| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹65.6 LAccepted-AOC | L1 | Accepted-AOC Lowest tender | |
| 2 | L2₹78.4 L+₹12.0 L (18.1%)Rejected-Finance 602 6TH FLOOR BNG HOUSE D N ROAD FORT MUMBAI 400001 | MUMBAI | MUMBAI | MAHARASHTRA | 400001 | L2 | Rejected-Finance Other than lowest tenderer | |
| 3 | L3₹80.1 L+₹13.7 L (20.6%)Rejected-Finance | L3 | Rejected-Finance Other than lowest tenderer | |
| 4 | L4₹84.4 L+₹18.0 L (27.1%)Rejected-Finance 606 80 FEET ROAD 7TH BLOCK 2ND PHASE BANASHANKARI 3RD STAGE BANGALORE 560 085 | BENGALURU URBAN | KARNATAKA | 560085 | L4 | Rejected-Finance Other than lowest tenderer |
Tender Value
₹89 L
EMD Value
₹1.6 L
Closing Date
3 Mar 2020, 6:00 pmClosed
CWE (NW) KOCHI
CWE (NW) KOCHI Military Engineers Services PIN - 682004
SPL REPAIRS FOR RENEWAL OF ANTIFUNGAL PAINT_ ROOF TREATMENT AND WASTE WATER/SEWAGE/RAIN WATER PIPES AT DAWSON VIHAR_ KOCHI
2020_MES_315451_1
CWE(NW)/KOCHI/81121
Open Tender
Civil Works - Buildings
Item Rate
330 days
KOCHI
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,000
GE (NW) Kochi
₹1.6 L
22 Apr 2020
16 Jan 2020
5 Mar 2020
16 Jan 2020
3 Mar 2020
6 Feb 2020
16 Jan 2020 - 25 Feb 2020
Amount
M&L for Complete removal of existing external wall treatment scrapping down and washing with water and filling the cracks properly and making good the damaged plastered surfaces/ RCC chajjas /roof projection with cement mortar / PCC and applying two coats of weather proof antifungal paint from Asian paint (Apex ultima protek) / Dulux paints (Weather shield) / Nerolac paints(Excel) over a coat of anti fungal primer over one coat of sealant base coat duly applied through authorised company applicator using modern tools and techniques upto 4th storey complete all as specified and directed. Note:- (i) Application of antifungal paint, primer and sealant shall be applied duly through authorised company applicator as per manufactures instruction. (ii) The rate quoted shall include the cost of scaffoldings and cradles including hoisting and lowering as required with bracing, support etc complete.
All as per item No.1above, but from 5th to 8th storey
All as per item No.1above, but from 9th storey and above
M&L for destruction of growth of weed plants with roots on the roof of bldgs. and on the wall of bldgs. at any height with 24 'D' oil mixed weedicides or mixed with veedol chemical solution and sprayed in and around roots and at places of possible growth of weeds all as directed by the Engineer-in-charge. Note:- (i) In case of plants that has trees like growth, the plant should be cut to avoid damages to roof/wall and rest to be treated with chemical solution (ii) The area after treatment shall be cleaned off all debris branches dead plant etc.
Taking down cement plaster of any description on walls including raking out joints, hacking for key scrubbing down with water etc upto 4th storey .
All as per item No.5 above, but from 5th to 8th storey
Rendering 5 mm thick on fair faces of brick work or concrete surfaces in cement mortar 1:4 with approved Water Proofing Compound all as per the manufacturers instruction over 10 thick rendering in CM 1:4 finished even and smooth without using extra cement up to 4th storey. Note : WPC shall be measured and paid separately.
All as per item No.7 above, but from 5th to 8th storey
M&L Preparation of newly plastered external wall surfaces and applying two coats of weather proof antifungal paint from Asian paint (Apex ultima protek) / Dulux paints (Weather shield) / Nerolac paints(Excel) over a coat of anti fungal primer duly applied through authorised company applicator using modern tools and techniques of approved make complete all as specified and as directed. Note:- (i) Application of antifungal paint, primer and sealant shall be applied duly through authorised company applicator as per manufactures instruction. (ii) The rate quoted shall include the cost of scaffoldings and cradles including hoisting and lowering as required with bracing, support etc complete.
All as per item No.9 above, but from 5th to 8th storey
Demolition of Reinforced Cement Concrete as in Roofs, Floors (Other than ground Floors) Beams, Stair Case , landings, Chajjas and Similar Suspended Works (Reinforcement cut as required to facilitate demolition) upto 4th Storey complete all as specified and as directed.
All as per item No.11 above, but from 5th to 8th storey
M&L for RCC (Nominal Mix 1:2:4) type B0 using12.5 mm graded stone aggregate as in Fins, Facias , Louvers , parapets and railings exc.60 cm in height, newels ,Chajjas , newels, balustrade etc., and the similar work upto 4th Storey complete all as specified and as directed.
All as per item No.13 above, but from 5th to 8th storey
M&L for TMT bars 10mm dia and over, cut to length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9mm dia or securing with clips upto 4th Storey complete all as specified and as directed.
All as per item No.15 above, but from 5th to 8th storey
M&L for preparation of old painted wooden surfaces of any description over 10 cm width or girth and applying one coat of synthetic enamel paint upto and including IV th storey complete all as specified and as directed.
All as per item No. 17 above, but from V th to VIII th storey
All as per item No.17 above, but from IX th storey and above
M&L for preparation of old painted steel surfaces of any description over 10 cm width or girth and applying one coat of synthetic enamel paint upto and including IV th storey complete all as specified and as directed.
All as per item No. 20 above, but from V th to VIII th storey
All as per item No.20 above, but from IX th storey and above
Taking down existing water proofing treatment from the roof above 8 storey bldg. including cement mortar bedding, removing debris and cleaning the roof surface complete all as specified and as directed.
M&L Cement concrete (1:2:4) type B0 using12.5mm graded stone aggregate in roof as padding 30 mm thick complete all as specified and as directed.
M&L screed bed or bedding layer of mortar 10 mm thick in CM 1:3 on concrete surface, mixed with and including WPC finished even and smooth without using extra cement. (Note:- WPC shall be measured and paid separately. Dosage of WPC shall be as per direction of manufacturer)
M&L Applying oil bound bitumen @ 0.25 kg/sqm providing and laying 4 mm thick APP modified water proofing membrane weighing not less than 4.00 Kg/Sqm reinforced with one woven polyester mat weighing not less 160g/Sqm having softening point not less than 140 degree centigrade longitudinal tensile strength not less than 650 N/5 cm, tearing strength of 180 N (Min),a static puncher resistance of 180,torch application including minimum 10 cm side over lap & 15 cm end overlap and applying a coat of blown grade hot bitumen 85/25 before and over the membrane 1.20Kg/Sqm finishing with solar reflective bituminous based aluminium paint @ 0.10Kg/Sqm all as specified (four course treatment) in clause 11.40.3.3 of SSR Part I and Particular specification.
Supply only integral water proofing compound
S&F in repair PVC (SWR) pipes 110 mm dia single socketed in any length with all fittings (other than that given at item below), with rubber rings fixed to wall upto and including IV th storey complete all as specified and as directed.
All as per item No.28 above, but from V th storey and above
S&F in repair PVC (SWR) pipes 75 mm dia single socketed in any length with all fittings (other than that given at item below), with rubber rings fixed to wall upto and including IV th storey complete all as specified and as directed.
All as per item No.30 above, but from V th storey and above
S&F in repair PVC (SWR) Junction single (Single T) equal or unequal provided with access door for 75 mm dia pipe complete all as specified and as directed.
All as per item No.32 above, but from V th storey and above
S&F in repair PVC (SWR) Junction single (Single T) equal or unequal provided with access door for 110 mm dia pipe complete all as specified and as directed.
All as per item No.34 above, but from V th storey and above
S&F in repair PVC (SWR) bends any radius 75 mm dia with rubber ring complete all as specified and directed .
All as per item No.36 above, but from V th storey and above
S&F in repair PVC (SWR) bends any radius 110 mm dia with rubber ring complete all as specified and directed .
All as per item No.38 above, but from V th storey and above
S&F PVC (SWR) 110 mm dia vent cowl complete all as specified and directed .
S& F PVC (SWR) 75mm dia vent cowl complete all as specified and directed .
S & F 110 mm dia PVC (SWR) branch piece single (single Y) (equal or unequal) ordinary or inverted (spigot or socket type ) or with parallel branch up to 4 th storey complete all as specified and directed .
All as per item No.42 above, but from V th to VIII th storey
S & F 75 mm dia PVC (SWR) branch piece , single (single Y) (equal or unequal ) ordinary or inverted (Spigot or socket type ) or with parallel branches up to 4 th storey complete all as specified and directed .
All as per item No.44 above, but from V th to VIII th storey
S&F in repairs PVC (SWR) pipes 110mm bore single socketed in any length with rubber ring joints fixed to walls as in RWP upto 8th storey complete all as specified and directed .
Star Construction Co.
Suprisons
Lucky Enterprises
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .