Superintending Engineer (CG), GIDC, Bharuch.
Construction of remaining Rigid Pavement road in Savli GIDC Industrial Estate.
291666
E-Tender Notice No. 10 of 2025-26 Sr. No. 02
Open
Civil Works - Roads
Works
Vadodara
2 documents required · 2 mandatory
₹7,080
Executive Engineer, GIDC, Baroda
₹4.5 L
30 Mar 2026
30 Mar 2026
30 Mar 2026
15 Apr 2026
30 Mar 2026
It. No. Description Qty Unit Rate Amount in Rs
1 Clearing and grubbing road land including 0.47 Hect. 28455.09
uprooting rank vegetation grass bushes, shrubs,
sapling and trees girth up to 300 mm removal of
stumps of trees cut earlier and disposal of
unserviceable materials (C) By mechanical means
in area of light jungle
2 Cold milling of existing bituminous layers in depth 11370.00 Sq. Mt. 118.46
of 100 to 150 mm as available bituminous crust,
excavated material hauling and stock piling the
material upto 5 km form the site
3 Box cutting the road surface to proper slope and 1750.00 Cum. 106.81
camber for making a base for road work including
removing the excavated stuff and depositing on
the road side slope as directed upto 50Mt.lead.
4 Earthwork for embankment including breaking 600.00 Cum. 173.67
clods, dressing with all lead and lift and including
watering rolling and consolidation of subgrade in
layers at O.M.C. to required dry density including
filling the depression which occur during the
process using power roller 8T to 10T.(E) From
Borrow area within 3.0KM. lead
5 Providing & laying of compacted thickness as per 220.00 Cum. 1808.04
approved design Closed Graded Granular sub base
(GSB) in layers (each layer should be less than
200 mm)of graded granular material consisting of
black trap machine cut crushed stone aggregate as
per grading - V given in table 400-1 of the
specification MORT&H and compacted to the
required density with 8 - 10 tonne vibratory roller
with plain drum or heavy pneumatic tyred roller
of minimum 200 to 300 KN weight in all seasons
as per MORT&H , maintaining the required slope
& grade during the operation as approved by the
engineer in charge & watering to the proper
moisture content and sprinkled with the help of
truck mounted water tank fitted with suitable
arrangement. (fully saturated having CBR value
6 Providing, laying, spreading and compacting 5100.00 Cum. 2100.7
graded stone aggregate to wet mix macadam
specification including mix the materials with
water at OMC in mechanical mix plant carriage of
mixed materials by tipper to site laying in uniform
layers (Layer should not be more than
mm)with paver in sub base/base course on well
prepared surface and camber with Sensor paver
consolidation by vibratory road roller to achieve
the desired density by using machine crushed
chips as per required gradation mixing with
required optimum quantity of water including
material, labour, plant and machinery and
equipment etc. complete.
7 Construction of dry lean cement concrete Sub- 1220.00 Cum. 3123.93
base over a prepared sub-grade with coarse and
fine aggregate conforming to IS: 383, the size of
coarse aggregate not exceeding 25 mm, aggregate
cement ratio not to exceed 15:1, aggregate
gradation after bleding to be as per table 600-1,
cement content not be less than 220 kg/cum,
optimum moisture content to be determined
during trial length construction, concrete strength
not be less than 10Mpa at 7 days, mixed in a
batching plant transported to site, laid with a
paver with electronic sensor, compacting with 8-
10 tonnes vibratory roller, finishing and curing.
8 Construction of Un-reinforced, dowel jointed, 3650.00 Cum. 7757.81
plain cement concrete pavement (concrete Grade
M-40) Over a Prepared sub base with 53 grade
cement @ 444 kg per cum, corse and fine
aggregate conforming to IS 383, maximum size of
coarse aggregate not exceeding 25 mm, mixed in a
batching and mixing plant as per approved mix
design, trasported to site, laid with a fixed form or
slip form paver (as decided by EIC ), spread,
compacted and finished in a continuous operation
including cost of contraction, expansion,
construction and longitudinal joints, joint filler,
200 micron separstion membrane, sealent primer,
joint sealant, debonding strip, dowel bar, tie rods,
admixtures as approved, curing compound,
finishing to lines and grades as per drawing
9 Providing and laying of Hot applied Thermoplastic 420.00 Sq. Mt. 367.72
compound 2.5 mm thick including Reflectorising
Glass Beads @ 250 gms per sqm area, thickness of
2.5 mm is exclusive of surface applied glass beads
as per IRC : 35 & finished surface to be level,
uniform and free from streaks and holes. (As per
Government letter No.SOR 102003/94/S-1/
Dated.20-7-2004) of only 3M make.
10 Cat Eye / Road Stud/ RPM: Supplying of Molded 1220.00 Nos. 326.23
Twin Shanks Raised Pavement Markers made of
polycarbonate and ABS moulded body and
reflective panels with micro prismatic lens
capable of providing total internal reflection of the
light entering the lens face and shall support a
load of 13635 kgs. tested in accordance to ASTM D
4280 Type H and complying to Specifications of
Category A of MORTH Circular No
RW/NH/33023/10-97 DO III Dt 11.06. 1997. The
height, width and length shall not exceed 20 mm,
130 mm and 130 mm and with minimum
reflective area of 13 Sqcm on each side and the
slope to the base shall be 35 +/- 5 degree. The
strength of detachment of the integrated
cylindrical shanks, (of diameter not less than
+/-2 mm and height not less than 30+/-2 mm)
from the body is to be a minimum value of
Kgf. Fixing will be by drilling holes on the road for
the shanks to go inside, without nails and using
epoxy resin based adhesive as per manufacturers
recommendation and The color of the marker
should be as per the IRC 35-2015 and as directed
by Engineerin-charge.
I / We agree to carry out the work at ______________________ % above the
estimated tender rates ___________________________________________
should be written in figures and words.
I / We agree to carry out the work at ______________________ % below the
estimated tender rates ___________________________________________
should be written in figures and words.
ESTIMATED AMOUNT ESTIMATED AMOUNT
Put to tender Rs. 4,54,42,366.49 Put to tender Rs.
Rupees in words : ___________ Rupees in words : _____________
1. (*) Please strike out whichever is not applicable. All work shall be carried out as per the
specifications of the GIDC or as directed.
2. All the columns in Schedule should be filled in ink and the total entries in the last column
should be struck by the contractor under his signature.
3. Rate quoted included clearance of site (prior to commencement of work & at, its close) in
all respect & hold good for the work under all conditions, site moisture, weather etc.
4. I/We have read the tender/general specifications/ conditions and I/We agree to follow same
and binding to me/us.
(2) Kindly read the Online uploaded B1 Agreement – Schedule - C (Pg. no.48). Following
components wise details for Time Schedule of Completion.
(See clause No. 2)
Time Schedule, for completion of different designated parts of the work and rate of
liquidated damages to be paid by the Contractor, if he fails to complete the part of work
within stipulated time limit is as detailed below.
Time Schedule of Completion
Percentage liquidated
Percentage of time of the total time limit
of work damages
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Bank Guarantee.pdf
Volume - I (PQ).pdf
Volume - II (Technical Specification).pdf
Price bid.pdf
B1 Agreement - Part 1.pdf
B1 Agreement - Part 2.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .