Loading…
Loading…
Tender Value
₹9.8 L
EMD Value
₹19,640
Closing Date
11 Aug 2026, 2:00 pmClosed
Ex. Engineer R and B Division Shopian
Shopian
Construction of Pre-fab Hut with toilet at Shirmal Shopian
2026_PWDJK_318625_2
34/3740-50/RnB/SPN/e-tender of 30-07-2026
Open Tender
Civil Works
Percentage
30 days
Shopian
Please refer Tender documents.
5 documents required · 5 mandatory
₹600
bearing Account Number 0470010200000099
₹19,640
30 Jul 2026
30 Jul 2026
12 Aug 2026
31 Jul 2026
11 Aug 2026
31 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation all kinds of soil by mechinical means in trenches for foundations, etc. including dressing of sides and ramming of bottoms, all leads, lift including getting out excavated earth and disposal of surplus excavated earth as per the directions of Engineer In-Charge complete | 1 | Cum | 0.6 | ₹0.6 |
| 2 | Providing and laying stone soling duly hand packed in maintaning level and section including all carriages complete | - | Cum | 0.8 | - |
| 3 | Providing and laying in position cement concrete 1:4:8 (1 Cement:4 Corase sand: 8 grade stone aggregate 40 mm nominal size crushed including curing but excluding the cost of centring and shuttering. All work upto plinth level including all carriages complete | - | Cum | 0.2 | - |
| 4 | Providing and laying in position of reinforced cement concrete 1:1.5:3 (1 Cement, 1.5 Corase sand: 3 grade stone aggregate 20mm nominal size crushed including curing but excluding the cost of centering, shuttering, finishing and reinforcement all carriages involved complete | 1 | Cum | 0.4 | ₹0.4 |
| 5 | Providing and laying in position of reinforced cement concrete 1:2:4 (1 Cement:2 Corase sand: 4 grade stone aggregate 20 mm nominal size crushed including curing but excluding the cost of reinforcement, centring and shuttering. All work upto plinth level and above plinth upto required height including all carriages complete | - | Cum | 0.4 | - |
| 6 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete Thermo-Mechanically Treated bars of grade Fe 500D or more. Inculding all carriages complete | - | Kgs | 0.8 | - |
| 7 | Providing and laying in position cement concrete 1:2:4 (1 Cement:2 Corase sand: 4 grade stone aggregate 20 mm nominal size crushed including curing but excluding the cost of centring and shuttering. All work upto plinth level and above plinth upto required height including all carriages complete | - | Cum | 0.6 | - |
| 8 | Centering and shuttering including strutting, propping etc and removal of form work for foundation, footings etc | - | Sqm | 0.4 | - |
| 9 | Suppying and filling of Nallah Boulders as back filling including spreading, dressing, Ramming watering with all carriages complete | - | Cum | 0.6 | - |
| 10 | Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS:15622 of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1cement :4 coarse sand)
including grouting the joints with white cement and matching pigments etc. complete Size of tile 600x600 mm | 1 | Sqm | 0.6 | ₹0.6 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
BOQ_1051116.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .