| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.0 LAccepted-AOC | ₹30.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹31.1 L+₹1.1 L (3.63%)Rejected-AOC | ₹31.1 L+₹1.1 L (3.63%) | L2 | Rejected-AOC L2 |
| 3 | L3₹31.7 L+₹1.7 L (5.80%)Rejected-AOC | ₹31.7 L+₹1.7 L (5.80%) | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | SUNIL M L1 | MERP CONSTRUCTIONS PRIVATE LIMITED L2 | PK SULPHEEKER INFRASTRUCTURE LLP L3 |
|---|---|---|---|---|---|---|
| 1.00First Floor | ||||||
| 1.00 | OD105300/2024-2025:Labour | 5 | 1 nos | 1,114 ₹5,570 Lowest | 1,677 ₹8,385 | 1,711 ₹8,555 |
| 1.00 | OD105259/2024-2025:Providing and laying in position machine batched and machine mixed design mix M 30 grade cement concrete for reinforced cement concrete work , using cement content as per approved design mix , including pumping of concrete to site of laying but excluding the cost of centering , shuttering , finishing and reinforcement , including admixtures in recommended proportions as per IS:9103 to accelerate , retard setting concrete , improve work ability without impairing strength and durability as per direction of Engineer - in - charge . Note :- Cement content considered in this item is @ 340 kg/cum .All work above plinth level up to floor V level Excess or less cement used as per design mix is not payable / recoverable . | 47.72 | cum | 12,102 ₹5,77,531.64 | 10,965 ₹5,23,271.73 Lowest | 11,184 ₹5,33,722.85 |
| 1.00 | 5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more | 6,156.14 | kg | 104.5 ₹6,43,316.42 Lowest | 126.04 ₹7,75,919.63 | 129 ₹7,94,141.8 |
| 1.00 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 116.23 | sqm | 938 ₹1,09,019.99 | 931.23 ₹1,08,233.14 Lowest | 950 ₹1,10,414.7 |
| 1.00 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 113.18 | sqm | 709.4 ₹80,290.6 Lowest | 773.02 ₹87,491.18 | 788 ₹89,186.63 |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 174.51 | sqm | 894 ₹1,56,013.73 | 506.14 ₹88,327.5 Lowest | 516 ₹90,048.19 |
| 1.01 | 5.9.7:Centering and shuttering including strutting, etc. and removal of form for:Stairs, (excluding landings ) except spiral - staircases) | 20.19 | sqm | 767 ₹15,484.96 Lowest | 918.72 ₹18,548.04 | 937 ₹18,917.09 |
| 1.01 | 5.9.19:Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges | 33.44 | sqm | 950.4 ₹31,785.18 Lowest | 1,051.2 ₹35,156.33 | 1,072 ₹35,851.97 |
| 1.01 | 50.6.2.2:Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 46.66 | cum | 7,173.5 ₹3,34,701.16 Lowest | 9,790.09 ₹4,56,786.02 | 9,986 ₹4,65,926.79 |
Tender Value
₹32.2 L
EMD Value
₹50,000
Closing Date
26 May 2026, 3:00 pmClosed
Executive Engineer
Office of the Executive Engineer PWD Buildings Division Alappuzha
AC-ADS-Aroor LAC 2024-25- Govt. L P School Thaliyaparambu.-Construction of First Floor Building. -General Civil Work
2026_PWD_842671_3
PWD/BLDG/18745/2025-2026
Open Tender
Civil Works - Buildings
Item Rate
270 days
Cherthala
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,760
₹50,000
1 Aug 2026
19 May 2026
28 May 2026
19 May 2026
26 May 2026
19 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1First Floor | |||||
| 1.001 | OD105300/2024-2025:Labour | - | 1 nos | - | - |
| 1.002 | OD105259/2024-2025:Providing and laying in position machine batched and machine mixed design mix M 30 grade cement concrete for reinforced cement concrete work , using cement content as per approved design mix , including pumping of concrete to site of laying but excluding the cost of centering , shuttering , finishing and reinforcement , including admixtures in recommended proportions as per IS:9103 to accelerate , retard setting concrete , improve work ability without impairing strength and durability as per direction of Engineer - in - charge . Note :- Cement content considered in this item is @ 340 kg/cum .All work above plinth level up to floor V level Excess or less cement used as per design mix is not payable / recoverable . | - | cum | - | - |
| 1.003 | 5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more | 0.2 | kg | - | - |
| 1.004 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 0.4 | sqm | - | - |
| 1.005 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 0.4 | sqm | - | - |
| 1.006 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 0.8 | sqm | - | - |
| 1.007 | 5.9.7:Centering and shuttering including strutting, etc. and removal of form for:Stairs, (excluding landings ) except spiral - staircases) | - | sqm | - | - |
| 1.008 | 5.9.19:Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges | - | sqm | - | - |
| 1.009 | 50.6.2.2:Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete | - | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1439268.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.04 MB
viewnit.pdf
Tender Documents • 0.02 MB
viewsbd.pdf
Tender Documents • 2.48 MB
PRI.pdf
Other Document • 0.26 MB
epay1.pdf
Other Document • 0.06 MB
affi.pdf
Other Document • 0.02 MB
bis.pdf
Additional Documents • 0.56 MB
BOQ_1439268.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .