Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-AOC | ₹1.7 L | L1 | Accepted-AOC 1stLowest |
| 2 | L2₹1.8 LRejected-AOC | ₹1.8 L | L2 | Rejected-AOC 2ndLowest |
| 3 | L3₹1.8 LRejected-AOC | ₹1.8 L | L3 | Rejected-AOC 3rdLowest |
Tender Value
₹1.8 L
EMD Value
₹3,528
Closing Date
18 Feb 2026, 2:00 pmClosed
E.E PIPD
Office of the Executive Engineer, PIPD, Purulia,Bhatbundh Irrigation Colony, Purulia.
M/R to Down side retaining wall of the pipe culvert near 5450m and bank strengthening in between 5650 m to 5900 m of LBMC in connection with Tatko I Scheme.
2026_IWD_1000011_7
WBIW/EE/PUAPWI001/eNIT06/25-26
Open Tender
CIVIL WORKS
90 days
Bandwan
Please refer Tender documents.
4 documents required · 4 mandatory
₹3,528
2 Mar 2026
10 Feb 2026
19 Feb 2026
10 Feb 2026
18 Feb 2026
10 Feb 2026
10 Feb 2026 - 18 Feb 2026
Cutting and clearing jungles including shrubs, water weeds, bushes, trees, plants,upto 30cm. Girth including removing as directed by Engineer-in-charge.
Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m . a) In ground floor including roof
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. a) Pakur Variety
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)
Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of, A) Beyond 500 metre and upto 1.00 km. NB :- Measurement to be taken on the basis of stack measurement / prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.57 MB
Aggrement_2911.pdf
Additional Documents • 1.86 MB
BOQ_2449911.xls
BOQ • 0.33 MB
OID.pdf
Additional Documents • 0.37 MB
Download all tender documents and submit your bid