan-CKD 362/25-26 Renovation works to Kallamoola LPS in ward 7 of Chokkad GP-CKD -General Civil Work
2025_LSGD_815782_5
AE/LSGD/CKD/E-TENDER-04/25-26
Open Tender
Civil Works - Buildings
150 days
Chokkad GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,160
Yes
₹13,124
Yes
16 Feb 2026
28 Oct 2025
5 Nov 2025
28 Oct 2025
4 Nov 2025
28 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.28 MB
Tendernotice_2.pdf
PDF • 0.25 MB
Tendernotice_3.pdf
PDF • 0.25 MB
prelim.pdf
Tender Documents • 0.26 MB
affi.pdf
Tender Documents • 0.24 MB
fot.pdf
Tender Documents • 0.25 MB
SBD.pdf
Tender Documents • 0.97 MB
BOQ_1365927.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid