Loading…
Loading…
Tender Value
₹1.1 Cr
EMD Value
₹1.1 L
Closing Date
26 Oct 2026, 5:00 pm
City Engineer, Vapi Municipal Corporation, Vapi
Construction of Strom Water Box Drain from Juna Nala to Nava Nala in Ward No. 9 at Vapi for Vapi Municipal Corporation.
353346
03/2026-27
Open
Civil Works - Roads
Works
Vapi
16 documents required · 14 mandatory · 2 optional
₹4,248
Municipal Corporation City of Vapi
₹1.1 L
7 Oct 2026
7 Oct 2026
7 Oct 2026
26 Oct 2026
7 Oct 2026
Name of Work : Construction of Strom Water Box Drain from Juna Nala to Nava Nala in Ward No. 9 at Vapi for Vapi Municipal
Memorandum showing Items of Woks to be carried out
Item Quantities Item of Works Tendered Rates. Unit Total Amount According
Item Quantities Item of Works Tendered Rates. Unit Total Amount According
No. Estimated But In Figures In Words to estimated Quantity.
1 may be2 More 3 4 5 6
1 1800.00 Excavation for foundation upto 1.5 m depth including sorting out and stacking ₹ 117.08 Rupees One Hundred CuM ₹
of useful materials and disposing off the excavated stuff upto all lead.(A) Loose Seventeen Paise Eight
or soft soil Only
2 600.00 Excavation for foundation for depth from 1.5 m to 3.0 m including sorting out and ₹ 287.48 Rupees Two Hundred CuM ₹
stacking of useful materials and disposing off the excavated stuff upto 50 Meter EightySeven Paise
lead. (D) Soft rock not requiring Blasting FourtyEight Only
3 120.00 Providing and laying cement concrete 1:3:6 (1-Cement : 3- coarse sand : 6- hand ₹ 3,005.76 Rupees Three Thousand CuM ₹
broken stone aggregates 40 mmnominal size) and curing complete excluding cost of Five Paise SeventySix
formwork in (A) Foundation and Plinth Only
4 1280.62 Filling available excavated earth (excluding rock) in trenches.plinth, sides of ₹ 130.39 Rupees One Hundred CuM ₹
foundations etc. in layers not exceeding 20 cm. in depth consolidating each Thirty Paise ThirtyNine
disposited layer by ramming and watering with all lead and lifts. Only
5 174.38 Providing and laying controlled cement concrete M.200 and curing complete ₹ 4,404.89 Rupees Four Thousand CuM ₹
including the cost of formwork and excluding the cost ofreinforcement for Four Hundred Four Paise
reinforced concrete work in (A) Foundations, footings, Base of columns and Mass EightyNine Only
6 418.50 Providing and laying controlled cement concrete M.200 and curing complete ₹ 7,340.54 Rupees Seven Thousand CuM ₹
including the cost of formwork and excluding the cost ofreinforcement for Three Hundred Fourty
reinforced concrete work in (B) Walls, from top of foundation level upto floor two Paise FiftyFour Only
7 174.38 Providing and laying controlled cement concrete M.200 and curing complete ₹ 8,178.45 Rupees Eight Thousand CuM ₹
including the cost of formwork and excluding the cost ofreinforcement for One Hundred
reinforced concrete work in (C) Slab, from top of foundation level upto floor two SeventyEight Paise
level FourtyFive Only
8 51441.20 Providing TMT Bar FE 500D reinforcement for R.C.C. work including bending, ₹ 76.21 Rupees SeventySix Paise Kg ₹
binding and placing in position complete upto floor two level TwentyOne Only
9 174.38 Construction of Granular Sub Base by Providing Coarse Graded Machine crushed ₹ 809.09 Rupees Eight Hundred CuM ₹
B.T. Material Satisfying MORTH Specification of Grading II ( B.T. Stone Agreegate Nine Paise Nine Only
53 mm to 2.36 mm Below - 20% ) Including spreading in unifrom layer with motor
grade on prepared surface, mixing by mix in place method with rotovator at OMC
an COmpacting with Vibratory Roller to Achieve the desired density etc. complete.
10 1162.50 Providing and Fixing Pre Cast Rubber Dye Interlcoking Concrete Blocks 80 mm Thick ₹ 785.76 Rupees Seven Hundred SqM ₹
with Grade M-400 Pneumatic Compressed By Mechanically pressed and as per EightyFive Paise
approved design including 75 mm sand layer for levelling and filling the joint with SeventySix Only
sand in proper line and level etc. complete.
11 20.00 Providing and supplying ISI Standard R.C.C. pipes(of Sulphate Resisting Cement) in ₹ 3,637.01 Rupees Three Thousand CuM ₹
standard lengths of following class and diameter suitable for either collar joints or Six Hundred ThirtySeven
rubber ring joints including all taxes, insurance, transportation,freight charges, Paise One Only
octroi, inspection charges, loading, unloading, conveyance to departmental stores,
stacking etc. (IS - 458/ 1989).complete. 110 x 63 mm 90 x 75 mm 90 x 63 mm.Note
: One collar should be supplied with each full length plain ended RCC pipe, cost
included in rates below. One rubber ring should be supplied with each full length
socketed pipe, cost included in rates below.
900mm Dia Class NP3 Test Pressure 0.7 Kg/sq.cm.
12 20.00 Lowering, laying and jointing R. C. C. pipes in C. M. 1:1 1/2 of following diameters ₹ 343.40 Rupees Three Hundred CuM ₹
in proper position, grade and alignment at all level as directed by Engineer-in- FourtyThree Paise
charge Fourty Only
including conveyance from stores to site of work, labour, giving hydraulic testing as
900mm Dia Class NP3 Test Pressure 0.7 Kg/sq.cm. ( @ 15% L.C. )
TOTAL Rs. (Round Off) ₹
Rupees One Crore Twelve Lakh ThirtyOne Thousand Nine Hundred Fourteen Only
I/ We am /are willing to carry out the work at ………….....………% above/below percent
above /below percent ( should be written in figures and words) of the estimated rates mentioned above.
Amount of tender works out as under.
*Estimate amount *Estimate amount
Put to tender Rs. Put to tender Rs. …
Deduct : % below / % Above Rs Add / Deduct :..: ……………..% above Rs………
Net. Total Rs………………..
In Words Rs. In Words………………………………………………
*( Please strike out whichever is not applicable)
Note-1:- All works shall be carried out as per Public Works Department, Hand Book & other specifications of Division or as directed.
Note-2:- All the columns in Schedule should be filled in digitally & the total of the entries in the last column should be struck by the contractor under his digitally
Note-3:- Rates quoted include clearance of the site (Prior commencement of work & at its close) in all respects & hold good for work under all conditions, site.
Note-4 The payment shall be made after availability fund. The contractor has no any claim in this regard.
Note-5 The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for which no extra payment shall be made.
Note-6 The labour cess will be deducted as per prevailing rules i.e.1% of the work done.
Note-7 GST and Income tax TDS will be deducted at a source while making payments of bills
Note-8 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt.G.R.:PRC-10/2017 Cement Consumption/16/ C Date : 11/05/2017 as stated in S.O.R.
therefore in R.C.C. items where there is a change as per actual mix design the cost of difference of cement consumption have been deducted from the rate of original item at the rate of input rate
mentioned in all the tender.
Note-9 The rates to be quoted by the contractor must be inclusive of all duties, taxes, and other levies Except GST payable by the contractor under the contract or for any other cause shall be
included in the rates, prices and total Bid Price submitted by the Bidder
Signature of Bidder. Vapi Municipal Corporation
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1.NIT.pdf
2.SBD.pdf
3.Annexue-1 BOQ.PDF
4.1 General Technical Specification.pdf
4.1 Specification-Road Works.pdf
5.GR_compressed.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .