Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹3,000
Closing Date
29 Oct 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Additional City Engineer (Ele/Mech)
Supply, Installation, Testing and Commissioning of Heavy-Duty Equipment and Machineries at the New Municipal Workshop office of Surat Municipal Corporation.
356822
ACE/Workshop/11/2026-2027 Work No: 04
Open
Supply,erection and Commissioning
Works
Surat
3 documents required · 3 mandatory
₹708
Commissioner, Surat Municipal Corporation
₹3,000
19 Oct 2026
19 Oct 2026
19 Oct 2026
29 Oct 2026
19 Oct 2026
120 days
Name of Work: - Supply, Installation, Testing and Commissioning
of Heavy-Duty Equipment and Machineries at the New Municipal
Workshop office of Surat Municipal Corporation.
ACE/Workshop/11/2026-27 SITC_Equipments
SURAT MUNICIPAL CORPORATION
MUNICIPAL WORKSHOP
Important notes for on line tender submission: ............................................................................
Annexure-VII (Personnel Details of partnership Firm) ..............................................................
Annexure –IX (Technical service profile pertaining to contractor).............................................
ACE/Workshop/11/2026-27 SITC_Equipments
SURAT MUNICIPAL CORPORATION
MUNICIPAL WORKSHOP
Notice for Inviting Tender
Tender (Online) Invitation Notice: ACE/Workshop/11/2026-2027
The Tender for are invited online on https://smctender.nprocure.com as per following details and
Work. Name of Work 1. Estimated Amount (Rs.)
3. Tender Fee(Rs.)
4. Class of Contractor
01 Supply, Installation, Testing and 1. 3,00,000/-
Commissioning of Heavy-Duty Equipment and 2. 3,000/-
Machineries at the New Municipal Workshop 3. 708/-
Experienced Agency
office of Surat Municipal Corporation.
Schedule of Tendering:
Downloading of Tender document From 15/10/2026 to 29/10/2026 up to 17:00 Hour
On line submission (Last Date) Up to 29/10/2026 till 18:00 Hour.
Submission of Technical Bid, Tender From 30/10/2026 to 13/11/2026
fee, EMD, and other documents etc. in To, Chief Accountant, SMC Tapipura(Muglisara),,
hard copy. Surat by RPAD / Speed Post only.
Probable Opening of Tender – 29/10/2026 18.01 hrs. onwards
Pre Bid Email Query Up to 24/10/2026
Email ID:[email protected]
Bidders shall have to mention the name and address of Tenderer, tender notice number, name
of work and last date of submission on the main cover of hard copy submitted. Surat
Municipal Corporation shall not be responsible for any postal delay.
Bidders have to submit price bid in electronic format only on https://smctender.nprocure.com
website till the last date & time for submission.
Price bid in physical form shall not be accepted in any case.
The Surat Municipal Corporation (S.M.C) reserves the right to accept or reject any or all the
tender to be received without assigning any reasons thereof.
ACE/Workshop/11/2026-27 SITC_Equipments
Any clarifications or if training required for participating in online tender, they can visit the
https://smctender.nprocure.com which is a website of “(n) Code solutions- A division
Tender Notice Details are on website www.suratmunicipal.gov.in/tenders of Surat Municipal
Add. City Engineer
Surat Municipal Corporation
ACE/Workshop/11/2026-27 SITC_Equipments
SURAT MUNICIPAL CORPORATION
MUNICIPAL WORKSHOP
Important information of tender:
1. Tender Notice (On line) No. ACE/Workshop/11/2026-2027
3. Estimated Cost of tender Rs. 3,00,000/-
4. Name of work Supply, Installation, Testing and Commissioning
of Heavy-Duty Equipment and Machineries at
the New Municipal Workshop office of Surat
Municipal Corporation.
5. Tender documents fees per set Rs.708/-with GST
6. Tender documents fees per set is In the form of Cross Demand Draft / Pay order
payable of Nationalized Bank / Schedule bank (As per
bank list mentioned in Annexure-VIII of this
tender only) drawn in favor of the
“Commissioner, Surat Municipal Corporation”
payable at Surat.
Tender Fees and EMD in Hard The Chief Accountant, Accounts Department,
7. SURAT MUNICIPAL CORPORATION,
copy to be submitted to
Tapipura (Mugalisara), Surat.
8. By: Speed Post/Registered Post only
Tender Cover to be super scribed
9. Tender Notice No., Due Date, Name of Work,
with: Name of Tenderer with Address.
Tender guarantee [Earnest Money
Executive Engineer,
Municipal Workshop,
Surat Municipal Corporation.
Seal and Signature of Bidder
ACE/Workshop/11/2026-27 SITC_Equipments
SURAT MUNICIPAL CORPORATION
MUNICIPAL WORKSHOP
Important notes for on line tender submission:
PRICE BID shall be submitted in electronic format only.
Price bid in physical form shall not be accepted in any case. In case of submitting price bid
in physical condition or in case of providing any type of indication of quoted price, the
bidder shall get disqualified.
Soft copy of technical bid as per IT-05 and IT-06 shall also be submitted online only.
Submission of technical bid in hard copy shall lead the bidder to disqualification. However,
bidders should fill all required details mentioned in technical bid before submission.
Further, all other supportive and qualifying documents shall also be submitted online in soft
copies. Affidavits and Undertaking are required to be submitted in hard copy as well as
Only E.M.D., Tender fees, affidavit and Undertaking are required to be submitted in sealed
cover within the stipulated time limit. Indicate on the sealed envelope Tender Notice no.,
Name of the Work, Name of the Department, Name and Address of the tenderer and last
date of submission.
Primary assessment of the tenders shall be carried on the basis of the qualifying and other
supportive documents submitted by the bidder online.
Acceptance of the tender shall rest with the Competent Authority, who does not bind
himself to accept the lowest and reserves the right to reject any or all quotations / tenders,
and no reasons shall be given for acceptance or rejection thereof. The Tenderer, whose
tender is accepted, shall have to enter into regular Contract and abide by all the conditions
Surat Municipal Corporation shall not be responsible for any postal delay in submission of
hard copy of tender or slow working of the website for online submission. Hence, bidders
are advised to fill tender well in time.
Executive Engineer,
Municipal Workshop,
Surat Municipal Corporation.
Seal & Signature of the bidder
ACE/Workshop/11/2026-27 SITC_Equipments
1 Instructions to tenderers
1.1 (IT-01) General, geography, site visit etc
The Contract documents may be secured in accordance with the notice Inviting Tender for
the work called “Supply, Installation, Testing and Commissioning of Heavy-Duty
Equipment and Machineries at the New Municipal Workshop office of Surat Municipal
Corporation.". The work shall include various activities as depicted from the name and as
elaborated in the tender.
The site is located in Surat city, is very important commercial city of Gujarat State located
in south Gujarat region. The city is well connected to west of India by both Rail and Road.
The City locate on bank of river Tapti and enjoy moderate climate having minimum average
temperature as 25 °C and extreme ranging from 45 °C in summer and 10 °C in winter. The
actual average rainfall is approximately 80 cm distributing over three months from mid-
June to mid of September.
The intending tenderer shall be deemed to have visited site and familiarized themselves
thoroughly with the site conditions before submitting the tender. Non-familiarity with the
site conditions will not be considered a reason either for extra claims or for not carrying
out the work in strict conformity with the specifications terms & conditions.
For site visit, the intending tenderer may contact Executive Engineer (Workshop), Surat
Municipal Corporation
Municipal Workshop,
Surat Municipal Corporation,
Umarwada, Surat
The contractor shall have to obtain tokens for himself and obtain gate passes for removing
any of his materials outside the premises. The contractor’s people’s entry and exit will be
by main gate only.
Non availability of access roads or railway siding or permits for entry of vehicles and
equipment at any specific area shall in no case be the cause to condone any delay in the
execution of the works or be the cause for any claims or extra compensations.
The entire work covered by this document shall be part of the contract. Tenderers shall
quote for this accordingly.
ACE/Workshop11/2026-27 SITC_Equipments
INCLUSION OF WORK
Any item of the equipment(s) / machineries or materials not shown in the specifications,
drawings of as specified elsewhere, but is clearly essential to make the system operational,
shall be supplied and installed by the contractor as if it had been not shown or specified
Subject, to the above requirement, work that is not included in the Contract Documents
shall not be performed except when approved in writing by the Engineer-in-charge / S.M.C.
1.2 (IT-02) INVITATIONS TO TENDER:
The Surat Municipal Corporation herein after referred to as the Corporation has invited
tenders for the work mentioned in notice inviting the tender & Important Information of
Tender mentioned in the tender documents.
The tenders shall be opened ON LINE in the office of Surat Municipal Corporation, Surat.
The Corporation reserves the right to reject the lowest or any other or all tenders or part of
it which in the opinion of the Corporation does not appear to be in its best interest, and the
tenderer shall have no cause of action or claim against the corporation or its officers,
employees, successors or assignees for rejection of his tender.
1.3 (IT-03) PURCHASE OF TENDER DOCUMENTS:
Tender Documents can be downloaded from https://smctender.nprocure.com up to the
date & time mentioned in Important Information of Tender. Also, Tender documents fees
as mentioned in Important Information of Tender is to be submitted with tender towards
the cost of tender documents by pay order or by demand draft of any Nationalized bank in
favor of "Commissioner, Surat Municipal Corporation" payable at Surat and shall be
submitted along with EMD and other documents. The cost of the Tender Documents will
not be refunded in any circumstances. The Surat Municipal Corporation shall not be liable
for any postal delay in any case.
All intending tenderer's will have to purchase digital Key of N procure in order to
participate in the online bidding process.
1.4 (IT-04) LANGUAGE OF TENDER:
Tenders shall be submitted in English and all information in the tender shall also be in
English, Information in any other language shall be accompanies by its translation in
English. Failure to comply with this may make the tender liable to reject.
ACE/Workshop11/2026-27 SITC_Equipments
1.5 (IT-05) QUALIFICATIONS OF TENDERERS:
Documents mentioned below and as per IT-06 constitute qualification criteria of this work.
Soft (colored Scanned) copy of all original documents shall be submitted online.
In case, original document is not available, notarized copy shall be submitted. In such case,
notarized documents shall be clearly displaying stamp, number and name of the notary.
Submitted documents shall be valid and identical to the qualification criteria.
Please note that absence of following essential documents shall lead to the bidder to straight
disqualification. No relaxation shall be provided to the bidder on later stage.
If the tenderer is presently terminated or banned for any work by Surat Municipal
Corporation for any reason, then the Price Bid of such tenderer shall not be opened.
All Documents must be colored scanned to be seen as original. Scanning in black and White
or gray shall not be acceptable.
The applicant who is not capable of meeting the requirements listed below, shall not be
qualified for the work. Qualification shall be based on the Applicant satisfying all of the
following minimum criteria regarding their particular experience, financial position,
personnel and equipment capabilities and other relevant information as demonstrated by
the applicant’s responses in the statements. The qualifications, capacity and resources of
proposed subcontractors shall not be taken into account in determining the applicant’s
compliance with the qualifying criteria. Following documents constitute qualification
criteria of this work.
Mainly Tenderer shall fulfill following for pre-qualification,
Sr. Qualification Criteria
1. Turn over certificate
Average annual financial Turnover during last 3 years, ending 31st March of previous
financial year, should be at least 30% of the estimated cost put to the tender.
Turn Over shall be certified by Valid Chartered Accountant.
An attested copy of annual turnover for the last 3 years should be enclosed.
For a proprietorship firm, the Income Tax Return (ITR) of the proprietor also
considered as proof of turnover
2 Tenderer's category certificate & Work Completion Certificate
For Supplier/Experience Certificate: -
Experience of having “successfully completed/Work in progress” similar works during
last 7 years ending last day of month previous to the one in which applications are
invited” should meet either of the following criteria:
ACE/Workshop11/2026-27 SITC_Equipments
(1) Minimum One similar completed works, costing not less than the amount equal
(2) Minimum Two similar completed works, each costing not less than the amount
equal 50%of tender Cost i.e. (50% x 3,00,000/- =1,50,000/-)
(3) Minimum Three similar completed works, each costing not less than amount equal
“Similar Work” shall mean experience in the supply of any kind of goods, equipment,
machinery, materials or services, executed for any Government Department, Semi-
Government Organisation, Public Sector Undertaking (PSU), Municipal Corporation or
any other Government body."
1.Only details/documents submitted as Work completion certificate shall be taken into
consideration for qualification purpose
2. List of the works already completed in last 7 years in prescribed Performa as per
Annexure-I and attested copies of certificates from head of the office (Min.
Executive Engineer or Equivalent Post) concerned for completion of the works.
3. Declaration regarding the work on hand with the tenderer shall also be given in
prescribed Performa as per Annexure-II. Attested copies of work orders, if any shall
also be attached as supporting documents.
4. Bidder need to submit scan copy of the work completion certificate which include
minimum following details like name of contractor, name of work, date of
starting the work, date of completion of the work (as per contract agreement),
actual date of the completion of the work, amount of work done, satisfactory
work completion remarks and issuer details
5. In the case of an order from GeM (Government e Market), the GeM contract copy
with CRAC / a copy of the delivery challan will be considered as a work
completion certificate.
6. Work completion certificate shall have to be issued not below rank of Executive
Engineer or Equivalent Post
7. Experience of Joint Venture /Subcontractor / Back to Back work shall not be
considered for evaluation of tender.
ACE/Workshop11/2026-27 SITC_Equipments
8. In case of work in progress certificate, Work done amount till the date of issued
certificate shall be considered for the evaluation. Even in a case of work in progress,
experience certificate must contain minimum details as mentioned in Sr no.4
Please note that the final decision of accepting or not accepting this proof will be made
The contractor shall have a valid GST registration
Scan copy of the same need to be submitted.
5. Even though the bidder meets the above criteria, they are subject to be disqualified
(i) Made misleading or false presentations in the forms, statements and attachments
submitted in proof of the qualification requirements; and / or
(ii) During verification if it is found from client that of poor performance such as
abandoning the works, litigation history, or financial failure or abnormal delay in
(iii) Regarding Litigation in case where Bidder is involved in illegal practice like
any activities of corruption, coercive practice or debarred/blacklisted in last 07 years
by Any Govt / Organization in respect of performance of Bidder, it is to state that
SMC authority requires that bidders under this contract, observe the highest
standard of ethics during the procurement and execution of such contracts.
In pursuance of this, SMC authority....
(A) Will reject a proposal for award if it determines that the bidder has engaged in
any corrupt or fraudulent practices in competing for this contract or in past history
(B) Will reject a proposal if it found debarred/blacklisted by any State Govt. /Govt.
of India/ Semi Government/ PSU.
The bidder shall not be under any Insolvency Bankruptcy code (IBC) resolution
process at National Company Law Tribunal (NCLT) or undergone any Corporate
Debt Restructuring (CDR) mode in the past 07 years in India from the date of the
submission of the bid.
Please note that online submission of all above essential documents are mandatory, else bidder
shall be liable for rejection
To meet all financial criteria as indicated in the Notice Inviting Tender (NIT), the bidder may
consider the following enhancement factors for the cost of works executed and financial figures
to arrive at a common base for the value of the works completed in India.
i.e. *Financial Year 2025-2026 means 1 April 2025 to 31 March
ACE/Workshop11/2026-27 SITC_Equipments
Financial Year Multiplying factor
2026-2027 (Base year of inviting tender)
Bidder should indicate actual figures of costs and amount for the work executed in Annexure
– I without accounting for the above-mentioned factors.
1.6 (IT-06) TENDER DOCUMENTS:
Printed and online documents and set of drawings shall comprehensively be referred to as
Tender documents. The several sections forming the documents are the essential parts of
the contract and a requirement occurring in one shall be binding as though occurring in all.
They are to be taken as mutually explanatory and describe and provide for complete works.
NOTE: ALL Necessary Documents, Certificates etc. shall be scanned and uploaded. Technical
Bid and price Bid are not to be submitted in Physical Form. Please note that Non
submission of Technical Bid as well as price bid does not absolve the bidders from any
liability created from the bid condition and bidding process. Technical-Bid & Price bid
in Hard copy shall be submitted by Successful Bidders upon intimation from SMC.”
Please note that only following documents shall be submitted to Chief Accountant of
S.M.C. in hard copy.
Please note that only following documents shall be submitted to Chief Accountant
of S.M.C. in hard copy. And also need to upload the same in soft copy on-line on n-
Sr. Document Description
2. Earnest Money Deposit
3. Affidavit on 300 Rs. stamp paper ( Annexure -III)
4. UNDERTAKING (NOT APPLICABLE)
List of documents to be submitted along with above documents submitted on-line
only on n procure
ACE/Workshop11/2026-27 SITC_Equipments
(1) Scan copy of various annexure with supporting documents
Sr. Document Description
1 Annexure-I (Work Completion Details)
2 Annexure-II (Work on Hand Details)
3 Annexure-III (Affidavit)
4 Annexure-IV (Undertaking) Not Applicable
5 Annexure-V (EMD and Undertaking)
6 Annexure-VI (GST Clause)
7 Annexure-VII (Personnel Details from Firm)
8 Annexure-VIII (bank List)
9 Annexure-IX (Technical service profile pertaining to contractor)
10 Annexure-X (Offer Details)
11 Annexure-XI (Bidder's Certificate)
(2) Scan copy of the following document
Sr. Document Description
1 An attested copy of annual turnover for the last 3 years
3 Dealer / Distributor certificate (If applicable)
4 Work Experience Certificate
5 Scan copy of PAN
6 Scan copy of GST certificate
In case of Partnership firm / PVT LTD company / Public limited company etc , other
7 relevant applicable documents like partnership deed / MOM /AOA whichever is
applicable , scan copy of same need to submit
ACE/Workshop11/2026-27 SITC_Equipments
Scan copy of registration i.e. the Company / Office / Shop proof like Shop establishment
Certificate , Registration certificate or equivalent etc. need to submit
9 Scan copy of Addenda Corrigendum (If Any)
11 Scan copy of Letter of Authorization/ / tender signing authority letter etc.(If any , For
signing tender document )
Documents enlisted in IT-05 and IT-06 shall have to be submitted as instructed above
and accordingly evaluation shall be made considering these documents only
1.7 (IT-07) Examination by tenderer’s:
A. At his own expenses and prior to submitting his tender, each tenderer shall……
(a) Examine the contract Documents,
(b) Visit the site and determine local conditions which may affect the work
including the prevailing wages and other pertinent cost factors,
(c) Familiarize himself with all central, State and local laws, ordinance, rules,
(d) Correlate his observations, investigations, and determinations with the
requirements of the Tender Documents.
B. The tender quantity is approximate and may increase or decrease or deleted from
the scope of the tender. Any increase or decrease or deleted in quantity will not
entitle tenderer to claim any extra over the quoted rate.
C. Tender Documents be completed by legible ink, checked in a responsible manner,
signed, stamped and returned together with the Tender Security Bond by the
stipulated date, which shall form the Tender.
The Tenderer is required to complete the form of tender, including the Appendices
Thereto Tender Security Bond and the Tender summary duly signed and stamped.
All the pages in which entries are required to be made by the tenderer are contained in the
tender documents and the tenderer shall not take out or add to or amend the text of any of
the documents except in so far as may be necessary to comply with any addenda issued
pursuant to Clause IT-17 hereof.
1.8 (IT-08) EARNEST MONEY DEPOSIT:
A. Tender must be accompanied with Earnest Money as specified in memorandum in the
following manner.
ACE/Workshop11/2026-27 SITC_Equipments
100% of EMD amount shall be in the form of Cross Demand Draft / Pay order of
scheduled bank/Nationalized bank (As per bank list mentioned in Annexure-VIII
of this tender only)in favor of Commissioner, Surat Municipal Corporation payable
B. The Earnest Money Deposit will be refunded to the unsuccessful tenderers after the
award has been finalized.
C. The Earnest Money Deposit (Tender guarantee) will be forfeited in the event, the
successful tenderer fails to accept the contract and fails to submit the Performance
Guarantee Bond (Security Deposit) to the owner as stipulated in this tender documents
within fifteen days after receipt of notice of award of contract. In such case owner may
disqualify the tenderer from tendering for further works, under the jurisdiction of the
Corporation (SMC).
D. The Earnest Money Deposit (Tender guarantee) will be forfeited in the event of
submitting forged/tempered/fake documents.
E. The Earnest Money Deposit of the successful tender shall be returned after the
performance guarantee bond, as required, is furnished by the contractor.
F. No interest shall be paid by the owner on any tender guarantee.
G. “Demand Draft for EMD & Tender Fee shall be submitted in electronic format only
through online (By colored Scanning) while uploading the bid. This submission shall
mean that EMD & Tender Fee are received for purpose of opening the bid. Accordingly
offer of those shall be opened whose EMD & Tender Fee is received electronically.
However, for the purpose of realization of D.D. Bidder shall send the D.D. in original
through RPAD/Speed Post so as to reach to Accountant Department TAPI BHAVAN
(Main Office) within 7 Day from the last date of online submission of the bid or as per
date mentioned tender notice. Punitive action for not submitting D.D. in Original to
Account Department (Main Office) by bidder shall be initiated and action shall be taken
for abeyance of registration and cancellation of E-tendering code for as follows.
At first instance following amount is to be paid to SMC
Tender Amount Penalty Amount in Rs.
2 Above 1.00 Cr up to 10.00 Cr Rs. 20,000/-
3 Above 10.00 Cr up to 50.00 Cr Rs. 30,000/-
4 Above 50.00 Cr up to 100.00 Cr Rs. 70,000/-
ACE/Workshop11/2026-27 SITC_Equipments
If bidder fails to submit the said amount within 10 days for the First instance OR in
case of second instance of this similar of mistake i.e. non submission of Valid Original
Demand Draft (D.D.)/B.G. to the Accounts Department TAPI BHAVAN (Main Office)
within the specified time limit, punitive action of abeyance/cancellation of E-tendering
code for 6 months shall be taken.
Any documents in supporting of bid shall be in electronic format only through online
(By colored Scanning) &hard copy will not be accepted separately.”
1.9 (IT-09) INCOME TAX CLEARANCE CERTIFICATE:
In view of the latest circular of IT Department, IT clearance certificate is not required.
However, the contractor shall give Photo copy of the PAN card.
1.10 (IT-10) PREPARATIONS OF TENDER DOCUMENTS:
Tenderers are requested to note the following while preparing the Tender Documents:
A. Technical bid, EMD and Tender fees shall be submitted on the Tender Form bound
herein in English. All tender items and statements shall be properly filled in. Numbers
shall be stated both in words and in figures were so indicated, and signatures of all
persons signing shall be in longhand.
B. Technical Bid shall be accompanied by the prescribed tender security bond and other
required documents and drawings. All witnesses and sureties shall be persons of status
and probity and their full names, occupations and address shall be stated below their
signatures. All signatures in the Tender Documents shall be dated.
C. The outer envelope shall clearly indicate the reference of the bid. This is to ensure that
the bid is not inadvertently opened prior to the scheduled opening date
D. Price Bid shall be submitted online only.
1.11 (IT-11) Submission of tenderer document: -
Following condition shall supersede relevant condition mentioned elsewhere in the bidding
Technical bid and qualification documents mentioned in the tender and price bid are not to
be submitted in physical form. Please note that Non – Submission of Hard Copies of
technical Bid as well as price Bid does not absolve the bidders from any liability created
from the bid condition and bidding process.
Price bid shall have to be quoted strictly online only. Technical –Bid in Hard copy shall be
submitted only by successful bidders upon intimation from SMC (If required.)
ACE/Workshop11/2026-27 SITC_Equipments
1.11.1 Technical bid and Price bid Submission: -
1.11.1.1 Technical Bid
The Technical Bid shall not be submitted in hard copy, except for the specific documents
mentioned in IT-06 that are required to be submitted in hard copy
Sealed cover (EMD, Tender fee ,Affidavit & Undertaking) duly super scribed with name
of work, name of tenderer, address, tender notice number, due date of the tender etc. on the
cover and to be submitted to the Chief Accountant, Surat Municipal Corporation, Tapipura,
Muglisara, Surat – 395 003 by regd. post or speed post through postal authority only. Cover
sent through Angadia / courier or hand delivery shall not be accepted.
The corporation shall not be responsible for postal delay.
Only successful contractor (If Asked) shall submit the hard copy of technical bid after
awarding the contract.
1.11.1.2 Price Bid
Price bid for the aforesaid work must be submitted online only
1.11.2 Documents to be submitted with bid
Tenderer shall be required to submit the enlisted documents on line. If technical bid founds
insufficient documents, then the Price Bid of the tenderer shall not be opened.
i. The tender shall be accompanied by Earnest Money Deposit as mentioned in clause No.
ii. Tender Fees as per described in this tender.
iii. Scan copiesand documents as asked as per IT – 05 & IT-06 of this tender documents
1.11.3 Submission of tender means.
Submission of a tender by a tenderer shall mean that he has read this notice and contract
documents and has made himself aware of the scope and specifications of the work to
be done and of conditions and nature of required quantities of materials stores, tools
and plants etc. that may be required by him in carrying out the work and of local
conditions and laws and bylaws of the Government, Surat Municipal Corporation and
other factors bearing influence on the execution and cost of the works.
1.11.4 Submission of bid in hard copy @ Surat Municipal Corporation
Technical Bid, along with required documents shall be received by Registered Post
A.D. or by Speed Post through Postal Authority only by the "Chief Accountant, Surat
Municipal Corporation, Gordhandas Chokhawala marg, Tapipura,(Mugalisara), Surat -
395 003 between dates mentioned in Important Information of Tender.
Indicate on the sealed envelope Tender Notice no., Name of the Work, Name of the
Department, Name and Address of the tenderer and last date of submission.
ACE/Workshop11/2026-27 SITC_Equipments
Late tenders / delayed tenders shall not be considered at all. Tenders received by
Registered Post A.D. / Speed Post after the time and the date specified in the tender
notice shall not be received by the client from the postman. Such tenders if received
will not be opened and will stand rejected.
1.11.5 Tender shall stand rejected if:
The tenderer shall submit the tender which satisfied each and every conditions laid
down in the notice tender documents, failing which the tender will be liable for
Tenderer’s tender /quotation containing conditions shall be liable for rejection out
rightly without assigning any reason for the same.
Stipulates the validity period less than what is stated in the form or tender.
Stipulates his own conditions.
Does not quote his rates as asked to quote elsewhere in this tender.
The tenderer submits forged / tempered documents.
Does not disclose the full names and address of all his partners in the case of
partnership firm.
Does not pay the Earnest Money Deposit as demanded in this tender and Tender Fees
with Technical Bid.
Does not submit the tender before the stipulated time and specified date in the
Account Office as directed.
Does not attached the document mentionedonline.
The tenderer proposes any alteration in the work specified in the tender or in the time
limit allowed for carrying out the work or any other condition.
The tender is in a language other than English & does not contain its English
The tender documents are not signed affixing the stamp by an authorized signatory,
tender documents submitted are incomplete &/or ambiguous in any respect. Even
noncompliance of provisions, requirement in tender will render it disqualified.
The successful tenderer doesn’t agree to place Security Deposit as specified in the
tender elsewhere.
If technical bid founds insufficient document than tender rejected and the pricebid
of the tender shall not be opened.
The tenderer proposes any alteration in the work specified in the tender or in the time
limit allowed for carrying out the work or any other condition. The tenderer proposed
any alteration in the work specified in the tender, as example; alteration of such that
ACE/Workshop11/2026-27 SITC_Equipments
the main aim of automation of operation of equipment, technology other then as
specified in the tender document, etc.
If any correction done/made in the tender terms, conditions, specifications, etc by
the tenderer in the tender documents taken / downloaded by them
Stipulates conditional tenders and offers conditional discounting.; offering to do part
work, reduce the scope of supply, not fulfilling the terms, conditions, specification
of original tender, etc. The conditional offering discount means the offering discount
subject to any conditions.
Doesn't submitted document as asked in IT-05 and IT-06 of tender.
1.11.6 Important things to be noted
All corrections, additions or posted slips to be initialed by the tenderer.
All page of tender documents including specifications should be initialed by the
Notice of inviting tenders shall be a part of the contract documents.
Acceptance of tenderer will rest with the competent authority of Surat Municipal
Corporation who does not bind himself to accept the lowest and reserves the right to
accept or to reject any or all tenders and no reasons will be given for acceptance or
rejection thereof.
The contractor shall also attach list of machineries, tools, plants, equipment which he
proposes to deploy for this work.(If Applicable & Asked by SMC)
All types of duty and other taxes chargeable by the Surat Municipal Corporation shall
be payable by the contractor.
Tender once accepted shall be binding on the contractor even if the formal agreement
Tender once offered cannot be withdrawn except with the permission of head of the
concerned department, Surat Municipal Corporation, Surat.
The successful tenderer shall be required to enter in to agreement with Surat
Municipal Corporation after placing the work order for the said work from SMC.
The successful tenderer may be required to furnish surety of 20% of the contract value
on stamp paper if so desired by the Municipal Commissioner.
The tenderers are requested to give complete specification of work quoted.
The Price-bid will be opened only after Technical Bid are clarified.
Surat Municipal Corporation reserves the right to open or not to open any or all Price-
bid without assigning any reason thereof.
Tender shall be rejected in case of producing false / forged / tempered documents.
ACE/Workshop11/2026-27 SITC_Equipments
1.12 (IT-12) TENDER VALIDITY PERIOD:
The validity period of the tender submitted for this work shall be of one hundred twenty
(120) Calendar Day from the Last date of online submission of tender and that the tenderer
shall not be allowed to withdraw or modify the tender offer on his own during the validity
The tenderer will not be allowed to withdraw the tender or make any modifications or
additions in the terms and conditions of his own in his tender.
If this is done then the owner shall, without prejudice to any right or remedy, be at liberty
to reject the tender and forfeit the Earnest Money Deposit in full.
1.13 (IT-13) Signing of tender documents:
If the Tender is made by an individual, it shall be signed with his full name above his
current address.
If the tender is made by a Proprietary firm it shall be signed by the proprietor
above, his name and the name of his firm with his current address.
If the tender is made by a firm in partnership it shall be signed by all the partners
of the firm above their full names and current addresses, or by a partner holding the
power of attorney for the firm signing the Tender in which case a certified copy of
the power of attorney shall accompany the Tender. A certified copy of the
partnership deed, current addresses of all the partners of the firm shall also
accompany the tender.
If the tender is made by a limited company or a limited Corporation, it shall be
by a duly authorized person holding the power of attorney for signing the Tender in
which case a certified copy of the power of attorney shall accompany the Tender.
Such limited company or Corporation may be required to furnished satisfactory
evidence of its existence before the contract is award.
All witnesses and sureties shall be persons of status and probity and their full names,
occupations and addresses shall be stated below their signatures. All signatures in the
Tender document shall be dated.
1.14 (IT-14) Opening of tenders:
The tenders will be opened online in two stages i.e. Technical Bid and Commercial Bid.
The Price bid will be opened after evaluation of Documents, certificates etc. mentioned
in this Technical Bid.
The Price-bid will be opened only for technically qualified bidder.
ACE/Workshop11/2026-27 SITC_Equipments
1.15 (IT-15) Withdrawal of tenders:
If, during the Tender validity period, the Tenderer withdraws his Tender, the Tender
Security (Earnest Money) shall be forfeited and the Tenderer may be disqualified from
tendering for further works under the jurisdiction of Surat Municipal Corporation.
1.16 (IT-16) Interpretations of tender document:
Tenderer shall carefully examine the tender documents and fully inform themselves as to
all the conditions and matters which may in any way affect the work or the cost thereof.
Should a tenderer find discrepancies or omission from the specifications or other
documents, or should be in doubt as to their meaning, he should at once address query to
the Divisional Head provided for concerned authority. Any resulting interpretation of the
Tender documents will be issued to all Tenderers as an addenda corrigendum. Verbal
clarification and / or information given by the SMC / Consulting Engineer shall not be
binding on the Surat Municipal Corporation.
1.17 (IT-17) Errors and discrepancies in tenders:
In case of conflict between the figures and words in the rates, the rates expressed in words
shall prevail and apply in such cases. The contractor shall particularly note the units on
which the rates are based. In case the rate in word differs from that in figure, the former
will be taken as correct. No changes in units shall be allowed.
In case of any conflict between two conditions in the tender, most stringent condition
shall be made applicable and shall be acceptable to the bidders / contractors.
1.18 (IT-18) Modifications of documents:
Modification of specifications and extension of the closing date of the tender, if required,
will be made by an addendum. Copies of each addendum will be published On Line to all
tenderer. These shall be signed and shall form a part of tender. The tenderer shall not add
to or amend the text of any of the documents except in so far as may be necessary to comply
with any addenda.
1.19 (IT-19) Addenda
Addenda form part of the contract documents & full consideration shall be given to all
addenda in the preparation of tenders. Tenderer shall verify the number of addenda issued,
if, any and acknowledge the receipt of all Addenda in the Tender. Failure to acknowledge
may cause the Tender to be rejected.
ACE/Workshop11/2026-27 SITC_Equipments
The Addenda to be issued to advice tenderer of changed requirements. Such addenda may
modify previously issued Addenda.
Addenda and Corrigendum, if any, shall be uploaded on n-procure/website by the SMC.
All Addenda Corrigendum issued by the SMC shall become a part of the tender document.
Tenderer shall have to submit the signed addenda and corrigendum with other required
documents of tender.
1.20 (IT-20) Taxes and duties:
Refer GST annexure of this tender (Annexure-VI)
1.21 (IT-21) Evaluations of tenders:
Evaluation of Bids: Only those bids that comply with the tender terms and conditions and
are considered technically acceptable and in the best interest of Surat Municipal
Corporation (SMC) shall be considered for further evaluation.
Item-Wise Quotation: The bidder shall quote item-wise rates for all items mentioned in
Details of Machineries & Equipment: The bidder shall submit complete details of the
Machineries, equipment offered, including the brand name, make, model number, technical
specifications and other relevant product details in the manner specified in the tender
Acceptance of Brand and Make: The Machineries & equipment offered by the bidder
shall conform to the technical specifications and quality requirements stipulated in the
tender. Where a specific make or brand is not prescribed, the bidder shall offer equipment
of a genuine and technically suitable make, supported by relevant product documentation.
SMC reserves the right to reject any equipment or offer that does not meet the prescribed
specifications, quality standards or other tender requirements, in accordance with the
applicable bid evaluation provisions. The lowest quoted rate (L1) shall not, by itself, confer
any right to award of work or supply order.
Splitting of Work and Supply Orders: SMC reserves the right to award the work relating
to the supply of new machineries & Equipment, either as a whole or in separate parts, based
on the item-wise rates, technical acceptability and the overall interest of SMC. Such
splitting may be undertaken subject to the applicable tender conditions and approval of the
competent authority.
ACE/Workshop11/2026-27 SITC_Equipments
Right of SMC to Split the Scope of Work :-
Surat Municipal Corporation (SMC) reserves the right, at its sole discretion, to split, divide,
reduce or allocate the work specified under this tender, either in its entirety or partially,
depending on its actual requirements. The bidder shall have no claim for compensation,
loss of profit or any other additional payment on account of such splitting or reduction of
the scope of work.
The decision of SMC regarding the extent and allocation of the work shall be final and
binding on the successful bidder, subject to the terms and conditions of the tender.
Tie in Lowest Rates: In the event of identical lowest quoted rates for the same item among
two or more technically qualified bidders offering the same acceptable make or brand, SMC
reserves the right to split the order among such bidders or decide the allocation in
accordance with the applicable tender provisions and the decision of the competent
Quantity and Order Value: The quantity of equipment to be awarded to each successful
bidder, and the corresponding order value, shall be determined by SMC through the
competent authority, considering the approved requirements, item-wise rates and
applicable tender conditions. No bidder shall have any claim to a minimum quantity, order
value or exclusive award of work merely on the basis of being the lowest bidder.
Applicability of Contract Conditions in Case of Splitting: In the event of splitting of
supply orders among two or more bidders, all applicable terms and conditions of the tender,
including execution of the contract agreement, submission of security deposit, completion
schedule, warranty obligations and other contractual requirements, shall apply separately
to each successful bidder, as applicable to the work or supply order awarded to that bidder.
Final Authority for Bid Evaluation: SMC shall evaluate the bids in accordance with the
tender conditions and applicable procurement rules. Decisions regarding technical
evaluation, acceptance or rejection of bids, item-wise award, splitting of work and other
matters shall be taken by the competent authority of SMC in accordance with the tender
provisions. Such decisions shall be binding on the bidders, subject to applicable laws and
procurement rules.
1.22 (IT-22) Time required for completion:
1.22.1 Contract Duration
The contract period for the entire contract shall be 30 (thirty) days from the date of issue
of the main work order by Surat Municipal Corporation (SMC).
ACE/Workshop11/2026-27 SITC_Equipments
The shifting and reinstallation of the existing chain pulley block and air compressors, along
with the supply, installation, testing and commissioning of pneumatic equipment, shall be
carried out in a phased and stage-wise manner, as directed by SMC, to ensure the
uninterrupted functioning of the New Municipal Workshop and to avoid any disruption or
loss of vehicle maintenance and repair activities.
The contractor shall coordinate with the concerned SMC officials and plan the execution
of each stage in advance. The contractor shall ensure that the required equipment,
manpower, tools and materials are available as per the approved schedule and that each
stage of work is completed within the stipulated contract period.
The contractor shall not undertake any activity that may adversely affect the ongoing
vehicle maintenance operations without prior approval from the competent authority of
1.22.2 Time limit
During the validity of the Rate Contract, Surat Municipal Corporation (SMC) shall issue
various sub purchase orders/work orders as per specific procurement requirements.
The contractor/supplier shall complete the supply/execution of work under each sub
purchase order/work order within 20 (Twenty) days from the date of its issuance, unless
otherwise specified in the order
The tenderer shall quote accordingly. Any deviation from the specified completion time
shall not be accepted, and the tender of such a tenderer shall be liable for rejection.
1.23 (IT-23) Liquidated damages (LD) in case of delayed work
The job shall be completed within the delivery / completion period mentioned failing which
a liquidated damages (LD) shall be applicable for that individual Part Order / Sub Order
for the Delay in work.
In case of delay in execution of work the liquidated damages (LD) at the rate of 0.2% of
unexecuted portion of order per day subject up to maximum of 10%, shall be payable by
the contractor to the Corporation towards compensation.
Liquidated damages (LD) maybe deducted from the pending bills / security deposits / EMD
of the contractor.
1.24 (IT-24) Force majeure& Contract time limit extension & termination related:
If, at any time, the execution of the Contract is affected by War, (declared or not),
hostilities, invasion, acts of foreign enemies, civil war, rebellion, revolution
insurrection, riots and civil commotion (other than solely restricted to the
employees/workers of Contractor), Acts of State, Acts of God such as earthquake,
ACE/Workshop11/2026-27 SITC_Equipments
massive floods and other notified epidemic which an experienced contractor could not
have reasonably foreseen or reasonably made provision for these or insured against, then
the Contractor shall, within seven days of such occurrence, apply to the SMC together
with the adequate evidence for obtaining such extension of time as may be warranted by
the circumstances.
After a careful examination of the circumstances, the SMC may grant such extension of
time as deemed necessary, without insisting on changing liquidated damages from the
Contractor for such period.
Any extension of time granted by the SMC shall neither entitle the Contractor to claim for
any increase in prices nor shall it release him from any of the obligations under the Contract.
If the execution of the Contract as a whole is delayed by the reason of force majeure
conditions persisting for a continuous period exceeding six months, the SMC and the
Contractor shall discuss the matter and decide either to terminate the Contract
without obligations on each side or to continue its execution on such terms as may be
1.25 IT-25 Prices & offer:
The bidder shall offer a rate in percentage (%) Above / Below / Equal to the latest
valid Price List (including of GST).
The resulting rate after applying the bidder’s percentage (%) offer shall be including
of GST and all other applicable taxes, duties, levies, and costs including carting,
transportation, insurance, loading, unloading, and delivery up to the Municipal
Workshop, Umarwada, Surat Municipal Corporation (SMC)/New Municipal
Workshop, Opposite SIMS Hospital, Lal Darwaja, Surat. No GST shall be paid
In the event the manufacturer revises the Price List from “Including of GST” to
“Exclusive of GST”, the bidder shall submit the revised Price List with proper
supporting documents to SMC. The decision regarding reimbursement of GST, if
any, shall rest with SMC, and the bidder shall remain bound by such decision.
The percentage (%) offer quoted by the bidder shall remain firm and fixed
throughout the entire contract period. However, if the manufacturer revises the Price
List of the items, the revised rates shall be applicable from the effective date, subject
to submission of the revised Price List with supporting documents to the office of
the undersigned.
No claim for any additional payment beyond the rates quoted/offered shall be
entertained. The bidder shall not be entitled to make any subsequent claim on any
ACE/Workshop11/2026-27 SITC_Equipments
ground, except as specifically provided under the conditions mentioned in this
1.26 IT-26Payment terms:
1.26.1 Payment Terms
The Municipal Corporation shall not under any circumstances relax the terms of payment
and will not consider any alternative terms of payment. Tenderer should therefore in their
own interest note this provision to avoid rejection of their tender.
No advance payment shall be made. Payment will be made as per the actual executed
Payment shall be made against submission of invoice and necessary documents mentioned
in the tender documents only after completing formalities like initial security deposit
submission, Signing of measurement book (For that Bidder need to visit municipal
workshop whenever asked for the same) , submission of signed contract agreement
etc. from bidders end and completion of departmental payment procedure like invoice
certification, payment sanction , contact agreement registering with secretary branch of
SMC etc.by SMC.
Bidder also need to ensure that GST of supplied material should be paid with same invoice
number that submitted to Surat Municipal Corporation and also as early as possible to avoid
unnecessary delay in payment with GST.
Bidder have to take at most care regarding HSN code and its applicable tax slab for item
mentioned in invoices i.e. it must as per prevailing GST tariffev . SMC may ask bidder to
verify the same through your Charter Accountant.
It is to be noted that contractor has to submit the documents related to
procedural/Legal/Routine/statutory requirements of SMC and government depts. etc. as per
prevailing rules and regulations as and when demanded by department, otherwise payment
will not be released/processed.
If any discrepancy found regarding this than payment may get delayed.
1.26.2 Deduction in Payment: -
Payment will be done on satisfactory completion work, after submission of invoice.
Deduction / recovery shall be made as mentioned in tender documents elsewhere
Pl refer 1.30 i.e. IT-30 (Performance guarantee/ SD) for more details regarding
Also All the Standard Deduction done as per Prevailing rules and regulation of Surat
Municipal Corporation.
ACE/Workshop11/2026-27 SITC_Equipments
1.27 IT-27 Consider as Deleted:
1.28 IT-28 Signing of contract:
The successful tender shall be required to pay the security deposit and to execute the
contract within 15 days of receipt of intimation to execute the contract, failing which the
Surat Municipal Corporation will be entitled, if desired, to annul the award and forfeit the
Earnest Money Deposit. The person to sign the contract document shall be person detailed
in clause 1.13 i.e. IT-13.
1.29 IT-29 Disqualifications:
A tender shall be disqualified and will not be taken for consideration if: -
The outer envelope does not show on the outside the reference of bid (as per Article
IT-11) and thus get opened before the due date of opening.
The tender Security Deposit is not deposited in full and in the manner as specified
in tender i.e. Earnest Money Deposit.
The tender is in a language other than English or does not contain its English
Translation in case of other language adopted for tender preparation.
The tender documents are not signed by an authorized person (as per Article IT -
13 i.e. Signing of tender documents).
The general performance data for qualification not submitted fully (As per Article
IT-05 qualifications of tenderer).
The tenderer does not agree to deposit security amount as specified (as per Article
IT-30 i.e. Performance guarantee (security deposit)).
The tenderer does not agree to payment terms defined as per Article IT-26 i.e.
Payment Terms.)
Conditional tender
If the tenderer is ever terminated or banned for any work by Surat Municipal
Corporation for any reason.
Tenderer may further be disqualified if:
Price variation is proposed by the Tenderer on any principles other than provided
in the Tender Documents.
Completion schedule offered is not consistent with the completion schedule defined
and specified in tender documents.
ACE/Workshop11/2026-27 SITC_Equipments
The validity of tender is less than that mentioned in Article IT-12 i. e. Tender
Validity Period.
Any of the page or pages of tender is/are removed or replaced.
All corrections or pasted slips are not initialed by tenderer.
Any erasure is made in the tender.
Any other reason as mentioned in 1.11.5
1.30 IT-30 PERFORMANCE GUARANTEE (SECURITY DEPOSIT)
The total Security Deposit is 4% (Four) percent of contract value shall be as under:
Initial Security Deposit (2%) shall be paid in form of Cash or Demand Draft/ Pay
Order of any bank from bank list mentioned in Annexure-VIII of this tender only,
if the Tender Amount of work is less than Rs. 2.00 Crore.
Initial Security Deposit (2%) shall be paid in form of Cash or Demand Draft/ Pay
Order / bank Guarantee (encashable at Surat city)/ FDR of any bank from bank
list mentioned in Annexure-VIII of this tender only, if the tender Amount of work
is more than Rs. 2.00 Crore.
The person/persons whose tender may be accepted [here-in after called the Contractor,
which expression shall unless excluded by or repugnant to the context include his heirs,
executors, administrators and assignees] shall [within 15 days of the receipt by him of the
notification of the acceptance of his tender] deposit with Municipal Commissioner cash or
Government securities endorsed to the Commissioner sum sufficient which will make up
the full security deposit specified in the tender.
If the amount of the security deposit to be paid in lump sum within the period specified
above is not paid the tender contract already accepted shall be considered as cancelled.
The security deposit lodged by Contractor shall be refunded after the expiry of the Defects
Liability period as shown elsewhere in this tender after deducting dues, if any, which
become liable to be recovered from the Contractor under the terms and conditions of this
Bank guarantee should be en-cashable at Surat.
1.30.1 Additional Performance Security Deposit"
(a) If the Contract Price offered by the Selected Bidder is lower than 10% but upto
20% of the Estimated Project Cost, then the Additional Performance Security shall
be calculated @ 20% of the difference in the (i) Estimated Project Cost (as mentioned
in Bid Document) - (Minus) 10% of the Estimated Project Cost and (ii) Contract Price
offered by the selected Bidder.
ACE/Workshop11/2026-27 SITC_Equipments
(b) If the Contract Price offered by the Selected Bidder is lower than 20% of the
Estimated Project Cost, then the Additional Performance Security shall be calculated
@ 30% of the difference in the (i) Estimated Project Cost (as mentioned in Bid
Document) - (Minus) 10% of the Estimated Project Cost and (ii) Contract Price
offered by the selected Bidder.
(c) This Additional Performance Security shall be treated as part of the Performance
1.30.2 Remittance and release of Security Deposit (SD), Retention money deposit (RMD)
Regarding remittance and release of Security Deposit (SD), Retention money deposit
(RMD) following clause will supersede over and above all the clauses depicted in the tender
(A) For Tender costing less than Rs.2.00 Crore.
Remittance of SD/RMD
The total security deposit shall be recovered at the rate of 4% from the
contractor. Out of which, 50% of amount as Initial Security Deposit shall be
payable at the rate of 2% of approved tender cost in form of Cash or
Demand Draft/ Pay Order of any Nationalized Bank (encashable at Surat
city) from bank list mentioned in Annexure-VIII of this tender only.
The remaining amount of the Security Deposit i.e. 2% to be deducted from
each running account bill.
5% Retention money deposit (RMD) to be retained from each running
Release of SD/RMD
2% security deposit recovered from each running account bills shall be
released only after clearance of Final bill by Audit Dept.
5% Retention money deposit (RMD) to be released along with final bill.
(B) For tender costing Rs.2.00 Crore & more than Rs.2.00 Crore.
Remittance of SD/RMD
The total security deposit shall be recovered at the rate of 4% from
contractor. Out of which, 50% of amount as Initial Security Deposit shall be
payable at the rate of 2% of approved tender cost in form of in Cash or
Demand Draft/ Pay Order / FDR / Bank Guarantee of any Nationalized
Bank (encashable at Surat city) from bank list mentioned in Annexure-VIII
of this tender only.
ACE/Workshop11/2026-27 SITC_Equipments
The remaining amount of the Security Deposit i.e. 2% to be deducted from
each running account bill.
5% Retention money deposit (RMD) to be retained from each running
Release of SD/RMD
2% security deposit recovered from each running account bills Shall be
released only after clearance of Final bill by Audit Dept.
5% Retention money deposit (RMD) to be released along with final bill.
Whereas the 2% Initial security deposit shall be released after clearance of Final bill
by Audit Dept.& completion of defect liability period / O&M Period.
It is clarified that the amount of security deposit shall be collected on the basis of contract
price and not on the basis of estimated Amount put to tender. As initial Security Deposit
as mentioned above, accepted by the competent Authority shall have to be paid toward
Security Deposit at the time of execution of agreement.
1.30.3 Late SD submission penalty
If the Security Deposit is not paid within 15 days from the date of L.O.I. / Work Order than
penalty at the rate of 0.065% per day of the amount of Security Deposit will be charged. if
the security deposit is not paid within one month with interest, necessary actions as per
condition of contract will be taken.
1.30.4 Initial Security Deposit in form of Bank Guarantee in a form of BG and penalty
Initial Security Deposit (i.e. 2% Of Tender Amount) in form of Bank Guarantee may be
accepted as per relevant tender provision, However BG shall be valid till final date of
completion of work+1year (Whether final bill is audited and paid or not). It shall be
contractor's responsibility to extent the BG On or before expiry of time limit of BG. In case
of late renewal of BG, penalty of security deposit shall be levied at the rate of 4% of per
day of BG amount.
1.30.5 Additional Deduction as SD
Surat Municipal Corporation (SMC) reserves the right to deduct and retain, at its discretion,
any additional amount so as to ensure that at least 10% (Ten Percent) of the total order
value is maintained as Security Deposit with SMC at all times. Such retention shall
remain in force until the satisfactory completion of the work and shall be released in Final
ACE/Workshop11/2026-27 SITC_Equipments
bill only after completion of the contract, subject to due compliance with all contractual
obligations by the Contractor
1.30.6 Initial Security Deposit & stamp duty related
The successful tenderer shall have to enter into an agreement on a non-judicial stamp paper
of Rs. 300/- if initial Security Deposit paid in form Bank Guarantee or Demand draft as per
the form of the agreement approved by the Municipal Corporation, Surat.
If initial Security deposit is paid in form of Fixed Deposit, additional stamp paper
amounting @ 4.90% (OR as per government prevailing rules and regulations) of Security
Deposit shall be used to execute the agreement.
The undertaking shall be executed on stamp paper worth Rs. 300/-. And The Surety shall
be executed on stamp paper worth Rs. 300/-.
However, the stamp duty at prevailing rate shall be applicable if revised by government
1.30.7 In case the total amount of work done is less than 5% of the contract value
1.30.7 In case the total amount of work done is less than 5% of the contract value
Refer 2.51 i.e. Clause
1.30.8 If there is increase in amount of work more than 5% of the contact value.
Refer 2.51 i.e. Clause
1.30.9 SMC bank Details
ACCOUNT NAME: SURAT MUNICIPAL CORPORATION
Bank Name with Branch Name & Address: Bank of Baroda, Bhagatalav, Surat.
IFSC Code: BARB0BHAGAT (Fifth Character is "Zero")
1.31 IT-31 Stamp duties:
1.32 IT-32 Non-transferable:
Tender documents are not transferable.
1.33 IT-33 Cost of tendering:
The SMC will not be responsible for defraying any expenses incurred by Tenderers during
the tendering process.
ACE/Workshop11/2026-27 SITC_Equipments
All expenses related to the submission of tenders are to be borne by the Tenderers
1.34 IT-34 Change in a quantity:
Surat Municipal Corporation reserves the right to very to quantities of items or group as
may be necessary. Claim what so ever by the contractor on the basis of variation of
quantities shall not be entertained.
1.35 IT-35 Mode of measurement:
To be consider as instructed by Engineer in charge.
As per Actual Executed Quantity.
1.36 IT-36 New material /items;
All materials /Items, spare parts thereof shall be new and unused and compatible to use in
purpose for which it's manufactured.
The rebuilt or overhauled equipment/materials will not be allowed to be used on work.
1.37 IT-37 Rights reserved;
The SMC reserves the right to reject any or all tenders, to waive any informality or
irregularity in any tender without assigning any reasons.
Without assigning any reason, The Surat Municipal Corporation reserves the right to reject
the lowest or any other or all tenders or part of its. To waive any informality or irregularity
in any tender, which in the opinion of the Surat Municipal Corporation does not appear to
be in its best interest and the tenderer shall have no cause of action or claim against the
Surat Municipal Corporation or its officers, employee, successors or assignees for rejection
of this tender.
The Surat Municipal Corporation further reserves the right to withhold issuance of the
notice to proceed, after execution of the contract agreement by the successful Tenderer.
The Surat Municipal Corporation is not obliged to give reasons for any such action.
The Surat Municipal Corporation reserves the right to increase or decrease the scope of
work and split the tender in two or more parts without assigning any reason even after the
award of contract.
1.38 IT-38 Regulations
ACE/Workshop11/2026-27 SITC_Equipments
1.39 IT-39Water Supply and Electricity
Consider as Deleted
1.40 IT-40 Drawings:
1.41 IT-41 Works to be covered up (If Applicable)
1.42 IT-42 Necessary fittings
1.43 IT-43 Manufacturer’s instructions
Where manufacturers have furnished specific instructions, relating to the material and
equipment used for the works, covering points not specifically mentioned in above
documents, such instructions shall be followed in all cases and the contractor shall inform
the Engineer-in-Charge accordingly.
1.44 IT-44 Make and Quality standard
The option for selection of the Make/product/Brand shall rest with Surat Municipal
Corporation, i.e. the contractor shall have to supply the materials, equipment of a make as
approved by the Surat Municipal Corporation.
All equipment and materials used shall comply with the relevant Indian
Standard/International Standards unless a more rigorous requirement is specifically
If no applicable Indian Standard is available for any item of equipment of materials, the
corresponding International Standards dealing with the subject in question shall be adopted.
In every condition the latest specifications, standards etc. shall apply unless otherwise
stated. In instances where there is a conflict between two codes (the Indian Standard
accepted), the more restrictive of the two shall apply.
Where the name of one or more manufacturers has been indicated in the drawings or
mentioned in these specifications, the same is intended only to define the type, quality
and standard required. It is not restrictive in nature, nor does it imply exclusivity of a
particular make. The Tenderer shall, however, procure equipment and materials strictly
from the "Make/ brand/ company" list provided in the tender documents, ensuring
full compliance with these specifications and requirements.
ACE/Workshop11/2026-27 SITC_Equipments
All equipment and materials shall be procured from reputed manufacturers and shall,
wherever applicable, bear the ISI certification mark. Further, all such equipment shall
conform to the latest relevant Indian Standard (IS) specifications.
1.45 IT-45 Equipment data plate
As per Manufacturer standard
1.46 IT-46 Inspections
1.47 IT-47 Plants and equipment Consider as Deleted:
1.48 IT-48 Defect liability period
Defect liability period for purpose of releasing performance security will be considered as
1 year from the date of completion of work
The Defect Liability Period and the Warranty/Guarantee Period are distinct in scope,
although both provide protection against defects.
Even after the expiry of the Defect Liability Period, the bidder shall ensure the availability
of the warranty/guarantee for each item, part, and ready-made component—whether
procured from reputed OEMs or manufactured by the bidder—used in the manufacture of
the complete unit, as well as for the complete unit itself.
This warranty/guarantee shall remain valid for a period as per the OEM’s
warranty/guarantee terms for the same.
Such guarantee/warranty shall cover design, defects, workmanship, and performance
and other related things mentioned elsewhere in this tender
Any defect found whether in materials or workmanship should be made rectified by the
Contractor at his own expenses within the time specified by the Engineer-in-Charge.
Manufacturer’s guarantee for design, workmanship and performance of all bought out
items shall be made available to the SMC and shall be valid at least for the period as per
In the event of failure of any equipment for more than three times during the guarantee
period, the contractor shall replace the same at his cost. Manufacturer’s guarantee, as
mentioned above for such replaced equipment shall also be made available to the SMC and
should be kept valid at least for one year from the date of last replacement or ass per OEM
standard whichever is longer
ACE/Workshop11/2026-27 SITC_Equipments
1.49 IT-49 Operating instructions and manuals
On completion of work and delivery of vehicle, Bidder has to provide set of record
drawings, showing the entire unit with their parts components, sub-components, part list
along with all operation and maintenance manual with all descriptive leaflets, instructions,
specifications and operation cum maintenance as prescribed.
The Contractor shall submit the records/drawings in the number of sets as specified under
1.50 IT-50 Alteration in scope of work
Refer 2.14 i.e. Clause
1.51 IT-51 Consider as Deleted:
1.52 IT-52 Non Acceptance of Conditional tender
The scope of work is clearly mentioned in the tender documents. The contractor shall have
to carry out the work in accordance with the details specifications.
No conditions will be accepted. The conditional tender will be liable to be rejected.
1.53 IT-53 Familiarization
Tenderer shall get acquainted with the site conditions sufficiently in advance of the date
fixed for submission of tender and shall have satisfied him as to the nature of work to be
The tenderer shall be deemed to have full knowledge of all the relevant documents, existing
site conditions etc. whether he inspects them or not.
1.54 IT-54 Clarification Deleted
1.55 IT-55 Labor Regulation
Refer 2.41 i.e Clause 41 (2.41.2) Not Applicable
1.56 IT-56 Contractor’s Obligations under Labour Legislation
Refer 2.41 i.e Clause 41 (2.41.3) Not Applicable
1.57 IT-57 Child labor
Refer 2.41 i.e Clause 41 (2.41.4) Not Applicable
ACE/Workshop11/2026-27 SITC_Equipments
1.58 IT-58 deleted
1.59 IT-59 deleted
1.60 IT-60 Firm Quoted Offer, Interpretation Authority, Legal Jurisdiction, and Pre-
Tender Clarifications
The quoted offer should be firm and fix.
In case of any miss-understanding due to interpretation of any terms, conditions and
specifications the decision of Divisional head of the department, Surat Municipal
Corporation, Surat shall be final and binding on the part of contractor.
The contract shall be constituted according to and subject to laws in India and State of
Gujarat under the Jurisdiction of Court of Surat only.
Any other details if required can be head from the office of the Executive engineer
(Workshop/Mech), Surat Municipal Corporation, Umarwada, Surat on request and prior to
submitting the tender. No dispute at a later date shall be entertained.
1.61 Verification, Acceptance of Equipment and Payment
Payment shall be released only after successful verification, inspection, and
confirmation by the authorized staff of the Municipal Workshop, Surat Municipal
Corporation (SMC), that the equipment supplied conforms to the technical
specifications, make, model, capacity, performance requirements, and intended
application stipulated in the tender and is found satisfactory for use at the site.
In the event of any discrepancy, ambiguity, misrepresentation, or non-conformity
between the tender requirements and the equipment actually delivered, SMC shall be
entitled to withhold payment for the affected item until the discrepancy is satisfactorily
resolved. No payment shall be made for any item that fails to meet the prescribed
technical specifications or intended application.
Any attempt to misrepresent the make, brand, model, capacity, or specifications of the
equipment, including but not limited to affixing unauthorized brand stickers, labels, or
nameplates, or supplying equipment that does not conform to the specified make,
model, capacity, performance, or intended application, shall be treated as a material
breach of the contract. In such cases, SMC reserves the right to reject the equipment,
withhold payment for the affected item, and initiate appropriate contractual action,
including forfeiture of the EMD and/or security deposit, wherever permissible under
the tender conditions and applicable rules.
In such circumstances, SMC may, at its discretion, direct the contractor to arrange for
the purchase and supply of the correct equipment from a local authorized dealer or
supplier, in the presence of the authorized staff of the Municipal Workshop, for
ACE/Workshop11/2026-27 SITC_Equipments
verification and approval. The contractor shall bear any additional cost incurred in
procuring and supplying the compliant equipment. No additional payment or price
difference shall be payable by SMC on this account, and the contractor shall remain
responsible for fulfilling all contractual obligations within the stipulated time.
Executive Engineer
Municipal Workshop
Surat Municipal Corporation
Signature of Contractor
ACE/Workshop11/2026-27 SITC_Equipments
SURAT MUNICIPAL CORPORATION
MUNICIPAL WORKSHOP
2 Conditions of contract
2.1 Clause 1 Performance guarantee related as per IT-30
2.2 Clause 2 Time completion and Delay Penalty as per IT-22 and IT-23
2.3 Clause 3 Contractor Liability in a case of contract termination
2.3.1 In any case in which under any clause of or clauses this contract the Contractor shall have
tendered himself liable to pay compensation amounting to the whole of this security deposit
(Whether paid in one sum or deducted by installments) or in the case of abandonment of
the work owing to serious illness or death of the contractor or any other cause, the
Commissioner on behalf or the Corporation shall have power to adopt any of the following
courses, as he may deem best suited to the interest of the Municipal Corporation.
2.3.2 (a)To rescind the contract (of which rescission notice in writing to the Contractor under the
hand of the Commissioner shall be conclusive evidence) and in that case that security
deposit of the Contractor shall stand forfeited and be absolutely at the disposal of the
Municipal Corporation.
2.3.3 (b)To employ labour paid by the Workshop Department and to supply material to carry out
the works, or any part of the work debiting the Contractor with correctness of which cost
and price the certificate of the Executive Engineer shall be final and conclusive against the
Contractor and crediting him with the value of the work done, in all respects in the same
manner and at the same rates as if it had been carried out by the contractor under the terms
of his contract, and in that case the certificate of Executive Engineer as to the value of the
work done shall be final and conclusive against the Contractor.
2.3.4 (c)To order that the work of the Contractor be in measured up and to take such part thereof
as shall be executed out of his hands and to give it to another contractor to complete, in
which case any expenses which may be incurred in excess of the sum which would have
been paid to the original contractor, If the whole work had been executed by him (as to the
amount of which excess expenses the certificate in writing of the Executive Engineer
(Workshop) shall be final and conclusive) be borne and paid by the original Contractor and
shall be deducted from any money due to him by the Municipal Corporations under the
ACE/Workshop11/2026-27 SITC_Equipments
Contract of otherwise from security deposit or the proceeds of sale thereof, or a sufficient
2.3.5 (d)In the event of any of the above courses be adopted by the Commissioner the Contractor
shall have no claim to compensation for any loss sustained by him by reason of his having
purchases or procured any materials or entered into any engagements, or made any
advances on account of or with a view to the execution of the work or the performance of
the contract and in case the contract shall be rescinded under provision aforesaid, the
contractor shall not be entitled to recover, or be paid any sum for any work thereto actually
performed by him under this contract unless and until the Executive Engineer (Workshop)
shall have certified in writing the performance of such work and the amount payable to him
in respect thereof, and he shall only be entitled to be paid the amount so certified.
2.4 Clause 4 Action for Unsatisfactory Progress
2.4.1 If the progress of any particular portion of the work is unsatisfactory the commissioner
shall not be withstanding that the general progress of the work is satisfactory in accordance
with Clause 2, be entitled to take action under Clause 3 after giving the contractor 10 days’
notice in writing and the Contractor will have no claim for compensation for any loss
sustained by him owing to such action.
2.5 Clause 5 Exercise of Commissioner’s Powers
2.5.1 In any case in which any of the powers conferred upon the Commissioner by Clause 3 and
Clause 4 hereof shall have become exercisable and the same shall not have been exercised
the non-exercise thereof shall not constitute a waiver of any of the conditions hereof such
powers shall not withstanding be exercisable in any future case default by the Contractor
for which by any clauses hereof he is declared liable to pay compensation amounting to the
whole of his security deposit and the liability of the contractor for past and future
compensation shall remain unaffected.
2.6 Clause 6 Extension of Time for Completion
2.6.1 If the Contractor shall desire an extension of the time for completion of the work on the
ground of his having been unavoidably hindered in its execution or on any other ground,
he shall apply in writing to the Commissioner within 30 days from the date on which he
was hindered as aforesaid or on which the cause for asking for extension occurred and the
Commissioner may, if in his opinion, there are reasonable grounds for granting as
ACE/Workshop11/2026-27 SITC_Equipments
extension, grant such extension as he thinks necessary or proper. The decision of the
Commissioner in this matter shall be final.
2.7 Clause 7 Certificate of Completion after Site Clearanceand Non-compliance lets SMC
remove/clean at contractor’s cost Deleted
2.8 Clause 8 Payment Terms Including Restrictions on Small Works, Interim Advances,
and Final Settlement of Accounts
2.8.1 No payment shall be made for any work, estimated to cost less than Rupees one thousand,
till after the whole of the said work shall have been completed and a certificate of
completion given, But in the case of works estimated to cost more than Rupees One
thousand, the Contractor shall, on submitting a monthly bill therefore be entitled to receive
payment proportionate to the percentage shown in the attached Memorandum of the part of
the work than approved and passed by the Engineer-in-Charge, whose certificate of such
approval and passing of the sum so payable shall be final and conclusive against the
2.8.2 All such intermediate payments shall shall not preclude the Engineer-in-Charge from
requiring bad, unsound imperfect of unskillful work to be removed and taken away and
reconstructed, or re-erected, nor shall any such payments be considered as an admission of
the due performance of the contract or any part thereof in such respect of the accruing of
and claim nor shall it conclude, determine or affect in any the powers of the Engineer-in-
Charge as to the final settlement and adjustment of the accounts or otherwise, or in any
other way vary or affect the contract.
2.8.3 The final bill shall be submitted by the contractor within month of the date fixed for the
completion of the work, otherwise the Engineer-in-Charge's certificate to the measurement
and of the total amount payable for the work shall be final and binding on all parties.
and of the total amount payable for the work shall be final and binding on all parties.
ACE/Workshop11/2026-27 SITC_Equipments
2.9 Clause 9 Rates Applicable for Accepted Work and Reduced Rates for Incomplete or
Non-Compliant Work
2.9.1 The rates for several items of the work agreed to within shall be valid only when the item
concerned is accepted as having been completed fully in accordance with the sanctioned
specifications.
2.9.2 In cases where the items of works are not accepted and so completed the Engineer-in-
Charge may make payment on account of such items at such reduced rates as he may
consider reasonable in the preparation of final or on account bills.(If applicable and / or
required by SMC )
2.10 Clause 10 Bill Submission and Verification of measurement
2.10.1 A bill may be submitted by the Contractor once in each month on or before the date fixed
by the Engineer-in-Charge or after work completion (mentioned elsewhere in this tender)
for all works executed in the previous months, and the Engineer-in-Charge shall take or
cause to be taken the requisite measurement for the purpose of having the same verified,
and the claim, so far as it is admissible shall be adjusted if possible within fifteen days from
the presentation of the bill.
2.10.2 It the contractor does not submit the bill within the time fixed as aforesaid, the Engineer-
in-Charge may depute a subordinate to measure up the said work in the presence of the
Contractor or his duly authorized agent whose counter signature to the measurement list
shall be sufficient warrant, and the Engineer-in-Charge may prepare a bill from such list
which shall be binding on the Contractor in all respects.
2.11 Clause 11 Bill format and Billing Rate
2.11.2 All charges in the bills shall be entered strictly at:
The sanctioned rates, for work covered under the contract.
2.12 Clause 12 Supply of materials to the contractor from the S.M.C. store and Ownership
of Materials Deleted
ACE/Workshop11/2026-27 SITC_Equipments
2.13 Clause 13 Execution of Work in Accordance with Specifications, Drawings, and
2.13.1 The Contractor must carry out the entire work (every part of it) in most substantial proper,
and workmanlike manner.
2.13.2 All work must strictly comply with the approved specifications, materials, designs,
drawings, and written instructions issued by the Engineer-in-Charge.
2.13.3 These documents will be kept in the Engineer-in-Charge’s office, and the Contractor has
the right to inspect them at the office or work site during office hours.
2.13.4 At his own expense, the Contractor may make copies of the specifications, designs,
drawings, and instructions for reference.
2.14 Clause 14 Alterations and Additions of Work
2.14.1 Power to Alter or Add Work and payment rate of that work
The Engineer-in-Charge shall have power to make any alterations in, or additions to the
original specifications, drawings, designs and instructions that may appear to him to be
necessary or advisable during the progress of the work, and the Contractor shall be bound
to carry out the work in accordance with any instructions in this connection which may be
given to him in writing signed by the Engineer-in-Charge
Such alteration shall not invalidate the contract
Additional/altered work will be paid at the same rates as the main tendered work, if
If the altered/additional work involves items not covered in the contract:
Payment will be as per Municipal Corporation’s schedule of rates, or at mutually
agreed rates (whichever is lower).
If no rate exists in the schedule, the Contractor must propose rates within 7 days of
receiving the order.
If the Engineer-in-Charge disagrees, he may cancel the order and arrange execution
If the Contractor starts work before rates are finalized, payment will be at rates fixed
by the Engineer-in-Charge.
In case of disputes, the Commissioner’s decision will be final.
ACE/Workshop11/2026-27 SITC_Equipments
2.14.2 Ensuring the Inclusion of Alterations from Contractor-Proposed Designs in the Work
If the work is executed according to designs/drawings/specifications proposed by the
Contractor and approved by the competent authority, alterations must remain within the
scope of those approved documents.
2.14.3 Extension of Time for Alterations
If alterations/additions increase the cost of work, the time for completion shall be
proportionately extended.
The Engineer-in-Charge’s certificate on such proportionate extension is final and binding.
2.15 Clause 15 Suspension of Work and related matter
2.15.1 A. Suspension or Stoppage of Work
If at any time after the execution of the contract documents, the Engineer-in-Charge shall
for any reason whatsoever, require the whole or any part of the work as specified in the
tender, to be stopped for any period or shall not require the whole or part of the work to be
carried out at all or to be carried out by the Contractor, he shall give notice in writing of the
fact, to the Contractor who shall thereupon suspend or stop, the work totally or partially, as
the case may be.
In any such case, except as provided herein under, the contractor shall have no claim to any
payment or compensation whatsoever on account of any profit or advantage which he might
have derived from the execution of the work in full but which he did not so derive in
consequence of the full amount of the work nor having been carried out, or on account of
any loss that he may be put to on account of materials purchased or agreed to be purchased,
or for unemployment of labour recruited by him.
He shall not also have any claim for compensation by reason of any alteration having been
made in the original specifications, drawings, designs and instructions may involve any
curtailment of the work as originals contemplated.
Where which however, materials have already been purchased or agreed to be purchased
by the contractor, before receipt by him of the said notice, the contractor shall be paid from
such materials at the rate determined by the Engineer-in-Charge, whose decision shall be
ACE/Workshop11/2026-27 SITC_Equipments
B. Delay in Supply of Materials by Municipal Corporation
2.16 Clause 16 Contractor’s Responsibility for Setting out and Accuracy of Work
2.17 Clause 17 Protection of Work from Weather Deleted
2.18 Clause 18 Submission of sample Material ( If required)
2.18.1 Samples of each class of material and workmanship shall be submitted by the contractor
for the approval of the Executive Engineer (Workshop)and after such approval these
samples shall be deposited at any place the Executive Engineer (Workshop)may appoint
and contractor shall be required to perform all the works of this contract in accordance with
2.19 Clause 19 Cleaning and Removal of Rubbish after work completion
2.19.1 On completion all work must be cleaned down; rubbish removed and the works and land
cleaned of rubbish; surplus materials and other accumulations, and everything left in a clean
and ordinary condition.
2.20 Clause 20 Provision of Sheds and Temporary Buildings Considered as deleted
2.21 Clause 21 Contractor's Responsibility for onsite work and for all the supplied item
from third party
2.22 Clause 22 Deleted
2.23 Clause 23 Compensation claim must be in written form
2.23.1 Under no circumstances whatsoever shall the contractor be entitled to any compensation
from the Municipal Corporation on any account unless the contractor shall have submitted
a claim in writing to the Engineer-in-Charge within one month of cause of such claim
2.24 Clause 24 Defective Work, Inferior Materials, and Contractor’s Liability during
Defects Liability Period
ACE/Workshop11/2026-27 SITC_Equipments
2.24.1 Before the security deposit is refunded, if the Engineer-in-Charge (or his subordinate) finds
Work has been executed with unsound, imperfect, or unskilled workmanship, or
Materials used are of inferior quality or not as per contract,
He may notify the Contractor in writing.
2.24.2 Even if such work/materials were previously passed, certified, and paid for, the Contractor
must, at his own cost:
Rectify or reconstruct the defective work, or
Remove inferior materials and provide proper replacements.
2.24.3 If the Contractor fails to do so within the time specified:
He is liable to pay compensation at 1% of the estimated amount per day (up to
10 days) of delay.
After this, the Engineer-in-Charge may rectify or replace the defective
work/materials at the Contractor’s risk and expense.
If the Engineer-in-Charge decides that the defective work/materials may still be
accepted, he may do so at reduced rates and penalties as determined by the
2.24.4 The Contractor remains liable for defects during the Defects Liability Period stated in the
tender, counted from the date of final completion and handing over of the work.
2.25 Clause 25 Inspection and Supervision of Works per 1.46 i.e. IT-46
2.26 Clause 26 Notice before Covering or Concealing (IF Applicable and/or required by
2.26.1 In respect of works which are likely to be embedded or covered up by the other works, the
Contractor shall inform well in advance about these works for carrying out technical
inspection, measurement, duly signed, by the Engineer-in-Charge before letting such part
of the works, be embedded, covered or back filled.
2.27 Clause 27 Bidder's responsibility for fixing any damage to property caused during
execution or appearing within the defect liability period
2.27.1 If the Contractor or his workmen; or servants shall break, deface injure or destroy any part
of a building in which they may be working, or any building, road, fence enclosure or grass
land or cultivated ground continuous to the premises on which the work of any part thereof
ACE/Workshop11/2026-27 SITC_Equipments
is being executed, or if any damage shall be done to the work for any cause whatever while
it is in progress of if any imperfection becomes apparent in it within the Defect liability
period mentioned above by the Engineer-in-Charge the contractor shall make good the
same at his own expense, or in default the Engineer-in-Charge may cause the same to be
made good by other workmen and deduct the expenses (of which certificate of the
Engineer-in-Charge shall be final) from any sum that may be due or thereafter becomes
due to the contractor, or from his security deposit or the proceeds of sale thereof or of a
sufficient portion thereof.
2.28 Clause 28 Contractor's responsibility regarding Self-supply everything needed for
work & safety, assist SMC in inspection without extra charge, and ensure public
2.29 Clause 29 Drinking Water Arrangement Deleted
2.30 Clause 30 Compensation for all damages to property (even unintentional) and bearing
of legal liabilities for third-party injuries
2.30.1 Compensation for all damage done intentionally or unintentionally or by the Contractor's
laborers whether in or beyond the limits of the Municipal Property shall be estimated by
the Engineer-in-Charge or such other office as he may appoint and estimates of the
Engineer-in-Charge subject to the decision of the Commissioner on appeal be final and the
contractor shall be bound to pay the amount of the assessed compensation on demand
failing which the same will be recovered from the Contractor as damage from the security
deposit or deducted by the Engineer-in-Charge from any sum that may be due or become
due from the Municipal Corporation to the contractor under this contract of otherwise.
2.30.2 The contractor shall bear the expenses of defending any action or other legal proceedings
that may be brought by any person from injury sustained by him owing to negligence of
precautions to prevent the spread of fire and he shall also pay any damages and cost that
may be awarded by the court in consequence.
2.31 Clause 31 Restriction on Work During Sundays and Holidays Deleted
ACE/Workshop11/2026-27 SITC_Equipments
2.32 Clause 32 Termination of Contract for Assignment, Insolvency, or Corrupt Practices
2.32.1 The Contract shall not be assigned or sublet without the prior written approval of the
Engineer-in-Charge.
If the Contractor:
Assigns or attempts to assign/sublet the contract without approval, or
Becomes insolvent or commences insolvency proceedings, or
Makes any composition with creditors,
then the Engineer-in-Charge may, by written notice, rescind the contract.
2.32.2 Similarly, if the Contractor or his agents/servants:
Offer, promise, or give any bribe, gift, gratuity, loan, reward, or advantage
(pecuniary or otherwise) to any Municipal Corporation employee, or
If such an employee becomes directly or indirectly interested in the contract,
The Engineer-in-Charge may, by written notice, rescind the contract.
2.32.3 Upon such rescission:
The Contractor’s security deposit shall be forfeited to the Municipal Corporation.
The contract shall be deemed rescinded as under Clause
The Contractor shall have no claim for payment for any work already executed.
2.33 Clause 33 Contractor’s liability for compensation is fixed and enforceable, irrespective
of whether SMC suffers actual loss
2.33.1 All sums payable by a contractor by way of compensation under any of these conditions
shall be considered as reasonable compensation to be applied to the use of the Municipal
Corporation without reference to the actual loss or damage sustained and whether any
damage has or has not been sustained.
2.34 Clause 34 Intimation of Firm Reconstitution
2.34.1 In the case of a tender by partners any change in the constitution of a firm shall be forthwith
notified by the contractor to the Engineer-in-Charge for his information.
2.35 Clause 35 Direction of Work
2.35.1 All works to be executed under the contract shall be executed under the directions and
subject to the approval in all respects of the Executive Engineer (Workshop) who shall be
ACE/Workshop11/2026-27 SITC_Equipments
entitled to direct at what point or points and in what manner they are to be commenced and
from time to time carried on.
2.36 Clause 36 Commissioner's authority regarding decision
2.36.1 Scope of Authority
The Commissioner’s decision is final, conclusive, and binding on all parties
Interpretation of specifications, drawings, designs, and instructions.
Quality of workmanship and materials used.
Any question, claim, right, matter, or issue related to the contract.
2.36.2 When it applies
During progress of the work.
After completion of the work.
Even in case of abandonment of the work.
The Commissioner acts as the final deciding authority in disputes or interpretations unless
otherwise specified in the contract.
2.37 Clause 37 Payment for Lump-Sum Items Deleted
2.38 Clause 38 Execution of Work without Specified Specifications on instruction of EIC
2.38.1 If any specifications dose not exists for any work/ item, the work shall be carried out
entirely in accordance with the instructions and requirements of the Engineer-in-Charge
2.39 Clause 39 Definition of “Work(s)”
2.39.1 The expression " Works " or " Work " where used in these conditions shall, unless there be
something in the subject or context repugnant to such construction be construed to mean
the work or works the contacted to be executed under or in virtue of the contract, whether
temporary or permanent and whether original, altered, substituted or additional.
2.40 Clause 40 Deleted
2.41 Clause 41 Labor Laws Compliance, Workmen’s Compensation, and Site Safety (If
applicable or / and asked by SMC)
ACE/Workshop11/2026-27 SITC_Equipments
2.41.5 During the execution of the work, the contractor should properly cover up and protect the
machinery/steel liable to damage or deterioration by exposure to the weather and should
also take every precaution against damage to the machineries/steel from any cause.
2.42 Clause 42 Variation in Quantities
2.42.1 Quantities shown in the tender are approximate and no claim shall be entertained for
quantities of work executed being either more or less than those entered in the tender of
2.43 Clause 43 Deleted
2.44 Clause 44 Deleted
2.45 Clause 45 Commencement of work only after instruction from EIC
2.46 Clause 46 Prohibition of Child Labour, Use of Animals, and Fair Wages Deleted
2.47 Clause 47 Mode of Payment to Contractor for amount below Rs 10 Deleted
2.48 Clause 48 Acceptance of Conditions Mandatory for Tendering
2.48.1 Any contractor who does not accept these conditions shall not be allowed to tender for
2.49 Clause 49 Clause Headings are for Reference Only Deleted
2.50 Clause 50 Settlement of Disputes and Jurisdiction
2.50.1 Disputes if any, shall be discussed and mutually settled and in case of disagreement the
same shall be referred to Commissioner / Standing Committee. After referring to
Commissioner / Standing Committee if the said dispute is not solved, the same be referred
to the court subject to Surat jurisdiction only.
2.51 Clause 51 Security Deposit Adjustments and Administrative Recoveries
ACE/Workshop11/2026-27 SITC_Equipments
2.51.1 Refund of Security Deposit in Case of Reduced Work
If the total amount of work executed is 5% less than the contract value, a proportionate
If the total amount of work executed is 5% less than the contract value, a proportionate
refund of Security Deposit (S.D.) may be made to the Contractor at the time of releasing
the final bill.
In short, the S.D. retained by the Corporation after payment of the final bill shall be equal
to 2% of the final bill amount, as per prevailing norms or as revised from time to time.
2.51.2 Additional Security Deposit for Excess Work
If the amount of work executed exceeds 5% of the contract value, additional S.D. shall
be recovered from the running bills.
Such recovery shall be rounded off to the nearest ₹1,000, and the excess value of work
beyond 5% shall be rounded to the nearest ₹25,000.
2.51.3 For works amounting to ₹5 lacs or more, such additional S.D. shall be recovered at the
rate of 4% of the additional amount.
2.51.4 Recovery of Advertisement and Administrative Charges
In cases where the Contractor abandons the work midway and the Corporation has to re-
tender the remaining work under Clause 3, a fixed recovery of ₹1,000 shall be made from
the original Contractor towards advertisement and administrative expenses.
If a separate advertisement is issued for a single work, the actual cost of advertisement shall
This recovery shall be in addition to any recoveries under Clause 3 or other relevant
clauses of the contract.
2.52 Clause 52 Deleted
2.53 Clause 53 Deleted
2.54 Clause 54 Deleted
2.55 Clause 55 Alterations in Tender Documents
2.55.1 No alteration in the form of tender and in schedule of quantities and no additions in the
shape of special stipulation will be permitted. Tender which do not fulfill all or any of the
above conditions or are incomplete in any respect are liable to be rejected.
ACE/Workshop11/2026-27 SITC_Equipments
2.56 Clause 56 Deleted
2.57 Clause 57 Deleted
2.58 Clause 58 Deleted
2.59 Clause 59 Deleted
2.60 Clause 60 As per time limit clause
2.61 Clause 61 Deleted.
2.62 Clause 62 Rate for Extra Items Deleted.
2.63 Clause 63 Penalty for delay in execution as per IT-23
2.64 Clause 64 Claim for damage compensation for Variation in Quantities
2.64.1 No claim for any extra or compensation for damage will be entertained on account of such
variation, except where the quantity is increased by more than 30%.
2.64.2 No claim for any extra or compensation for damage will be entertained on account of such
variation where the quantity is decreased to any percentage or where the item is totally
2.65 Clause 65 Deleted
2.66 Clause 66 Deleted
2.67 Clause 67 Final Bill Payment and Comparison with Second Lowest Tenderer's Rate
(If Applicable)
2.68 Clause 68 Information to be Submitted with Tender as per IT-05 and IT-06
2.69 Clause 69 Acceptance of tender: as per 3.4 of this tender
ACE/Workshop11/2026-27 SITC_Equipments
2.70 Clause 70 Disqualification: As per IT-29 and as per IT-11 (1.11.5)
2.71 Clause 71 Deleted.
2.72 Clause 72 Point of Contact for tender discrepancy discussion
2.72.1 In case of any discrepancy with tender documents the contractor may contact the Executive
Engineer, Surat Municipal Corporation.
2.73 Clause 73 Foreign Exchange for Procurement of Plant and Machinery Deleted
2.74 Clause 74 Storage and Security of Materials at Worksite Deleted
2.75 Clause 75 Binding Nature of Accepted Tender
2.75.1 Tender once accepted shall be binding on the contractor even if the formal agreement is not
2.76 Clause 76 Withdrawal of Tender as mentioned in 1.11.6, 1.12 and
2.77 Clause 77 Surety
2.77.1 The successful tender may be required to furnish surety of 10% of the contract value on
stamp paper if so desired by the Commissioner.
2.78 Clause 78 Deleted
2.79 Clause 79 Deleted
2.80 Clause 80 Deleted
2.81 Clause 81 Deleted
2.82 Clause 82 Termination of Contract Due to Inferior Quality Work
2.82.1 If the work executed is found to be of inferior quality or of any substandard quality not
confirming to the specifications at any point of time during the inspection of by Engineer-
in-charge or any higher Authority, the contract may be terminated without assigning any
reasons thereof and no payment shall be made towards the probable damages or loss caused
to the contractor and materials purchased by him for this work and no compensation
whatsoever either shall be paid to contractor by Municipal Corporation.
ACE/Workshop11/2026-27 SITC_Equipments
2.83 Clause 83 Deleted
2.84 Clause 84 Conditional Tender and Its rejection
2.84.1 The contractor should note that the conditional tenders shall be out rightly rejected.
2.85 Clause 85 Deduction of tax / TDS as per prevailing government rules
2.85.1 Out of the amount payable/creditable to contractor’s account, the Central Government/State
Government tax/taxes shall be deducted at source in accordance with the relevant
laws/rules from time to time prevailing.
2.86 Clause 86 Deleted
2.87 Clause 87 Deleted
2.88 Clause 88 Deleted
2.89 Clause 89 Deleted
2.90 Clause 90 Deleted
2.91 Clause 91 Approvals from External Authorities/ Bodies Deleted
2.92 Clause 92. Termination/determination of the contract
2.92.1 In any case, under any Clause/s of this tender, the contractor has rendered itself liable to
pay compensation if a breach of any of the terms, conditions, specifications, etc. The SMC
shall have power
2.92.2 If work is found unsatisfactory by Surat Municipal Corporation (SMC), SMC shall
terminate the contract after giving notice period of 15 days and in this case decision of
competent authority, for forfeiture of SD / EMD etc and debarring / blacklisting the agency
shall be binding to the contractor.
If SMC is intended to reduce/shorten/end of the running contract, then SMC is entitled to
do so after giving notice period of 45 days and in this case decision of competent authority
of Corporation will be binding to contractor and No Compensation shall be paid for
2.92.3 This activity is under essential service, so contractor is not allowed to stop this work at any
2.92.4 Notwithstanding, if contractor stop / leave the work by his own discretion SD / EMD,
Amount pending in running bill etc. shall be forfeited and additional expenditure for
ACE/Workshop11/2026-27 SITC_Equipments
execution of remaining work shall be recovered through, if be needed, legal proceeding and
Agency shall be debarred / blacklisted subject to approval of competent authority.
2.92.5 To terminate the contract of which a notice in writing to the Contractor by the SMC shall
be conclusive and binding in which case the security deposit of the contractor shall stand
forfeited, at the absolute disposal of the SMC.
2.92.6 To take such part of the work as shall be un-executed and to give it to another/other
contractor to complete, in which case the expenses incurred, if any, in excess of the sum
which would have been paid to the original contractor, if the whole work had been executed
by him (the certificate of SMC for the excess amount shall be final and conclusive) shall
be borne and paid by the original contractor and may be deducted from any money due to
him by the SMC under the contract or otherwise or from the security deposit or the proceeds
of sale thereof, or a sufficient part thereof.
2.92.7 In the event of any of the above courses being adopted by the SMC, the Contractor shall
have no claim for compensation for any loss sustained by him by the reason of having
purchased or procured any materials, or entered into any engagements, or made any
advances on account of, or with a view to the execution of the work or the performance of
the contract. And in case the contract shall be terminated under the provisions aforesaid,
the contractor shall not be entitled to recover or be paid any sum for any work thereof or
actually performed under this contract, unless and until SMC certifies in writing the
performance of such work and the value payable in respect thereof, and the contractor shall
only be entitled to be paid the value as certified by the SMC.
2.92.8 Refer Clause 2.3.1
2.92.9 Refer Clause 2.3.2
2.92.10Refer Clause 2.3.3
2.92.11Refer Clause 2.3.4
2.92.12Refer Clause 2.3.5
2.92.13In any case in which any of the powers conferred upon the Commissioner shall have
become exercisable and the same shall not have been exercised the non-exercise thereof
shall not constitute a waiver of any of the conditions hereof such powers shall not
withstanding be exercisable in any future case default by the Contractor for which by any
clauses hereof he is declared liable to pay compensation amounting to the whole of his
ACE/Workshop11/2026-27 SITC_Equipments
security deposit and the liability of the contractor for past and future compensation shall
remain unaffected.
2.92.14Refer Clause 2.5.2
2.92.15Refer Clause 2.5.3
2.92.16The Contract shall not be assigned or subject without the written approval of the Engineer-
in-Charge, and if the Contractor shall assign or subject his contract or attempt to do so, or
become insolvent or commence any proceedings to be adjudicated any insolvent or make
any composition with his creditors, or attempts or attempt to do the Engineer-in-Charge
may, by notice in writing rescind the contract. Also if any bribe, gratuity gift, load,
perquisite, reward or advantage, pecuniary or otherwise, shall either directly or indirectly
be given, promised, or offered by the contractor, or any of his servants or agents to any
public officer or person in the employ of the Municipal Corporation in any way relating to
his office or employment, or if any such officer or person shall become in any way directly
or indirectly interested in the contract the Commissioner may by notice in writing rescind
the contract. In the event of contract being rescinded, the security deposit of the contractor
shall thereupon stand forfeited and be absolutely at the deposit of the Municipal
Corporation and the same consequences shall ensure as if the contract had been rescinded
as per above clauses here of and in addition the contractor shall not be entitled to recover
or be paid or be paid for any work thereto for, actually performed under the contact.
Executive Engineer
Municipal Workshop
Surat Municipal Corporation
Seal and Signature of Bidder
ACE/Workshop11/2026-27 SITC_Equipments
SURAT MUNICIPAL CORPORATION
MUNICIPAL WORKSHOP
3 General Terms and Conditions
3.1 General Condition
3.1.2 The tenderer must obtain himself on his own responsibility and at his own expense all the
information which may be necessary for the purpose of filling this tender and for entering
into a contract for the execution of the work from the office of the Executive Engineer
(Workshop), Surat Municipal Corporation, Surat, during the office hours between 11:00
A.M. to 6:00 P.M. on weekdays except Sunday & holidays and examine the drawing and
inspect site of the work and acquaint himself with all local conditions and matters
pertaining thereto.
3.1.4 If any prospective tenderer be in doubt as to the interpretation of any part of the tender
document or any discrepancy with tender documents, the SMC or his nominated officer
shall Endeavour to answer written enquiries prior to tenders being submitted.
3.1.5 Tenderer shall mail their queries on line about the contents of this document on or before
date mentioned in Important Information of Tender.
3.1.6 Addenda and Corrigendum, if any after this date, shall be uploaded on n-procure/website
by the SMC. All Addenda Corrigendum issued by the SMC shall become a part of the
tender document. Tenderer shall have to submit the signed addenda and corrigendum with
other required documents of tender.
3.1.9 For the imported portion if any, tenderer shall quote in Indian Rupees by converting the
exchange rate and its fluctuation, if any during the contract period
3.1.12 As per IT-20
3.1.14 As per IT-29 and as per IT-11 (1.11.5)
3.1.16 The SMC is not bound to either accept the lowest or any tender, in its sole discretion. In
case of rejection of all or any tender or scrapping of the entire invitation to bid, none of the
tenders shall be entitled to claim any loses, cost, compensation or damages, which they may
ACE/Workshop11/2026-27 SITC_Equipments
have incurred as a result of participating in the tender. The Municipal Corporation shall
have the right of rejecting all or any of the tender without assigning any reasons.
3.1.17 The successful tenderer, in whose favor a letter of work order, has been issued by the SMC
will be required to execute a formal contract and until such execution, the successful
tender’s bid together with the letter of work order issued by the SMC shall form a binding
agreement in terms of the tender documents
3.2 Opening of tender as per IT-14 (1.14)
3.3 Bid evaluation as per IT-21 (1.21)
3.4 Acceptance of Tender as per
3.5 Termination/determination of the contracts per
3.6 Non-Waiver of Powers and Right to Take Possession of Contractor’s Assets as
mentioned earlier Refer 2.5.2
3.7 Time Extension
3.7.1 Provided nevertheless if in the opinion of SMC, the contractor is entitled to any extension
of time on account of the works being altered, varied or added or delay by the reason of
any inclement weather or due to the reasons not under the control of the contractor, the
SMC is empowered to order in writing for the extension of the aforesaid period for final
completion, by such period(s) as it deems reasonable and the contractor shall complete the
works within such extended period(s).
3.7.2 However, the contractor shall not be entitled to any extension of the period unless requested
in writing for such extension for event, which the contractor considers to entitle for
requesting for any extension, to Engineer-in-Charge, SMC.
3.7.3 The SMC may in its absolute discretion, dispense with such notice and allow an extension
of time. Nevertheless, in case of any extension of time, the aforesaid provisions for damages
and compensation shall apply in case of non-completion of the works within the extended
3.7.4 Such time extension shall not become any base for compensation for contractor under any
circumstances what so ever.
ACE/Workshop11/2026-27 SITC_Equipments
3.7.5 Co-Ordination of Work
3.8 Terms of Payment as per IT-26 and IT-30
3.9 Work Completion Certificate
3.9.1 The Work shall be deemed to have been completed in all respects on the day SMC certifies
that the Works have been completed in accordance with the Contract and issues a
Certificate to that effect.
3.9.2 The stage of work completion shall mean, the work completed by contractor with all respect
and according to terms, conditions and specifications of tender.
3.10 Final Payment as per
3.11 Guarantee of works and liability for damages, defects etc as per
3.14 Work to be executed in accordance with specifications, drawings and orders of SMC
3.14.1 The Contractor shall execute the entire work in the most productive, professional and
prudent manner both as regards usage of materials and time in every respect in strict
accordance with the approved design, specifications, drawings, etc.
3.14.3 All works under the contract shall be executed under the directions and subject to the
approval in all respects of the SMC which shall for time to time direct at what point(s) and
in what manner the works to commence and carried on.
3.15 Action in case work not done as per specifications
3.15.1 All works in the course of execution or executed in pursuance of the contract shall, at all
times, be open and accessible to the inspection and supervision of the SMC or its authorized
representative and the contractor shall, at all times, during the usual working hours and at
all other times at which reasonable notice of the visit of such representatives has been given
to the contractor, either himself be present to receive orders and instructions or has a
responsible agent duly accredited in writing, present for that purpose. Orders given to such
ACE/Workshop11/2026-27 SITC_Equipments
agent shall be considered to have the same force as if they had been given to the Contractor
3.15.2 If at any time, it appears to the SMC or its authorized representative that any work has been
executed with unsound, imperfect, or unskillful manner, or with inferior or grade of
materials or articles or otherwise not in accordance with the contract for the execution of
the work, the contractor shall, on demand in writing, which shall be made within the Project
Completion Period from the SMC specifying such work, materials or articles,
notwithstanding that the same may have been passed, certified and paid for forthwith
rectify, or remove and reconstruct the work so specified in whole or in part, as the case may
be, and remove the materials or articles so specified and provide materials or articles as
per the terms and in accordance with the spirit of the contract, at its own expense and cost.
In the event of the Contractor failing to do so within a period specified by the SMC in its
demand as aforesaid, the Contractor shall be liable to pay compensation at the same rate as
for non-completion of the work in time for the default on its past.
3.15.3 In such case the SMC may at its sole discretion, accept the item of work at reduced rates as
applicable under the contract during the preparation of on account bills or final bill. Further,
if the item is so acceptable, without detriment to the safety and utility of the item and the
structure the SMC may reject the work outright without any payment and/or get it other
connected and incidental items rectified, or removed and re-executed at the risk and cost of
the contractor. The decision of SMC to be conveyed in writing in respect of the same will
be final and binding on the Contractor.
3.17 Statutory and other obligations regarding workmen
3.18 Force closure of contract or abandonment due to reduction in the scope of work
3.18.1 If, at any time after the commencement of work, the SMC, for any reason whatsoever, does
not require the whole work as specified in the tender to be carried out, the SMC or its
authorized representative shall give a notice in writing, to that effect to the Contractor and
the Contractor shall have no claim to any payment or compensation whatsoever on account
of any profit or advantage which he might have derived from the execution of the works in
full but could not derive in consequence of such decision of the SMC.
ACE/Workshop11/2026-27 SITC_Equipments
3.18.2 He shall have no claim for the compensation by reason of any alteration having been made
in the original specifications, drawings and instructions which may involve any curtailment,
variation or increase of the work as originally contemplated.
3.19 Temporary suspension of works
3.19.1 If the work should be suspended by the reason of rain, strike, lock outs, or other causes, the
Contractor shall take all necessary precautions for the protection of the Works and shall at
his own cost and expense make good any damage arising from any of these causes. No
claim in this regard shall be entertained.
3.20 Ambiguities or discrepancies in drawings and specifications
3.20.1 The Contractor shall from time to time check all Drawings and Specifications and shall
promptly notify the Engineer-in-Charge of any omission or discrepancies therein. In case
of ambiguities or discrepancies in Drawings, Specifications or Schedule of Quantities and
Rates/Prices or any of them, the same shall be referred to the SMC in writing, and the
decision of SMC shall be final and binding on the Contractor.
3.21 Guarantee of works and liability for damages, defects etc.
3.21.1 The Contractor shall guarantee that the equipment or parts thereof provided under the
contract are new and free from defects in design, material and workmanship. The contractor
shall also give guarantee for the satisfactory performance of the equipment or parts thereof
provided under the contract and for the workmanship of the works executed as per the
contract. This guarantee shall be valid for the at least duration of the defect liability period.
3.21.2 Any defects, that may appear in the work within the defect liability period, which in the
opinion of SMC or the Engineer-in-Charge is due to defective or improper equipment or
bad workmanship or the work not being in accordance with the drawings, specifications or
instructions under the contract shall be made good and/or repairs by the Contractor at his
own cost and expense.
3.21.3 If it is found that the performance of the equipment or parts thereof are not satisfactory and
that any defect in design, material and/or workmanship is found within the defect liability
period, the Engineer-in-Charge shall intimate to the Contractor to that defect in writing.
The Contractor shall immediately but not later than 7 days of the receipt of such
intimation investigate the causes of such defects. The Contractor shall arrange to provide
within a reasonable period all the necessary Engineering designs, materials for the
rectification/replacement of the defective equipment or parts thereof at site at his own cost
ACE/Workshop11/2026-27 SITC_Equipments
and expense. If the Contractor fails to take proper corrective action to repair the defects or
otherwise to replace the equipment or parts thereof to the satisfaction of the Engineer-in-
Charge within a reasonable period, the SMC may at its option after giving 15 days’ notice
in writing, take suitable action for such rectification or replacement, as it deems necessary,
at the risk and cost of the Contractor.
3.21.4 In the event of an emergency in the opinion of the Engineer-in-Charge, where the delay
would cause serious loss or damage or in the cases of minor defects found in the designs,
materials and/or workmanship, within the defect liability period, the SMC shall however,
have a sole right to take up immediately, suitable corrective action for repair or rectification
or replacement as deemed necessary, through a third party chosen by the SMC without any
advance intimation to the Contractor. In such cases, the Contractor shall be intimated and
shall assist and cooperate in making the repairs/rectification.
3.21.5 In case the defects are of such nature that the equipment or parts thereof requires to be taken
to the workshop of the Contractor for rectification, the same shall be taken by the Contractor
at his cost and expense. In case the Contractor so desires the same shall be so dispatched at
the risk and cost of the Contractor. However, in both cases, the Contractor shall furnish
necessary Hypothecation Deed to the Engineer-in-Charge in respect of such equipment or
part thereof, and shall provide additional bank guarantee of amount equal to the cost of
equipment, as required by the Engineer-in-Charge before the equipment, or parts thereof
are removed from the site. After the necessary rectification or replacement, the Contractor
shall deliver and duly install the equipment or parts thereof at site at his own expense to the
satisfaction of the Engineer-in-Charge. All risks in transit to and from the site shall be borne
by the Contractor.
3.21.6 If the repairs, replacement or modifications as referred above are of such nature as may
affect the efficiency of the equipment or parts thereof, the SMC shall have the right to give
to the Contractor a notice in writing within one month of such repair, replacement, renewal
to carry out the tests, as may be required, for the acceptance of the equipment by the
Engineer–in Charge.
3.21.7 When the defective equipment or parts thereof are not repairable at site and sent to the
workshop of the Contractor for necessary repairs or replacement but are essential for the
operation of the facility, the Contractor shall take all the necessary steps to the satisfaction
ACE/Workshop11/2026-27 SITC_Equipments
of the Engineer-in-Charge to minimize interruptions in the operation of the facility till such
time the repaired equipment or parts thereof are returned back satisfactorily.
3.21.8 Equipment or parts thereof so repaired or replaced shall have further defect liability period
as of original from the date of acceptance, of such repair or replacement, by the Engineer-
in-Charge and the contractor shall immediately arrange to extend the validity of the
respective Bank Guarantee to adequately cover the extended period. Failing to supply the
repaired equipment with the mutually agreed time period, the bank guarantee shall be
forfeited to SMC and the equipment will be replaced by SMC at risk and cost of contractor.
3.22 Equipment needed for the works
3.22.1 The Contractor shall, at his own cost and expense, provide all the equipment, machineries,
tools etc. required for the works.
3.23 SAFETY REGULATIONS
3.24 Removal of site staff on the direction of the engineer-in-charge
3.25 Changes in Firm's Constitution: -
Where the Contractor is a partnership firm/ private/public organization, a prior
approval in writing from the SMC shall be obtained for any change in the constitution
of the firm. Where the Contractor is an individual or a Hindu undivided family, such
approval as aforesaid, shall likewise be obtained before the contractor enters into any
partnership agreement where under the partnership firm would acquire the right to
carry out the business of the Contractor.
If such prior approval is not obtained, the contract shall be deemed to have been
assigned in contravention of clause mentioned elsewhere in the tender, for the work
hereof and the same action may be taken, and the same consequences shall ensure as
provided in the said Clause.
ACE/Workshop11/2026-27 SITC_Equipments
3.26 Decisions by the SMC and engineer-in-charge
3.26.1 It shall be accepted, like as an inseparable part of the Contract, that in matters quality of
materials, workmanship, removal of improper work, interpretation of Contract, drawings
and specifications, mode or procedure of carrying out the work, the decision of the SMC
shall be final and binding on the Contractor and for any technical question which may arise
touching the Contract, the SMC or Engineer-in-Charge decision shall be final and
3.27 Patents, rights and royalties
3.27.1 The Contractor shall fully indemnify the SMC and their all agents, servants and employees
of the SMC against any action, claim or proceedings relating to infringement or use of any
patent or design or any alleged patent or design rights and shall pay the royalties or other
charges which may be payable in respect of any article or part thereof included in the
Contract. In the event of any claim being made or action being brought against the SMC or
any agent, servant or employee in respect of any of the matters aforesaid, the Contractor
shall be notified thereof for taking necessary action at its cost and expense.
3.28 Right of Surat municipal corporation to cause audit of the account of contractor and
technical examination of the work
3.28.1 The SMC shall have the right to cause an audit and technical examination of the works and
the final bills of the contractor including all supporting vouchers, abstract, etc., to be made
after payment of the final bill and if as a result of such audit and technical examination any
sum is found to have been overpaid in respect of any work done by the Contractor under
the Contract or found not to have been executed, the Contractor shall be liable to refund
the amount of over-payment and it shall be lawful for the SMC to recover the same from
the Contractor in the manner prescribed or in any other manner legally permissible; and if
it is found that the Contractor was paid less than what was due to it under the Contract in
respect of any work duly executed by the Contractor, the amount of such under payment
shall be duly paid by the SMC to the Contractor, without any interest thereon whatsoever.
3.29 Superintendence of Work by The Contractor, Supervision, Technical Staff, Employees
ACE/Workshop11/2026-27 SITC_Equipments
3.32 Apprentices act provisions to be complied
3.32.1 Obligations of Contractor under Labor and Employment Laws
3.34 Contractor’s site office & amenities
3.35 Identification badges/passes
3.36 WATCHING AND LIGHTING
3.37 Compliance With Local Laws, Etc.
3.38 MATERIALS OBTAINED FROM EXCAVATION/DISMANTLING
3.39 INDEMNITY AND INSURANCE
3.39.2 TRANSIT INSURANCE
The Contractor shall arrange at his cost for transit insurance for the dispatch of equipment
or parts thereof.
ACE/Workshop11/2026-27 SITC_Equipments
3.46 WORKMANSHIP
3.46.1 The work to be done under the contract or any part thereof shall be executed in the best and
most skilled workmanship like manner, with best and approved quality of equipment and
both the work and the equipment should conform to the particulars contained in or implied
by the specifications and as referred to in the drawings or in such other additional directions,
instructions and documents as may be found necessary and given time to time to the
contractor during the execution of the works and to the entire satisfaction of the SMC and
the Engineer-in-Charge.
3.46.2 The entire work shall conform to the latest and acceptable engineering practices and shall
be such as to cause minimum transfer of noise and vibration to the building structures.
3.47 Removal of Improper Work and Equipment
3.47.1 The SMC shall have power to check and reject at any stage such work / equipment which
it considers to be defective in quality or workmanship and nothing shall prevent from
rejecting the materials brought to the site (i.e. materials made ready for use on works) which
have been previously passed by the SMC or the Engineer-in-charge in an un-worked
condition. The Contractor shall immediately arrange to replace the defective equipment by
proper and suitable equipment with the approval of the Engineer-in-Charge and carry out
rework of the rejected work at his own cost and expense and to the satisfaction of the SMC.
In the event of failure on the part of the Contractor to carry out his obligations under this
clause, the SMC shall have the right to get the work done through other agencies at the risk
of the Contractor and recover the cost in full from the Contractor.
3.47.2 All rejected equipment will at once be removed from the site by the Contractor to such
distances as may be desired, failing which the Engineer-in-Charge after giving three days’
notice in writing may do so and recommend to the SMC for recovering the cost of removal
from the Contractor.
ACE/Workshop11/2026-27 SITC_Equipments
3.49 Variation in scope of work
3.49.1 The SMC shall have the power to make any alterations/variations/ deletions/additions or
substitutions from drawings, specifications, designs and instructions that may appear in its
opinion, be necessary or advisable during the progress of the Works and the Contractor
shall be bound to carry out the work in accordance with the instructions which may be
given to him by the SMC in writing. Such alterations / deletions / additions or substitutions
shall form part of and be read as incorporated in the Agreement itself.
3.50 Clearance of site on completion deleted
3.51 Extra work
3.51.1 Work that is not included in the tender documents shall not be performed, except when
approved /sanctioned in writing by S.M.C.
3.51.2 Rates for additions or extras
Rate for extra items will be carried out as per prevailing rates in the following sequences
(1) Available last Sanctioned rate, (2) Market Rate.
3.51.3 No claim for any extra or compensation for damage will be entertained on account of such
variation where the quantity is decreased to any percentage or where the item is totally
3.52 Extent of deviation or variation
3.52.1 The Contractor is not to vary / deviate from the approved scheme, its drawings and
specifications or instructions or execute any extra work of any kind whatsoever unless upon
an order in writing is given by the SMC in this regard. If compliance with the SMC’s
aforesaid order or approval involves extra work, and/or expense beyond that involved in
the execution of the works as per contract, then unless the same were issued in consequence
of some breach of this contract on the part of the Contractor, the latter shall be paid the
price of the said work (to be valued as hereinafter provided) and/or the expense aforesaid.
3.53 Modification to contract
3.53.1 There are no other understandings between the parties other than this Contract Document.
3.53.2 In the event of any of the provisions of the Contract require modifications after the Contract
Documents have been signed, except those directions and orders given by the SMC under
ACE/Workshop11/2026-27 SITC_Equipments
the Contract for the due execution of the works, the modifications shall be made in writing
and signed by both the parties before giving effect to such modifications.
3.53.3 SMC may have extended rate contract duration/ tenure, if required, after consent from
3.54 Commencement of works
3.54.1 The Contractor, having signed the Contract with the SMC, shall commence the work within
the period stipulated in the document.
3.54.3 If the Contractor commits default in commencing the execution of the work as aforesaid,
the SMC shall, without prejudice to any other right or remedy, be at liberty to forfeit the
Earnest Money Deposit absolutely.
3.55.1 Warranty for Equipment
With respect to the equipment provided by the contractor under this contract, the contractor
shall be deemed to have furnished to the SMC.
“The Contractor warrants that the equipment are not subject to any security interest, lien or
other encumbrance”
Against Patent Infringements
“The Contractor shall at his own expenses defend and save the SMC harmless from the
expenses and consequences of any suit or procedure brought against the user so far as the
said suit or procedure is based on a claim that the equipment provided constitute an
infringement of any patent in existence on the date of the contract”.
“In addition, the Contractor shall secure at his own expense a fully paid up license or license
that will permit the user to continue operation of the equipment provided, free of further
claim for infringement”.
“The Contractor warrants that the equipment provided are suitable for the purpose or the
purposes, for which such goods are used, conform to promise or affirmations made by the
contractor and conform to specifications stipulated in the Contract”.
ACE/Workshop11/2026-27 SITC_Equipments
“The Contractor warrants that the equipment provided are suitable for the particular
purpose stipulated in the contract. The SMC affirm that it has relied on the contract’s skills
and judgments to select or provide equipment for a particular purpose”.
“The Contractor warrants that the equipment are new and of best quality and that the
equipment will be free of defects in design, workmanship or materials”.
3.55.2 Breach of Warranty
3.55.2.1 In the event of a breach of warranty, the contractor shall be required to take all necessary
action at his cost and expense to correct the breach in the most expeditious manner
dictated by the existing circumstances.
3.55.2.2 Deleted
3.56 Maintenance and Defects
The Contractor shall ensure that adequate and prompt response after sales service as and
when required with a view to minimize the breakdown period. Particular attention shall be
given to ensure that all spares are easily available during the normal life of the equipment.
3.57 Rights, Remedies and Powers
3.57.1 Termination of Contract Due to Contractor’s Default
If the Contractor
A. Abandons the work;
B. At any time, defaults in proceeding with the works with due diligence and continue to do
so after a notice in writing of 7 days from the SMC; or
C. Commits default in complying with any of the terms and conditions of the Contract and
does not remedy it or take effective steps to remedy it within 7 days after a notice in writing
is given to him to that effect by the SMC; or
D. Persistently disregards the instructions of the SMC and / or Engineer-in-Charge or
contravenes any provision of the Contract; or
F. Fails to complete the works or items of work on or before the stipulated date(s) of
completion and do not complete them within the period specified in a notice given in
writing to that effect by the SMC; or
G. Offers or gives or agrees to give to any person in the SMC’s service or to any other person
on this behalf, any gift or consideration of any kind as an inducement or reward for doing
ACE/Workshop11/2026-27 SITC_Equipments
or forbearing to do or for having done or forborne to do any act in relation to the obtaining
or execution of this or
I. Shall obtain a Contract with the SMC as a result of non- tendering or other non-bonafide
methods of competitive tendering; or
J. Assigns, transfers, sub-lets (engagement of labour on a piece-work basis or of labour with
materials not to be incorporated in the work, shall not be deemed to be sub-letting) or
attempts to assign, transfer or sub-let the entire works or any portion thereof without the
prior written approval of the SMC:
K. The SMC may, without prejudice to any other right or remedy which shall have accrued or
shall accrue thereafter to the SMC by written notice determine the contract either as a whole
L. Or otherwise specified elsewhere in contract.
3.58 Packing, marking, protection and dispatch of equipment
3.58.1 The Contractor shall be held liable for all damages or breakages to the equipment due to
the defective or insufficient packing as well as for corrosion due to insufficient protections.
3.58.2 The Contractor shall arrange for dispatch of the equipment by rail/road/ship after proper
packing protection. The consignments shall be dispatched after inspection or otherwise, if
agreed to, on freight paid basis, irrespective of the basis of price.
3.59 Contractor to make facilities at site
3.60 Income Tax Deduction
3.60.1 Income Tax on gross amount billed by the Contractor, as per prevailing statutory rules will
be deducted as per Section 194(c) of Income Tax Act.
3.62 Disputes and Jurisdiction
3.62.1 Except where otherwise specified in the contact the decision of the Competent authority
shall be final, conclusive and binding on all parties to the contact upon all questions relating
to the meaning of the terms, conditions, specifications, drawings, designs and instructions
herein-before mentioned and as to the quality of workmanship, or materials used on the
work, or as to any other question, claim, right, matter, or thing whatsoever in any way
arising aloof, or relating to the contract, designs, drawings, specifications, estimates,
instructions, orders or these conditions, or otherwise concerning the works or the execution
ACE/Workshop11/2026-27 SITC_Equipments
or failure to execute the same, whether arising, during the progress of the work or after the
completion or abandonment thereof.
3.62.2 Disputes if any shall be discussed and mutually settled and in case of disagreement the
same shall be referred to Competent authority of Corporation. After referring to Competent
authority of Corporation if the said dispute is not solved, the same shall be referred to the
court subject to Surat jurisdiction only.
3.63 Legal costs
Legal Costs incurred by the SMC in the event of litigation or other legal proceedings arising
from this Contract agreement shall be borne by the contractor.
3.66 Construction Cess (If Applicable).
3.66.1 Construction Cess on Gross amount billed by the contractor, as per prevailing statutory rule
will be deducted as per labour & employment development GR No. CWA/2004/841/M-3,
Dated: 30/01/2006 of Gujarat Government.
Executive Engineer
Municipal Workshop
Surat Municipal Corporation
Seal and Signature of Tenderer/Bidder
ACE/Workshop11/2026-27 SITC_Equipments
SURAT MUNICIPAL CORPORATION
MUNICIPAL WORKSHOP
4 Tender Specific Details: -
4.1 Name of Work: -
Supply, Installation, Testing and Commissioning of Heavy-Duty Equipment and
Machineries at the New Municipal Workshop office of Surat Municipal Corporation.
4.2 Tender Motive & Scope of work: -
The Municipal Workshop of Surat Municipal Corporation (SMC) is presently
operational at Umarwada, near Bombay Market, Surat. Due to various operational
and infrastructural constraints, the Municipal Workshop is being shifted to its newly
constructed premises near Lal Darwaja, Surat.
The Municipal Workshop Department of SMC performs various functions,
including the following:
Procurement of vehicles and machinery in accordance with the requirements raised
by various zones and departments of SMC.
Procurement of specialized vehicles and machinery for specific municipal services,
such as sewer jetting machines, gulper machines and other specialized equipment.
Undertaking preventive maintenance and breakdown repairs of various vehicles and
machinery owned or operated by SMC, either departmentally or through third-party
agencies engaged for the purpose.
For carrying out the repair and maintenance activities of SMC vehicles and
machinery, the New Municipal Workshop requires suitable machineries and
equipment to facilitate the maintenance and repair of various categories of SMC
vehicles, including light motor vehicles (LMVs), medium and heavy commercial
vehicles, trucks and other specialized vehicles and machinery.
The complete work shall be carried out in accordance with the specifications, approved makes,
applicable safety standards and instructions of the Engineer-in-Charge. The contractor shall ensure
proper coordination of the shifting, installation and commissioning activities so that the new
workshop can be made operational with minimum disruption to the vehicle repair and maintenance
functions of SMC.
ACE/Workshop11/2026-27 SITC_Equipments
4.3 Detailed Scope of Work & Technical Specifications
A. Detailed Scope of Work
1. Scope of Work
The scope of work shall include the supply, transportation, unloading, delivery and placement of
various tools, machinery, equipment and accessories required for the operation, maintenance,
fabrication and repair activities of the New Municipal Workshop of Surat Municipal Corporation
The materials and equipment to be supplied shall include, but not be limited to, the following:
1. Heavy-duty abrasive metal cut-off machine with a minimum 355 mm (14-inch) cutting
2. Heavy-duty vehicle washing system with a minimum 3 HP pump/motor.
3. Pillar drilling machine.
4. Lever-operated guillotine shear for sheet-metal cutting.
5. Heavy-duty bench vice with a minimum 200 mm (8-inch) jaw width and minimum
mm jaw opening, complete with a suitable heavy-duty pedestal.
6. Air-operated pneumatic grease pump with a minimum 15 kg grease container.
7. Heavy-duty pneumatic impact wrench with 1-inch square drive.
8. Heavy-duty pneumatic impact wrench with 1/2-inch square drive.
9. Heavy-duty double-ended bench grinder with 200 mm (8-inch) grinding wheels.
The equipment shall conform to the technical specifications, minimum performance requirements
and accessory requirements prescribed in the tender document.
2. Technical Compliance and Quality Requirements
All materials and equipment supplied shall be brand new, unused, free from manufacturing
defects and suitable for regular industrial workshop use.
The equipment shall be of reputed makes and shall conform to the specifications stipulated
in the tender. Equivalent makes and models shall be acceptable, provided they satisfy all
the prescribed minimum technical requirements.
The successful bidder shall submit the manufacturer's technical catalogue, datasheet or
other relevant technical documentation for verification of compliance wherever required
ACE/Workshop11/2026-27 SITC_Equipments
The successful bidder shall ensure that all components, accessories, fittings, guards,
operating handles, hoses, nozzles, cutting or grinding wheels, electrical controls and other
items specified for the respective equipment are supplied along with the equipment.
The equipment shall comply with applicable safety requirements and shall be supplied with
the standard safety guards and protective devices recommended by the manufacturer.
3. Delivery and Transportation
The successful bidder shall arrange transportation, loading, unloading and safe delivery of
all materials and equipment at the location specified by SMC.
All costs associated with packing, forwarding, transportation, transit insurance, loading,
unloading and delivery shall be deemed included in the quoted rates unless otherwise
specified in the tender.
The materials shall be delivered within the delivery period stipulated in the work order.
The bidder shall ensure that the materials and equipment are delivered in proper condition,
without damage during transportation or handling.
4. Installation, Testing and Commissioning
Wherever applicable, the successful bidder shall carry out installation, assembly,
placement, levelling, connection, testing and commissioning of the equipment at the
designated location within the New Municipal Workshop.
The bidder shall demonstrate satisfactory operation of the equipment to the satisfaction of
the designated SMC representative.
For electrically operated equipment, the bidder shall verify proper functioning of the
motor, controls, protective devices and other operating components.
For pneumatic equipment, the bidder shall verify compatibility with the available
compressed-air supply and demonstrate satisfactory operation at the manufacturer's
recommended operating pressure.
Any special foundation, electrical connection, compressed-air distribution work or other
infrastructure not expressly included in the BOQ shall be carried out only as directed and
as provided for in the tender conditions.
5. Inspection and Acceptance
SMC reserves the right to inspect the materials and equipment upon delivery and before
ACE/Workshop11/2026-27 SITC_Equipments
The supplied equipment shall be checked for conformity with the approved technical
specifications, make and model, quantity, accessories and general condition.
Any equipment found damaged, defective, incomplete or not conforming to the tender
specifications shall be replaced, rectified or completed by the successful bidder at no
additional cost to SMC.
Final acceptance shall be subject to satisfactory inspection, demonstration and submission
of the required documents.
6. Warranty and After-Sales Service
The supplied equipment shall carry a minimum warranty of 12 months from the date of
successful delivery, installation and commissioning, wherever applicable, or such other
warranty period as specified in the tender.
During the warranty period, manufacturing defects and defects arising under normal
operating conditions shall be rectified by the successful bidder or authorised service
provider without additional cost to SMC, subject to the manufacturer's warranty terms
and the tender conditions.
The bidder shall provide warranty certificates, user manuals, maintenance instructions
and details of the authorised service centre, wherever applicable.
7. Manuals and Handover
The successful bidder shall hand over the equipment in complete working condition along
with operating manuals, maintenance instructions, warranty documents, technical
datasheets and other relevant documentation supplied by the manufacturer.
The bidder shall also provide basic operating instructions and safety guidance to the
designated SMC personnel wherever installation or commissioning is included in the
8. Rates and Payment
The quoted rates shall include the cost of the equipment, standard accessories, packing,
transportation, insurance, loading, unloading, delivery, installation, testing,
commissioning and demonstration, wherever applicable, in accordance with the BOQ and
tender conditions.
Payment shall be made in accordance with the terms and conditions of the tender after
satisfactory delivery, inspection, acceptance and completion of the applicable installation
and commissioning requirements.
ACE/Workshop11/2026-27 SITC_Equipments
9. General Conditions
The successful bidder shall be responsible for supplying the complete equipment as
specified in the BOQ and technical specifications.
No substitution of the approved make or model shall be permitted without prior written
approval of SMC.
SMC reserves the right to reject any material or equipment that does not meet the
stipulated requirements.
All work shall be carried out in accordance with the tender conditions, approved
specifications and instructions issued by the competent authority of SMC.
The scope shall be deemed complete only upon delivery of the specified materials and
equipment, supply of the required accessories and documents, and satisfactory
installation, testing and commissioning wherever applicable.
B. Technical Specifications of Machineries & Equipments
1. Heavy-Duty Abrasive Metal Cut-Off Machine
Technical Specifications: Heavy-Duty Abrasive Metal Cut-Off Machine
Parameter Minimum Technical Requirement
Heavy-duty abrasive metal cut-off machine suitable for cutting MS
sections, pipes, rods, angles, and other metal sections
2 Minimum 355 mm (14 inches)
3 Motor Power Minimum 2,200 W
4 Power Supply 230 V AC, 50 Hz, single-phase
5 Material Vice Heavy-duty clamping vice for secure holding of the workpiece
6 Mitre Cutting Adjustable cutting angle for straight and mitre cuts
7 Spindle Lock To facilitate safe and convenient abrasive wheel replacement
Heavy-duty protective guard covering the abrasive wheel as per
applicable safety requirements
9 Spark Deflector Suitable spark deflector to direct sparks away from the operator
10 Motor Protection Overload and/or thermal protection
Complete with at least one suitable abrasive cutting wheel compatible
11 Cutting Wheel
with the machine
Standard accessories required for safe operation shall be supplied
along with the machine
ACE/Workshop11/2026-27 SITC_Equipments
Operational Machine shall be new, unused, of a standard make, and suitable for
Requirement continuous workshop use
14 Make Bosch, Stanley, INGCO, Makita, Dewalt only.
2. Heavy-Duty Vehicle Washing System
4.3.1 Technical Specifications: Heavy-Duty Vehicle Washing System
Parameter Minimum Technical Requirement
Heavy-duty high-pressure vehicle washing system suitable for
1 Equipment Type washing municipal vehicles, trucks, buses, JCBs, fire vehicles and
other workshop vehicles
Heavy-duty high-pressure pump suitable for continuous workshop
3 Motor Power Minimum 3 HP
Suitable electrical supply compatible with the motor; 230 V single-
phase or 415 V, 3-phase, 50 Hz, as offered
5 Working Pressure Safe and suitable working pressure required for vehicle washing
Suitable flow rate for efficient washing of heavy and light vehicles;
6 Water Flow Rate
manufacturer shall specify the rated flow
Suitable high-pressure hose of adequate length and pressure rating
7 High-Pressure Hose
compatible with the pump
8 Spray Gun and Lance Heavy-duty spray gun with suitable lance for vehicle washing
Interchangeable spray nozzles suitable for different washing
Suitable inlet filter/strainer to prevent dirt and solid particles from
10 Water Inlet Filter
entering the pump
11 Pressure Control Suitable pressure regulation and safety pressure-relief arrangement
Complete electrical starter/control arrangement with appropriate
12 Motor Starter/Control
overload protection
Suitable protection against excessive pressure and provision for
13 Safety Features
Fittings and All required hoses, couplings, connectors, seals and standard
Connections fittings for complete operation
Installation and Supply, installation, testing and commissioning, including
Commissioning demonstration of satisfactory operation
All standard accessories required for safe and effective operation
shall be supplied
Minimum 12 months from the date of successful commissioning or
as specified in the tender
The equipment shall be new, unused, of a reputed make and
18 General Requirement
suitable for regular use in a municipal vehicle workshop
ACE/Workshop11/2026-27 SITC_Equipments
REN Jetting, ATS ELGi, Shakti Technology, Hyco, Neckpower,
19 Make Krishna Engineering or equivalent make meeting the specified
technical requirements.
Tender note: The bidder shall submit the manufacturer's technical datasheet specifying motor
power, rated working pressure, water flow rate, electrical requirements and supplied accessories.
The system shall be supplied as a complete, operational unit. Equivalent makes and models
meeting the specified minimum requirements shall be acceptable.
3. Heavy-Duty Pillar Drilling Machine
4.3.2 Technical Specifications: Heavy-Duty Pillar Drilling Machine
Parameter Minimum Technical Requirement
Heavy-duty pillar/column-type drilling machine suitable for drilling
operations in MS plates, structural sections and other metal components
2 Minimum 25 mm diameter in mild steel (MS)
3 Motor Power Minimum 1 HP or suitable for the specified drilling capacity
4 Power Supply 415 V, 3-phase, 50 Hz AC
Multiple selectable spindle speeds suitable for drilling different materials
5 Spindle Speed
and hole diameters
6 Spindle Travel Approximately 100 mm or higher
Suitable standard spindle taper compatible with commonly available drill
7 Spindle Taper
chucks and tooling
Suitable drill chuck with key, compatible with the machine's rated drilling
Heavy-duty adjustable work table with provision for securely clamping the
Table Table capable of vertical adjustment along the column; tilting/swivelling
Adjustment arrangement, if provided in the standard model
11 Column Heavy-duty rigid column to ensure stability and drilling accuracy
Heavy-duty cast-iron or equivalent rigid base with provision for floor
13 Manual spindle feed with suitable feed handles and depth control/stop
14 Safety Guard Suitable protective guard for the drill chuck/spindle area
15 Suitable electrical overload protection
Drill chuck, chuck key, standard operating handles and other accessories
required for normal operation
Supply, placement, levelling and commissioning at the designated
17 Installation
workshop location
General Machine shall be new, unused, of a reputed make and suitable for regular
Requirement industrial workshop use
ACE/Workshop11/2026-27 SITC_Equipments
K.R. Panchal, Pathak, Prashant, High Life Industries, Siddhapura
19 Machine Tools, Bhavya Machine Tools, Dipak Machine Tools, Zoil, or
equivalent make meeting the specified technical requirements.
Tender note: The bidder shall submit the manufacturer's catalogue or datasheet indicating drilling
capacity, motor rating, spindle speeds, spindle travel and electrical requirements. Equivalent
makes and models meeting the minimum requirements shall be acceptable.
4. Lever-Operated Guillotine Shear
4.3.3 Technical Specifications: Lever-Operated Guillotine Shear
Parameter Minimum Technical Requirement
1 Machine Type Heavy-duty manual lever-operated guillotine sheet-metal shear
2 Operation Manual operation using a hand lever
Minimum 6 mm thick mild-steel sheet, subject to the specified
3 Cutting Capacity
4 Cutting Width Minimum 250 mm
Hardened, replaceable cutting blades suitable for mild-steel sheet
5 Cutting Blade
6 Blade Adjustment Provision for blade clearance adjustment, wherever applicable
7 Rigid support table or bed for proper positioning of sheet metal
Clamping Suitable sheet-holding arrangement to prevent movement during
Arrangement cutting
Heavy-duty fabricated or cast-metal construction designed to
9 Frame Construction
withstand cutting loads
Robust operating lever with suitable mechanical advantage for
10 Lever Mechanism
Suitable guarding and safe operating arrangement to minimize the
11 Safety Features
risk of hand injury
12 Mounting Stable base with provision for secure floor or workbench mounting
Standard operating lever, blades and accessories required for normal
General New, unused machine suitable for regular municipal workshop
Requirement fabrication and repair work
Breeze or equivalent make, subject to compliance with the specified
15 Indicative Makes
cutting capacity and width.”
5. Heavy-Duty Bench Vice
4.3.4 Technical Specifications: Heavy-Duty Bench Vice
Parameter Minimum Technical Requirement
ACE/Workshop11/2026-27 SITC_Equipments
Heavy-duty bench vice, suitable for industrial workshop fabrication,
1 Equipment Type
repair and maintenance work
2 Jaw Width Minimum 200 mm (8 inches)
3 Jaw Opening Minimum 200 mm
4 Body Material Heavy-duty forged steel or ductile iron construction
5 Jaws Hardened, serrated and replaceable steel jaws
6 Spindle Heavy-duty steel spindle with robust screw mechanism
7 Heavy-duty steel tommy bar or equivalent operating handle
8 Anvil Integrated anvil surface suitable for light workshop fitting operations
9 Base Heavy-duty swivel base with secure locking arrangement preferred
Sturdy, heavy-duty steel or cast-metal pedestal with stable base and
provision for floor anchoring
11 Mounting Secure mounting arrangement between vice and pedestal
12 Finish Corrosion-resistant protective finish suitable for workshop conditions
All standard mounting hardware and accessories required for
installation and operation
14 New, unused equipment suitable for regular industrial workshop use
Breeze, Apex,TAPARIA, Eastman, Stanley,Yato,,Ervin,,Groz or
equivalent make meeting the specified technical requirements.
6. Air-Operated Pneumatic Grease Pump
4.3.5 Technical Specifications: Air-Operated Pneumatic Grease Pump with 15 kg Bucket
Parameter Minimum Technical Requirement
Air-operated pneumatic grease pump suitable for lubrication and
1 Equipment Type
maintenance of municipal vehicles and workshop machinery
Grease Container
2 Minimum 15 kg
3 Pump Type Pneumatically operated high-pressure grease pump
4 Pressure Ratio Minimum 50:1
Operating Air Suitable for compressed-air supply in the range of approximately 5–8
Grease Delivery Suitable for high-pressure grease dispensing; compatible with the
Pressure specified pressure ratio and operating air pressure
7 Grease Container Heavy-duty bucket/drum with suitable cover and follower plate
8 Grease Hose High-pressure grease delivery hose, minimum 4 metres in length
9 Heavy-duty grease gun with suitable coupler and swivel connection
Air Inlet Standard pneumatic air inlet connection compatible with workshop
Connection compressed-air supply
Portable arrangement with suitable trolley or wheels, if provided in the
ACE/Workshop11/2026-27 SITC_Equipments
Complete with air hose/connection fittings, grease hose, dispensing
12 Accessories gun, follower plate, drum cover and all standard accessories required
Suitable for greasing vehicle chassis, bearings, suspension
components, joints and other automotive/industrial lubrication points
14 Construction Heavy-duty construction suitable for regular workshop use
General New, unused equipment from a reputed manufacturer, supplied
Requirement complete and ready for operation
Durelo, Groz, Hukums, Prima, Ozar, Penta, or equivalent make make
16 Indicative make
meeting the specified technical requirements.
Note: The bidder shall submit the manufacturer's technical catalogue confirming container
capacity, pressure ratio, operating air pressure, hose length and included accessories.
7. Heavy-Duty Air Impact Wrench –
4.3.6 Technical Specifications: Heavy-Duty Air Impact Wrench – 1-Inch Drive
Parameter Minimum Technical Requirement
Heavy-duty pneumatic impact wrench suitable for commercial vehicle
1 Equipment Type
and industrial workshop applications
2 Drive Size 1 inch (25.4 mm) square drive
3 Minimum 1,800 Nm
4 Approximately 6.2–8 bar
5 No-Load Speed Minimum 3,000 RPM
6 Heavy-duty twin-hammer or equivalent impact mechanism
7 Air Consumption Manufacturer-rated air consumption to be specified by the bidder
8 Air Inlet Suitable pneumatic air inlet, preferably 1/2 inch
9 Handle Type Ergonomic pistol-grip or D-handle design, suitable for heavy-duty use
10 Forward and reverse operation
11 Torque Control Adjustable power settings or equivalent control arrangement
12 Anvil Heavy-duty square anvil suitable for 1-inch impact sockets
Complete with air connection fitting and suitable heavy-duty impact
sockets, minimum 32 mm and 33 mm, if required by SMC
Suitable for loosening and tightening wheel nuts and heavy fasteners
on trucks, buses, fire vehicles, JCBs and other municipal vehicles
General New, unused equipment from a reputed manufacturer, supplied with
Requirement standard accessories and manufacturer's warranty
Bosch,INGCO,Stanley, Dewalt, Elephant, Hyco, Chicago Pneumatic,
Ingersoll Rand, Ozar,Neto,GROZ
ACE/Workshop11/2026-27 SITC_Equipments
8. Heavy-Duty Pneumatic Impact Wrench
Technical Specifications: Heavy-Duty Pneumatic Impact Wrench – 1/2-
Parameter Minimum Technical Requirement
Heavy-duty pneumatic impact wrench for automotive and industrial
1 Equipment Type
2 Drive Size 1/2 inch (12.7 mm) square drive
Maximum Reverse
3 Minimum 600 Nm
Forward / Working Suitable for routine fastening and loosening of automotive fasteners;
Torque bidder shall specify rated torque
5 Impact Mechanism Twin-hammer or equivalent heavy-duty impact mechanism
6 Approximately 6.2–6.3 bar (90–92 psi)
7 Free Speed Minimum 7,000 RPM
8 Air Consumption Manufacturer-rated air consumption to be specified by the bidder
9 Air Inlet Standard pneumatic connection, preferably 1/4 inch
Minimum Hose Suitable air hose, preferably 3/8 inch internal diameter, or as
Size recommended by the manufacturer
11 Direction Control Forward and reverse operation
12 Adjustable power settings or equivalent control arrangement
Heavy-duty metal or composite housing suitable for regular
14 Handle Ergonomic pistol-grip handle with trigger-operated control
Air connection fitting and suitable impact sockets, preferably
including commonly used sizes for automotive maintenance
General New, unused equipment with standard accessories and
Requirement manufacturer's warranty
Bosch,INGCO,Stanley, Dewalt, Elephant, Hyco, Chicago
17 Indicative Make
Pneumatic, Ingersoll Rand, Ozar,Neto,GROZ
9. Heavy Duty Double ended Bench Grinder
Technical Specifications: Heavy Duty Double ended Bench Grinder
Parameter Minimum Technical Requirement
ACE/Workshop11/2026-27 SITC_Equipments
1 Equipment Heavy-duty double-ended bench grinder
2 200 mm (8 inches)
3 Motor Power Minimum 550 W
4 Power Supply 230 V AC, 50 Hz, single-phase
Approximately 2,850–3,600 RPM, as per manufacturer's standard
5 No-Load Speed
6 Grinding Wheels Two abrasive wheels of suitable grades for rough and fine grinding
7 Wheel Width Minimum 20 mm
8 Wheel Guard Protective guards for both grinding wheels
9 Eye Shields Adjustable transparent eye shields on both sides
10 Tool Rests Adjustable workpiece rests on both sides
Heavy-duty motor suitable for regular workshop grinding
12 Base Rigid base with provision for secure bench mounting
Suitable protection against accidental contact with rotating wheels
and an accessible ON/OFF switch
Grinding wheels, eye shields, tool rests, mounting hardware and
standard accessories
15 New, unused machine with manufacturer's warranty
16 Make Bosch, Makita, INGCO, Stanley, DeWalt,Metabo
Note:- To ensure full compliance and avoid technical rejection during bid evaluation:
1. Line-by-Line Compliance Matrix: Bidders should submit a structured compliance
statement placing the Tender Specification Requirement side-by-side with the Offered
Model’s Actual Datasheet Value and the corresponding manufacturer catalog page
2. Original Catalogs: Enclose manufacturer brochures/catalogs highlighting the exact
model number to prove that the specified make satisfies every row of the tabular
technical parameters.
4.4 Offer Detail: -
Bidder has to submit offer online only but it's necessary to fill all the required details
mentioned in Annexure-X .
The present work involves Supply, installation, testing and commissioning of Heavy
Duty machineries and equipment for the New Municipal Workshop located at Lal
ACE/Workshop11/2026-27 SITC_Equipments
Darwaja. If the bidder does not wish to offer for a particular item they can write
"NOT QUOTED" in place of the dedicated column of Annexure-X (Offer) and leave
the online price bid blank for that particular item. Bidder has to offer the rate online
Please Consider trailing section named as "Important thing to be considered" before
quoting rate / Giving Offer.
4.5 Tender Evaluation: -
As per1.21 i.e. IT-21 of this tender.
4.6 Important thing to be considered: -
Bidder has to consider rate tender validity tenure / Contract tenure before quoting rate as
during contract tenure rate remain firm and fix.
Bidder has to maintain coordination with workshop regarding work. Its sole responsibility
of bidder to confirm and get clarification regarding work before starting of work from
Concern Engineer In charge as SMC may not pay any extra work charge which is not in
scope of tender and which is not get cleared before starting work. Bidder has to use their
own tools and tackles for repairing work, corporation won't provide it. Bidder has to
consider transpiration cost before quoting rate
Resulting rate after bidder's offer must includes any duties, any levies and an all the costs
due to Carting ,transportation, insurance, loading, unloading, etc up to delivery @ New
Municipal Workshop , opposite SIMS Hospital, Lal Darwaza, Surat @ Surat Municipal
Corporation. Considering this matter bidder has to quote the rate.
Bidder has to give a priority to the work assigned by corporation.
No advance payment shall be made. Surat Municipal Corporation may seek clarification
regarding for GST related matter like HSN CODE and TAX SLAB of supplied item and
its match with prevailing GST Tariff from Bidder. Bidder is bound to present same on
Chartered Account's letter head.
Successful bidder has to include detail as per Surat municipal corporation bill format.
Executive Engineer
Municipal Workshop
Surat Municipal Corporation
SEAL & SIGNATURE OF THE TENDERER:
ACE/Workshop11/2026-27 SITC_Equipments
SURAT MUNICIPAL CORPORATION
MUNICIPAL WORKSHOP
Annexure-I (Work Completion Details)
(SUBMIT ONLINE ONLY)
Performa for list of works of similar nature already completed by the Tenderer during last
Cost on Time taken in months Client Date of
Sr. No. Name of work & Place
Completion to complete the work Name Completion
Signature of the contractor with Seal
ACE/Workshop11/2026-27 SITC_Equipments
SURAT MUNICIPAL CORPORATION
MUNICIPAL WORKSHOP
Annexure-II (Work On Hand)
Performa for list of works of similar nature on hand
Sr. Name of Estimate Date of Stipulated Amount Brief Name
No. Work with d Cost issue of period of of work details of of
place work completion done delay if Client
Signature & Seal of the Bidder
(Note: Amount of work done in Column 6, should be given up to the month previous to the
month in which tenders are invited).
ACE/Workshop11/2026-27 SITC_Equipments
SURAT MUNICIPAL CORPORATION
MUNICIPAL WORKSHOP
Annexure-III (Affidavit)
(SUBMIT ONLINE & IN HARD COPY ALSO)
Name of Work:- Supply, Installation, Testing and Commissioning of Heavy-Duty Equipment and
Machineries at the New Municipal Workshop office of Surat Municipal Corporation.
Tender Notice No.:- ACE/Workshop/11/2026-27 Work No
1. I, the undersigned, do hereby certify that all the statements made in the required attachments
are true and correct. I also understand that in case of wrongful/false information, corporation
is entitled to take any civil & criminal punitive action against me / us.
2. The undersigned also hereby certifies that neither our firm M/s.
nor any of its constituent partners have abandoned any work in India nor any contract awarded
to us has been rescinded during last five years, prior to the date of this bid.
3. The undersigned hereby authorize(s) and request(s) any bank, person, authorities, government
or public limited institutions, firm or corporation to furnish pertinent information deemed
necessary and requested by the SMC to verify our statements or our competence and general
reputation etc.
4. The undersigned understands and agrees that further qualifying information may be requested
and agrees to furnish any such information at the request of the SMC.
5. The SMC and its authorized representatives are hereby authorized to conduct any inquiries or
investigations to verify the statements, documents and information submitted in connection
with this bid and to seek clarification from our bankers and clients regarding any financial and
technical aspects. This Affidavit will also serve as authorization to any individual or
authorized representative of any institution referred to in the supporting information, to
provide such information deemed necessary and requested by representative of Surat
Municipal Corporation to verify statements and information provided in the Tender or with
regard to the resources, experience and competence of the Applicant.
Signed by the authorized signatory of the firm with stamp
Title of the office
Name of the firm
Note: - The affidavit format as indicated above to be furnished on non-judicial stamp
paper of Rs.300 and duly notarized.
ACE/Workshop11/2026-27 SITC_Equipments
SURAT MUNICIPAL CORPORATION
MUNICIPAL WORKSHOP
Annexure-IV (Undertaking)
(SUBMIT ONLINE & IN HARD COPY ALSO)
(For a Amount More than 1.00 Cr. only )
Name of Work:- Supply, Installation, Testing and Commissioning of Heavy-Duty Equipment and
Machineries at the New Municipal Workshop office of Surat Municipal Corporation.
Tender Notice No.:- ACE/Workshop/11/2026-27 Work No.04
1. I/We ……………………………………….Address
…………………………………………Solemnly affirm and state that on oath that
………………………(Name of Tenderer) has not been black listed by any Government/Semi
Government/Public Sector Undertaking/Public limited and not has been banned/suspended
business dealings with the said firm.
2. I/We Undersigned do here by also declare that our firm/institute ................................... (Name
of Tenderer) has not been found guilty of malpractice, misconduct either by Any Public
Health Department, Govt. of Gujarat, Surat Municipal Corporation or by any local authority
and other State Government/Central Government's organizations.
3. The information given above is true to the best of my knowledge.
4. I/We agree that if any notice in future, my/our bid/tender shall be rejected/terminated.
Signed by the authorized signatory of the firm with stamp
Title of the office
Name of the firm
Note: - The under taking format as indicated above to be furnished on non-judicial stamp
paper of Rs.300 and duly notarized.
ACE/Workshop11/2026-27 SITC_Equipments
SURAT MUNICIPAL CORPORATION
MUNICIPAL WORKSHOP
Annexure-V (EMD and Tender Fee Clause)
Demand Draft for EMD & Tender Fee shall be submitted in electronic format only through
online (By colored Scanning) while uploading the bid. This submission shall mean that EMD
& Tender Fee are received for purpose of opening the bid. Accordingly offer of those shall be
opened whose EMD & Tender Fee is received electronically. However, for the purpose of
realization of D.D. Bidder shall send the D.D. in original through RPAD/Speed Post so as to
reach to Accountant Department TAPI BHAVAN (Main Office) within 7 Day from the last
date of online submission of the bid or as per date mentioned tender notice. Punitive action for
not submitting D.D. in Original to Account Department TAPI BHAVAN (Main Office) by
bidder shall be initiated and action shall be taken for abeyance of registration and cancellation
of E-tendering code for as follows.
At first instance following amount is to be paid to SMC
Sr No. Tender Amount Amount to be paid
2 Above 1.00 Cr up to 10.00 Cr Rs. 20,000/-
3 Above 10.00 Cr up to 50.00 Cr Rs. 30,000/-
4 Above 50.00 Cr up to 100.00 Cr Rs. 70,000/-
If bidder fails to submit the said amount within 10 days for the First instance OR in case of
second instance of this similar of mistake i.e. non submission of Valid Original Demand Draft
(D.D.)/B.G. to the Accounts Department TAPI BHAVAN (Main Office) within the specified
time limit, punitive action of abeyance/cancellation of E-tendering code for 6 months shall be
Any documents in supporting of bid shall be in electronic format only through online (By
colored Scanning) & hard copy will not be accepted separately.”
“Following Documents shall only be submitted in HARD COPY as well as upload online to
Surat Municipal Corporation by all bidders.”
Earnest Money Deposit as mentioned in tender. (i. e. D.D. / Pay Order)
Tender Fees as mentioned in the tender.
Affidavit on Non Judicial Stamp Paper of Rs. 300.00 (Annexure - III)
Undertaking on Non Judicial Stamp Paper of Rs. 300.00 (Annexure - IV)(Only For a
Tender Estimate Amount More than 1.00 Cr.)
Signature of the Contractor with Seal
ACE/Workshop11/2026-27 SITC_Equipments
SURAT MUNICIPAL CORPORATION
MUNICIPAL WORKSHOP
Annexure-VI (GST Clause)
GST CLAUSE FOR CONSTRUCTION / ERECTION / COMMISSIONING /
INSTALLATION / REPAIRS / MAINTENANCE / RENOVATION / FABRICATION OF
STRUCTURE INCLUDING BUILDING (MEANS ALL WORKS CONTRACT/ TURN
KEY PROJECTS/ SUPPLY OF MATERIAL / GOODS).
GST (goods & service tax) has come in existence from 1st July, 2017 contractor / successful
bidder is bound to pay any amount of GST prescribed by the Govt. of India as per the terms of
contract agreed upon during the course of execution of this contract.
During the course of execution of contract, if there is any change in rate of GST (Goods &
service tax) by the Government, the same shall be applicable Further the nonpayment of GST
to the Government may lead to the termination of contract and forfeiture of security deposit
/performance guarantee amount.
If imposition of any other new taxes /duties/Levies/cess or any other incidentals etc. shall be
paid. or any increase in the existing taxes/duties/levies /cess or any other incidents etc.
(excluding GST) are imposed during the course of the contract, the same shall be borne by the
contractor / successful bidder only, no case SMC shall be liable for the same.
Signature of the Contractor with Seal
ACE/Workshop11/2026-27 SITC_Equipments
SURAT MUNICIPAL CORPORATION
MUNICIPAL WORKSHOP
Annexure-VII (Personnel Details of partnership Firm)
1) Name of the Company :
Affix latest Affix latest Affix latest
passport size passport size passport size
photograph photograph photograph
Partner-2 Partner-3 Partner-4
Partner-1 or Proprietor
Affix latest passport size photograph
In case of partnership agency, affix latest passport size photograph of all partners.
Specimen signature of all partners in case of partnership agency
1. _______________________________ Submission of registered Agreement
2. _______________________________ is compulsory in case of partnership
Seal and Signature of Bidder
ACE/Workshop11/2026-27 SITC_Equipments
SURAT MUNICIPAL CORPORATION
MUNICIPAL WORKSHOP
Annexure- VIII (Bank List)
Finance Department GR No FD/MSM/e-File/4/2025/2712/DMO Dt.01/04/2026
(A) Guarantees issued by the following banks will be accepted as SD/EMD on a permanent basis
All Nationalized banks
(B) Guarantees issued by the following banks will be accepted as SD/EMD for a period up to
March 31, 2027.The validity cutoff date in GR is with respect to the date of issue of bank guarantee
irrespective of the date of termination of bank guarantee.
1 AXIS Bank 23 South Indian Bank
2 AU Small Finance Bank 24 Standard Chartered bank
3 Bandhan Bank 25 Tamilnad Mercantile Bank
4 City Union Bank 26 Ujjivan Small Finance Bank
5 CSB Bank 27 YES bank
6 DBS Bank India Limited 28 Ahmedabad Mercantile Co-op. Bank
7 DCB Bank 29 Nutan Nagarik Sahakari Bank Ltd.
8 Dhanlaxmi Bank 30 Rajkot Nagarik Sahkari Bank Ltd.
9 Equitas Small Finance Bank 31 Saraswat Co-Operative Bank Ltd
10 FEDERAL Bank 32 SBPP CO Operative Bank
11 HDFC Bank 33 SVC Co-Operative Bank Ltd.
12 HSBC Bank 34 The Cosmos co Operative Bank Ltd.
13 ICICI Bank 35 The Gujarat State Co-operative Bank
14 IDBI Bank 36 The Surat District Co -op Bank
15 IDFC First Bank 37 The Surat People's Co-Op. Bank Ltd
16 IndusInd 38 The Baroda Central Co-operative Bank
17 Jammu and Kasmir bank 39 The Panchmahal District Co-Operative Bank
18 Jana Small Finance Bank 40 The Kalupur Commercial Co-op. Bank
The Rajkot Commercial Co operative
19 Karnataka Bank 41 Bank
The Banaskantha Mercantile Co-op.Bank
20 Karur Vysya Bank 42 Ltd.
21 Kotak Mahindra Bank 43 Gujarat Gramin Bank
Note :- THIS BANK LIST SUPERSEDE ANYOTHER BANK MENTION ANYWHERE IN
SEAL & SIGNATURE OF THE TENDERER:
ACE/Workshop11/2026-27 SITC_Equipments
SURAT MUNICIPAL CORPORATION
MUNICIPAL WORKSHOP
Annexure –IX (Technical service profile pertaining to contractor)
Fill in all the columns. Simply stating as per attached sheet will not be accepted.
Sr Description To be filled by the Contractor
1 Name of Tenderer / Contractor :-
2 Name of contact person :-
E-mail address. :-
Address of Head Office. :-
Address Main office in Gujarat. :-
Office in Surat or nearest to Surat. :-
3 Are you a manufacturer/ authorized dealer/ sub :-
dealer/ any other? (Please specify).
4 Give details about your service network :-
6 Registration no., date & authority
7 Name & particulars of the authorized
representative for the details furnished here
8 Type of organization, including particulars of
Proprietor / Partners / Directors: (Sole
Proprietorship, Partnership, Private Ltd., Co-
Operative Body, etc.)
(Attested copy of deeds of Memorandum of
Association shall be enclosed.)
ACE/Workshop11/2026-27 SITC_Equipments
9 P.F. Registration no.
12 Electrical contractor license no. & Validity (If
13 Government registration certificate (SMC /
14 Income Tax pan no.
15 Profession -Tax No
16 Name and address of the bankers
17 Bank Facilities available
- Letters of Credit
- Solvency Certificate
18 Give details about your mode of giving service
19 Minimum period for attending the call/ :-
breakdown from the time of intimation.
20 Do you agree to all terms and conditions :- Yes
specified in the tender if no, please specify
where and how you differ (attach separate sheet
21 Give details of technical personnel, list of tools/ :-
tackles instruments possessed by you.
22 Completion period :- Agreed, As per tender terms &
conditions of this tender.
23 Enumerate customer’s list to whom such :-
equipment’s are supplied, installed and
commissioned by you and are in service at
present (Attach separate sheet if necessary).
24 How maintenance/ services will be offered. :- NA
Specify clearly (i.e. from Surat office or any
ACE/Workshop11/2026-27 SITC_Equipments
25 Testing will be carried out at manufacturer’s :- Agreed
works prior to dispatch of equipment as
specified earlier.
26 Manufacturer’s location details for inspection NA
27 Rates are inclusive of all central / state / local :- Agreed
self-government taxes, duties, levies. Prices are
also inclusive of packing forwarding,
transportation, insurance, loading, unloading,
watch & ward etc. and all other direct or indirect
costs /taxes/duties/levies/overheads those are
required to complete the job
28 Portion or percentage of the work the tenderer :- NA
proposes to sub-contract (if any) in case contract
29 For how many years has the organization been :-
in business under its present name & style?
30 Have you ever not completed work awarded to :-
you? (if so give the name of project and reasons
for not completing the work on separate page).
31 In which field of Electrical/Mechanical :-
Engineering do you claim specialization? (if
Details of your latest project completed. :-
I. Originally stipulated time limit.
II. Extended time limit
III. Actual time taken
IV. Reasons of delay
Attach separate sheet/ sheets if wherever required.
SEAL & SIGNATURE OF THE TENDERER:
ACE/Workshop11/2026-27 SITC_Equipments
SURAT MUNICIPAL CORPORATION
MUNICIPAL WORKSHOP
Annexure –X (Offer Details)
Sr. Particulars Unit Appro Required Make Offered Offer rate per Remarks
No x. Qty make piece
1 Heavy-duty Bosch, Stanley,
Cut-off Machine Nos.
2 Heavy-duty REN Jetting, ATS
Vehicle Washing ELGi, Shakti
system Nos. 01 Technology, Hyco,
3 Heavy Duty K.R. Panchal,
Pillar Drilling Pathak, Prashant,
Machine Nos. 01 High Life
Zoil, or equivalent
4 Lever Operated Breeze or
Guillotine Shear Nos. 01 equivalent make,
compliance with
cutting capacity and
ACE/Workshop11/2026-27 SITC_Equipments
5 Heavy Duty Breeze, TAPARIA,
Bench vice Nos. 02 Apex, Eastman,
Stanley,Yato,Ervin,
Groz or equivalent
Operated Nos. 01 Durelo,
Grease Pump Ozar, Penta, or
equivalent make,
Impact Wrench - Nos.
Bosch,INGCO,Stan
1 inch Elephant, Hyco,
Ingersoll Rand,
8 Heavy Duty Bosch,INGCO,Stan
Impact Wrench - Nos. 03 ley, Dewalt,
1/2 inch Elephant, Hyco,
Ingersoll Rand,
9 Heavy Duty Bosch, Makita,
Double ended Nos. 02 INGCO, Stanley,
Bench grinder DeWalt,Metabo
SEAL & SIGNATURE OF THE TENDERER:
ACE/Workshop11/2026-27 SITC_Equipments
SURAT MUNICIPAL CORPORATION
MUNICIPAL WORKSHOP
Annexure-XI (Bidder’s certificate)
Name of Work:- Supply, Installation, Testing and Commissioning of Heavy-Duty Equipment and
Machineries at the New Municipal Workshop office of Surat Municipal Corporation.
Tender Notice No.:- ACE/Workshop/11/2026-27 Work No
I / We hereby declare that I / We have perused in detail and have examined closely the
specifications/ scope of work / general terms & conditions / special terms / important instructions/
note described in the tender document. I / We hereby agree to be bound by and comply with all
such specifications/ terms, conditions etc.
I / We also certify that I / We have visited the sites and inspected the locations of the
proposed work before quoting my / our rates. I / We have considered all factors that may affect the
cost of project. I / We shall quote accordingly &will not claim any extra towards minor/ major item
related the job.
I / We also confirm that I / We have understood intent and content of the tender and I / We
assure that I/ We shall abide by all intents of the tender besides its wordings.
I / We also confirm that my / our offer is strictly in line with tender stipulations / terms /
conditions and understand that deviation of any kind, if found, my / our offer will be summarily
SEAL & SIGNATURE OF THE TENDERER:
ACE/Workshop11/2026-27 SITC_Equipments
SURAT MUNICIPAL CORPORATION
MUNICIPAL WORKSHOP
*This is informatory list of all documents /all the certificates. Among this, only applicable
docs/certificate as per IT-05 and IT-06 must be submitted in a manner as it's asked to
submit as mentioned elsewhere in tender.
Sr. Online Hardcopy
1 Tender Fees
2 Earnest Money Deposit
5 Work Experience as per Tender
6 Turn Over Certificate as per Tender
7 PAN Card copy
8 GST Registration Certificate
Duly Signed Tender Documents with filled required details (All
Duly Signed and Sealed all Addenda Corrigendum (if
11 Letter of Authorization
12 Partnership Deed/Power of attorney/ MoA / AoA
1. Above page is only for reference for the tender filling purpose and shall not be
considered for the evaluation purpose.
ACE/Workshop11/2026-27 SITC_Equipments
SURAT MUNICIPAL CORPORATION
MUNICIPAL WORKSHOP
Sr. General Description of works : Supply, Installation, Testing and
No. Name of Work: Commissioning of Heavy-Duty
Equipment and Machineries at the New
Municipal Workshop office of Surat
Municipal Corporation.
1. Estimated Cost : Rs.3,00,000/-
2. Earnest Money Deposited : Rs.3,000/-
3. Tender fee : Rs. 708/-
4. Required registration class : As mentioned in IT-05
5. On line submission (Last Date) of : 29/10/2026
6. Submission of Technical Bid, Tender : From 30/10/2026 to 13/11/2026
Fee, EMD and other documents etc. In
To, Chief Accountant, SMC Tapipura
hard copy to Chief Accountant SMC
(Muglisara) , Surat by RPAD / Speed
Tapipura (Muglisara) Surat.
7. Performance guarantee /Security : 2% as Initial Security Deposit As per
Deposit Tender Terms
8. Time Allowed for the Completion of : As per Tender Document
contract from date fixed in written order
9. Penalty : As per tender Document
10. Percentage to be retained from running : As per Tender Document
11. Compensation for delayed work. : 0.2% (Zero point Two Percent) of the
tender value of unexecuted work per day
of delay subject to maximum 10% of
unexecuted work amount. And as per
tender documents
12. Defect Liability Period : As per Tender Document
Executive Engineer
Municipal Workshop
Surat Municipal Corporation
SEAL & SIGNATURE OF THE TENDERER
ACE/Workshop11/2026-27 SITC_Equipments
ACE/Workshop11/2026-27 SITC_Equipments
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender_SITC_Equipment and Machinery.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .