| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | LI₹15.0 LAccepted-AOC | LI | Accepted-AOC Lowest bidder | |
| 2 | Rejected-Technical | - | Rejected-Technical heigh quoted rate. | |
| 3 | Rejected-Technical | - | Rejected-Technical heigh quoted rate,No Hard copy received. | |
| 4 | Rejected-Technical | - | Rejected-Technical heigh quoted rate,No Hard copy received. | |
| 5 | Rejected-Technical POTTAKKAL PADAM HOUSE METTUPALAYAM THATTAMANGALAM | METTUPALAYAM | KERALA | - | Rejected-Technical heigh quoted rate. |
Tender Value
₹17.1 L
EMD Value
₹42,800
Closing Date
5 Nov 2019, 1:00 pmClosed
Executive Engineer
K D Division Thanneermukkom
Desilting
2019_Irrig_314137_1
06/EE/KDT/2019-20
Open Tender
Civil Works - Others
Item Rate
120 days
Pattanakkad
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,800
Yes
online
₹42,800
Yes
14 Jan 2020
28 Oct 2019
8 Nov 2019
28 Oct 2019
5 Nov 2019
28 Oct 2019
Amount
Scheme-1- Desilting
od18527/2019_2020/KP : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, and forming bunds on both banks using excavated earth to be levelled and neatly dressed.All kinds of soil
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
Scheme-2- Desilting
od18527/2019_2020/KP : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, and forming bunds on both banks using excavated earth to be levelled and neatly dressed.All kinds of soil
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
Scheme-3- Deslting
od18527/2019_2020/KP : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, and forming bunds on both banks using excavated earth to be levelled and neatly dressed.All kinds of soil
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
scheme-4- desilting
od18527/2019_2020/KP : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, and forming bunds on both banks using excavated earth to be levelled and neatly dressed.All kinds of soil
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
Scheme -5- Desilting
od18527/2019_2020/KP : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, and forming bunds on both banks using excavated earth to be levelled and neatly dressed.All kinds of soil
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
Scheme -6-Desilting
od18527/2019_2020/KP : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, and forming bunds on both banks using excavated earth to be levelled and neatly dressed.All kinds of soil
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
Scheme-7- desilting
od18527/2019_2020/KP : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, and forming bunds on both banks using excavated earth to be levelled and neatly dressed.All kinds of soil
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
Scheme-8- Desilting
od18527/2019_2020/KP : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, and forming bunds on both banks using excavated earth to be levelled and neatly dressed.All kinds of soil
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
Scheme-9- Desilting
od18527/2019_2020/KP : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, and forming bunds on both banks using excavated earth to be levelled and neatly dressed.All kinds of soil
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
scheme -10- Desilting
od18527/2019_2020/KP : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, and forming bunds on both banks using excavated earth to be levelled and neatly dressed.All kinds of soil
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
Scheme-11- Desilting
od18526/2019_2020/KP : Earth work excavation by mechanical means ( Hydraulic excavator ) / manual means over areas ( exceeding 30cm depth, 1.5m width as well as 10sqm 0n plan ) including disposal of excavated earth ,lead up to 50m ,and forming bunds both banks using excavated earth to be levelled and neatly dressed all knds of soilDetails of cost for 10cum average output of hyraulic excavator per hour =30cumMECHINERY
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
Scheme-12- Desilting
od18526/2019_2020/KP : Earth work excavation by mechanical means ( Hydraulic excavator ) / manual means over areas ( exceeding 30cm depth, 1.5m width as well as 10sqm 0n plan ) including disposal of excavated earth ,lead up to 50m ,and forming bunds both banks using excavated earth to be levelled and neatly dressed all knds of soilDetails of cost for 10cum average output of hyraulic excavator per hour =30cumMECHINERY
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
vinod v
C.A BASHEER
YEM PEES CONTRACTING
P S Sunilkumar
PREM KUMAR A
Bidder Name
C.A BASHEER
P S Sunilkumar
PHILIP GEORGE
YEM PEES CONTRACTING
vinod v
PREM KUMAR A
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_432544.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .