Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LAccepted-AOC | ₹2.5 L | L1 | Accepted-AOC 1st lowest |
| 2 | Rejected-Technical NULL | - | - | Rejected-Technical Tender details are perfected |
| 3 | Rejected-Technical | - | - | Rejected-Technical Tender details are perfected |
| Sl No | Description | Qty | Unit | G S Infrastructure L2 | Babu Mathew T M L1 | VISANTH S L3 |
|---|---|---|---|---|---|---|
| 1.00Appendix A | ||||||
| 1.00 | 56.17.1:Providing access to the site,clearing site and making good to erecting and conducting soil testing transfers within the site and for any other temporary arrangements to be erected within the area in connection with conducting soil testing. | 300 | sqm | 1 ₹300 | 4 ₹1,200 | 27 ₹8,100 |
| 1.00 | 56.1.a:Mobilization including transportation of all necessary plant and equipment's and materials of boring, field testing and sampling and demobilization after completing the work - For machine boring | 1 | set | 40,000 ₹40,000 | 60,000 ₹60,000 | 35,000 ₹35,000 |
| 1.00 | 56.2.a:Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location - For machine boring. | 4 | Bore Holes | 4,500 ₹18,000 | 2,500 ₹10,000 | 4,000 ₹16,000 |
| 1.00 | 56.3.a.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil. | 40 | metre | 1,000 ₹40,000 | 250 ₹10,000 | 1,000 ₹40,000 |
| 1.00 | 56.3.b.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 20m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil. | 40 | metre | 125 ₹5,000 | 50 ₹2,000 | 1,000 ₹40,000 |
| 1.01 | 56.3.c.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 30m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil. | 20 | metre | 100 ₹2,000 | 50 ₹1,000 | 1,000 ₹20,000 |
| 1.01 | 56.5.a:Boring through all classes of rock excluding hard rocks having N value greater than 50 using tungsten carbide drilling bit - In land | 20 | metre | 50 ₹1,000 | 50 ₹1,000 | 2,200 ₹44,000 |
| 1.01 | 56.4:Boring through all type of hard rock or similar refusal strata of N value greater than 50 using diamond core drilling bit for in land under water and banks of river. | 12 | metre | 4,500 ₹54,000 | 2,500 ₹30,000 | 4,500 ₹54,000 |
| 1.01 | 56.6:Recovering undisturbed soil samples using thin tube sampler of 75mm.to 100mm length internal dia 500mm length conforming to relevant IS Code at any required depth including clearing the bore hole etc complete. | 20 | each | 58 ₹1,160 | 50 ₹1,000 | 480 ₹9,600 |
Tender Value
₹3.3 L
EMD Value
₹8,342
Closing Date
22 Oct 2025, 2:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer,PWD, Bridges sub division,Tvpm
Investigation Work
2025_PWD_808349_1
TENDER NO. 4 PWD/BR/TR/6861/2024_3_1_1/1
Open Tender
Civil Works - Bridges
90 days
Thiruvananthapuram
Please refer Tender documents.
9 documents required · 9 mandatory
₹740
Yes
₹8,342
Yes
7 Jan 2026
10 Oct 2025
24 Oct 2025
10 Oct 2025
22 Oct 2025
10 Oct 2025
Amount
Appendix A
56.17.1:Providing access to the site,clearing site and making good to erecting and conducting soil testing transfers within the site and for any other temporary arrangements to be erected within the area in connection with conducting soil testing.
56.1.a:Mobilization including transportation of all necessary plant and equipment's and materials of boring, field testing and sampling and demobilization after completing the work - For machine boring
56.2.a:Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location - For machine boring.
56.3.a.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
56.3.b.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 20m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
56.3.c.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 30m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
56.5.a:Boring through all classes of rock excluding hard rocks having N value greater than 50 using tungsten carbide drilling bit - In land
56.4:Boring through all type of hard rock or similar refusal strata of N value greater than 50 using diamond core drilling bit for in land under water and banks of river.
56.6:Recovering undisturbed soil samples using thin tube sampler of 75mm.to 100mm length internal dia 500mm length conforming to relevant IS Code at any required depth including clearing the bore hole etc complete.
56.7:Conducting standard penetration test in bore hole at any depth.
56.8:Recovering disturbed samples and preserving the same in air tight sample containers including waxing labelling packing storing including cost of containers as per IS Code.
56.11.a:Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate) - Machine boring for 5 bore holes.
56.12.b:Total station surveying and preparation of site plan - Plain built up area with hindrance to line of sight due to buildings/structures.
56.14.a:Cross sectional details - River.
56.15.a:Hydraulic Velocity Calculation - River.
56.16:Preparation of Detailed Project Report of the bridge works containing alignment plan, key plan, contour plan , index map, longitudinal and cross section of road and River/Thodu cross section of bridge hydraulic and velocity calculations including neat filing and supplying five set DPR etc. as per the directions of the departmental officers.
G S Infrastructure (BID ID -2397207)
VISANTH S (BID ID -2401593)
Bidder Name
Babu Mathew T M
G S Infrastructure
VISANTH S
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1347869.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.04 MB
Formoftender-compressed.pdf
Tender Documents • 0.15 MB
BOQ_1347869.xls
BOQ • 0.31 MB
PreliminaryAgreement.pdf
Tender Documents • 0.03 MB
Integrity1.pdf
Tender Documents • 0.05 MB
epayment-compressed.pdf
Tender Documents • 0.05 MB
AffidavitForm-compressed.pdf
Tender Documents • 0.02 MB
SBD.pdf
Tender Documents • 1.63 MB
Download all tender documents and submit your bid