Tender Value
Refer Docs
Closing Date
15 Jul 2025, 3:00 pmClosed
PR & CC
This Tender is for CIVIL, MECHANICAL AND ELECTRICAL WORKS FOR CONSTRUCTION OF NEW
2500021392-HD-09050
5100021392
Open Tender
Jalpaiguri, West Bengal
15 Jul 2025
24 Jun 2025
15 Jul 2025
15 Jul 2025
25 Jun 2025 - 4 Jul 2025
4 Jul 2025
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | SPLY AND LAY OF | SPLY AND LAY OF — SUPPLYING AND LAYING RCC OF VOLUMETRIC MIX 1:1 1/2:3 (1 CEMENT:1 1/2 SAND: 3 COARSE AGGREGATES)GRADE CONCRETE WITH 20 MM DOWNGRADED COARSE AGGREGATE FOR APRONS, PITS, DRAINS ETC IN SUB-STRUCTURE. INCLUDING SHUTTERING IF REQUIRED) IN FOUNDATION, SCREED, APRONS, PITS, DRAINS, STEPS, ETC. AT ALL LEVEL AS PER DRAWINGS, SPECIFICATIONS AND INSTRUCTION OF ENGINEER. CONCRETE CUBES TESTED ON 28 DAYS SHALL GIVE A RESULT MEETING M-20 REQUIREMENTS OF IS 456. | - | cubic meter |
| 2 | SURFACE DRESSING,SITE | SURFACE DRESSING,SITE — "SURFACE DRESSING OF THE GROUND INCLUDING REMOVING SMALL PLANTS, BUSHES ,VEGETATION (DIA LESS THAN 4"") AND MAKING SURFACE LEVELLED AND DISPOSAL OF RUBBISH OUTSIDE HPCL'S PREMISES TO AN UNOBJECTIONABLE PLACE, AS DIRECTED BY THE ENGINEER IN CHARGE." | - | square meter |
| 3 | EXCAVATION,F/FNDTN,GRND | EXCAVATION,F/FNDTN,GRND — "Excavation for foundation upto required depth below existing ground level up to 1.5m in any tyoe odf soil except hard rock. Rate to include dressing the sides and bottom, bailing out of water if encountered, shoring, strutting, backfilling after the construction of foundation, trenches/plinth beam etccompacting by the side of the foundation and disposal of surplus excavated earth within/outside HPCL's premises to an unobjectionable place, as directed by the Engineer in Charge including spreading, watering and compaction, complete. The measurement of the excavation would be based on actual depth of excavation with applicable rate for different depths. | - | cubic meter |
| 4 | EXCAVATION,F/FNDTN,GRND | EXCAVATION,F/FNDTN,GRND — "Excavation for foundation upto required depth below ground level in any type of soil except hard rock . Rate to include dressing the sides and bottom, bailing out of water if encountered, shoring, strutting, backfilling after the construction of foundation, foundation, trenches/plinth beam etc compacting by the side of the foundation and disposal of surplus excavated earth within/outside HPCL's premises to an unobjectionable place, as directed by the Engineer in Charge including spreading, watering and compaction, complete . The measurement of the excavation would be based on actual depth of excavation with applicable rate for different depths.EXCAVATION IN EARTH UPTO 3 M | - | cubic meter |
| 5 | EXCAVATION,F/FNDTN,BTWN | EXCAVATION,F/FNDTN,BTWN — "Excavation for foundation upto required depth below ground level in any type of soil except hard rock . Rate to include dressing the sides and bottom, bailing out of water if encountered, shoring, strutting, backfilling after the construction of foundation, compacting by the side of the foundation and disposal of surplus excavated earth within/outside HPCL's premises to an unobjectionable place, as directed by the Engineer in Charge including spreading, watering and compaction, complete . The measurement of the excavation would be based on actual depth of excavation with applicable rate for different depths. EXCAVATION IN EARTH BETWEEN 3 TO 4.5 | - | cubic meter |
| 6 | EXCAVATION,F/FNDTN,HR,GR | EXCAVATION,F/FNDTN,HR,GR — "EXCAVATION FOR FOUNDATION UPTO REQUIRED DEPTH BELOW EXISTING GROUND LEVEL UP TO 1.5 M. DEPTH IN CONCRETE ROAD BY CHISELLING / PNEUMATIC DRILLING . RATE TO INCLUDE DRESSING THE SIDES AND BOTTOM, BAILING OUT OF WATER IF ENCOUNTERED, SHORING, STRUTTING, BACKFILLING AFTER THE JOB TO RESTORE THE ORIGINAL STATE OF THE GROUND AND DISPOSAL OF SURPLUS EXCAVATED EARTH WITHIN/OUTSIDE HPCL'S PREMISES TO AN UNOBJECTIONABLE PLACE, AS DIRECTED BY THE ENGINEER IN CHARGE INCLUDING CURING, WATERING AND COMPACTION AND COMPLETE . THE MEASUREMENT OF THE EXCAVATION WOULD BE BASED ON ACTUAL DEPTH OF EXCAVATION. " | - | cubic meter |
| 7 | EXCAVATION,F/FNDTN,HR,GR | EXCAVATION,F/FNDTN,HR,GR — "EXCAVATION FOR FOUNDATION UPTO REQUIRED IN HARD ROCK AND EXCAVATION SHALL BE DONE BY CHISELLING / PNEUMATIC DRILLING OR BLASTING. RATE TO INCLUDE DRESSING THE SIDES AND BOTTOM, BAILING OUT OF WATER IF ENCOUNTERED, SHORING, STRUTTING, BACKFILLING AFTER THE CONSTRUCTION OF FOUNDATION, TRENCHES/PLINTH BEAM ETC COMPACTING BY THE SIDE OF THE FOUNDATION AND DISPOSAL OF SURPLUS EXCAVATED EARTH WITHIN/OUTSIDE HPCL'S PREMISES TO AN UNOBJECTIONABLE PLACE, AS DIRECTED BY THE ENGINEER IN CHARGE INCLUDING SPREADING, WATERING AND COMPACTION, COMPLETE . THE MEASUREMENT OF THE EXCAVATION WOULD BE BASED ON ACTUAL DEPTH OF EXCAVATION WITH APPLICABLE RATE FOR DIFFERENT DEPTHS. EXCAVATION IN HARD ROCK 1.5 MTS- 3.0 MTS" | - | cubic meter |
| 8 | EXCAVATION,F/FNDTN,HR,BT | EXCAVATION,F/FNDTN,HR,BT — "Excavation for foundation upto required in hard rock and excavation shall be done by chiselling / pneumatic drilling or Blasting. Rate to include dressing the sides and bottom, bailing out of water if encountered, shoring, strutting, backfilling after the construction of foundation, compacting by the side of the foundation and disposal of surplus excavated earth within/outside HPCL's premises to an unobjectionable place, as directed by the Engineer in Charge including spreading, watering and compaction, complete . The measurement of the excavation would be based on actual depth of excavation with applicable rate for different depths. EXCAVATION IN HARD ROCK BETWEEN 3 TO 4.5 | - | cubic meter |
| 9 | SUPPLY AND FILLING,WITH | SUPPLY AND FILLING,WITH — "Supply and filling with clean silver / river sand of approved quality in layers of 150 mm each including spreading, compacting by hand ramming and watering etc, all complete as per direction of Engg.-In-Charge. Measurement basis compacted thickness only. | - | cubic meter |
| 10 | SUPPLY&FILLING,CRSHD STN | SUPPLY&FILLING,CRSHD STN — "SUPPLY AND FILLING WITH CRUSH SAND AS PER IS 21116-1980-2 & IS 486:2000 & IS 383.1970 THE PARTICLE SHAPE IS SEMI ROUNDED OR CUBICAL & NOT FLAKEY OR ELONGATED. DUST PERCENTAGE IS STRICTLY CONTROLLED 10 - 15% WITH FINENESS MODULUS 2.6 TO 3. SUPPLY AND FILLING WITH STONE CRUSHED SAND OF APPROVED QUALITY IN LAYERS OF 150 MM EACH INCLUDING SPREADING, COMPACTING BY HAND RAMMING AND WATERING ETC, ALL COMPLETE AS PER DIRECTION OF ENGG.-IN-CHARGE. COMPACTED THICKNESS ONLY." | - | cubic meter |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
2500021392-HD-09050.pdf
TENDER_DOCUMENT • 49.78 MB
Download all tender documents and submit your bid