| 1 | L1₹44.0 LAccepted-AOC SCO 117 118 FF CABIN NO 104 SECTOR 17B CHANDIGARH | L1 | Accepted-AOC LOA | |
| 2 | Rejected-Technical | - | Rejected-Technical Non Responsive |
| Sl No | Description | Qty | Unit | Nova Enviro Engineers L1 |
|---|---|---|---|---|
| 1.00 | Supply, installation, testing and commissioning of electric Hot Water Generator with sufficient number of electric immersion heaters. Capacity 500 KW in 6 steps. Hot Water Generator shall be made of 8mm M.S with dish end of 10mm M.S. duly lined with 16q stainless steel lining. The shall be insulated with 75mm thick resin bonded insulation of 24 kg/cum density finished with 1.25mm Al. cladding. The electric panel suitable incoming and outgoing switchgear for heaters, automatic controls, relays ON/OFF thermostat etc. including all labour and petty material required to complete the job in all respect upto the entire satisfaction of Engineer-in-Charge of work. Make as per list attached | 1 | Each | 12,25,000 ₹12,25,000 Lowest |
| 2.00 | Supply, installation, testing and commissioning of size 200MM IN / OUT Heavy class M.S. Piping with 75mm EPS insulation and 24G Al. cladding and all fittings including all labour and petty material required to complete the job in all respect upto the entire satisfaction of Engineer-in-Charge of work. Make as per list attached | 8 | Metre | 8,100 ₹64,800 Lowest |
| 3.00 | Supply, installation, testing and commissioning of size 250MM IN / OUT Heavy class M.S. Piping with 75mm EPS insulation and 24G Al. cladding and all fittings including all labour and petty material required to complete the job in all respect upto the entire satisfaction of Engineer-in-Charge of work. Make as per list attached | 12 | Metre | 10,300 ₹1,23,600 Lowest |
| 4.00 | Supply, installation, testing and commissioning of Heavy duty PN-16 Butterfly valve of capacity 200 MM Lever operated type with counter flanges, fittings, nut bolts, gasket etc. duty insulated with 75mm EPS and Al. cladding including all labour and petty material required to complete the job in all respect upto the entire satisfaction of Engineer-in-Charge of work. Make as per list attached | 2 | Each | 13,700 ₹27,400 Lowest |
| 5.00 | Supply, installation, testing and commissioning of Heavy duty PN-16 Butterfly valve of capacity 250 MM Gear operated type with counter flanges, fittings, nut bolts, gasket etc. duty insulated with 75mm EPS and Al. cladding including all labour and petty material required to complete the job in all respect upto the entire satisfaction of Engineer-in-Charge of work. Make as per list attached | 2 | Each | 35,100 ₹70,200 Lowest |
| 6.00 | Supply, installation, testing and commissioning of Heavy duty PN-16 Butterfly valve of capacity 350 MM Gear operated type with counter flanges, fittings, nut bolts, gasket etc. duty insulated with 75mm EPS and Al. cladding including all labour and petty material required to complete the job in all respect upto the entire satisfaction of Engineer-in-Charge of work. Make as per list attached | 2 | Each | 87,000 ₹1,74,000 Lowest |
| 7.00 | Cutting modification, repairing / replacing piping with fittings and insulation there off to match existing work including all labour and petty material required to complete the job in all respect upto the entire satisfaction of Engineer-in-Charge of work. | 1 | Job | 21,000 ₹21,000 Lowest |
| 8.00 | Supply, installation, testing and commissioning of digital Temperature indicators with all fittings including fixing socket/ thermowell in existing pipe and repair / replacement of piping and its insulation to match existing work including all labour and petty material required to complete the job in all respect upto the entire satisfaction of Engineer-in-Charge of work. Make as per list attached | 8 | Each | 9,100 ₹72,800 Lowest |
| 9.00 | Supply, installation, testing and commissioning of 100mm Dia S.S Pressure gauges with syphon, fittings, cutting, welding sockets etc. as required repairing /replacing to restore to original including all labour and petty material required to complete the job in all respect upto the entire satisfaction of Engineer-in-Charge of work. Make as per list attached | 10 | Each | 5,000 ₹50,000 Lowest |
| 10.00 | Replacement 100mm x 100mm digital ammeters at existing main panel with new connection for main panel including all labour and petty material required to complete the job in all respect upto the entire satisfaction of Engineer-in-Charge of work. Make as per list attached | 15 | Each | 5,300 ₹79,500 Lowest |
Tender Value
₹43.4 L
EMD Value
₹86,820
Closing Date
19 Aug 2025, 5:00 pmClosed
NAVEEN RATHEE
ED - Ambala
Special Repair/ Upgradation of E.I in the Civil Hospital (Block-A, B, C and D), Sec.-6, Panchkula. (Upgradation / Special Repair of Existing 3 x 300 Tr. Water Chilling Units Plant with Primary / Secondary Pumps and Hot Water Generator Only) (Recall)
2025_HRY_463399_1
2025BF62F4A6 D9DE 4DA4 ABB8 DA017741B93D663BAR
Open Tender
Civil Works
Works
250 days
Ambala Cantt
Special Repair/ Upgradation of E.I in the Civil Hospital (Block-A, B, C and D), Sec.-6, Panchkula. (Upgradation / Special Repair of Existing 3 x 300 Tr. Water Chilling Units Plant with Primary / Secondary Pumps and Hot Water Generator Only) (Recall)
2 documents required · 2 mandatory
₹5,000
₹86,820
Yes
17 Sept 2025
6 Aug 2025
20 Aug 2025
7 Aug 2025
19 Aug 2025
7 Aug 2025
Amount
Supply, installation, testing and commissioning of electric Hot Water Generator with sufficient number of electric immersion heaters. Capacity 500 KW in 6 steps. Hot Water Generator shall be made of 8mm M.S with dish end of 10mm M.S. duly lined with 16q stainless steel lining. The shall be insulated with 75mm thick resin bonded insulation of 24 kg/cum density finished with 1.25mm Al. cladding. The electric panel suitable incoming and outgoing switchgear for heaters, automatic controls, relays ON/OFF thermostat etc. including all labour and petty material required to complete the job in all respect upto the entire satisfaction of Engineer-in-Charge of work. Make as per list attached
Supply, installation, testing and commissioning of size 200MM IN / OUT Heavy class M.S. Piping with 75mm EPS insulation and 24G Al. cladding and all fittings including all labour and petty material required to complete the job in all respect upto the entire satisfaction of Engineer-in-Charge of work. Make as per list attached
Supply, installation, testing and commissioning of size 250MM IN / OUT Heavy class M.S. Piping with 75mm EPS insulation and 24G Al. cladding and all fittings including all labour and petty material required to complete the job in all respect upto the entire satisfaction of Engineer-in-Charge of work. Make as per list attached
Supply, installation, testing and commissioning of Heavy duty PN-16 Butterfly valve of capacity 200 MM Lever operated type with counter flanges, fittings, nut bolts, gasket etc. duty insulated with 75mm EPS and Al. cladding including all labour and petty material required to complete the job in all respect upto the entire satisfaction of Engineer-in-Charge of work. Make as per list attached
Supply, installation, testing and commissioning of Heavy duty PN-16 Butterfly valve of capacity 250 MM Gear operated type with counter flanges, fittings, nut bolts, gasket etc. duty insulated with 75mm EPS and Al. cladding including all labour and petty material required to complete the job in all respect upto the entire satisfaction of Engineer-in-Charge of work. Make as per list attached
Supply, installation, testing and commissioning of Heavy duty PN-16 Butterfly valve of capacity 350 MM Gear operated type with counter flanges, fittings, nut bolts, gasket etc. duty insulated with 75mm EPS and Al. cladding including all labour and petty material required to complete the job in all respect upto the entire satisfaction of Engineer-in-Charge of work. Make as per list attached
Cutting modification, repairing / replacing piping with fittings and insulation there off to match existing work including all labour and petty material required to complete the job in all respect upto the entire satisfaction of Engineer-in-Charge of work.
Supply, installation, testing and commissioning of digital Temperature indicators with all fittings including fixing socket/ thermowell in existing pipe and repair / replacement of piping and its insulation to match existing work including all labour and petty material required to complete the job in all respect upto the entire satisfaction of Engineer-in-Charge of work. Make as per list attached
Supply, installation, testing and commissioning of 100mm Dia S.S Pressure gauges with syphon, fittings, cutting, welding sockets etc. as required repairing /replacing to restore to original including all labour and petty material required to complete the job in all respect upto the entire satisfaction of Engineer-in-Charge of work. Make as per list attached
Replacement 100mm x 100mm digital ammeters at existing main panel with new connection for main panel including all labour and petty material required to complete the job in all respect upto the entire satisfaction of Engineer-in-Charge of work. Make as per list attached
Replacing high efficiency fills for 375TR Cooling tower after dismantling and reassembling to bring the tower in original shape. Disposing off old fill and clear the site including all labour and petty material required to complete the job in all respect upto the entire satisfaction of Engineer-in-Charge of work.
Extension of IN/OUT M.S. pipes headers for future stand-by 375 TR tower with fittings and deadend painting of the same, with suitable supports. 450mm x 8mm thick including all labour and petty material required to complete the job in all respect upto the entire satisfaction of Engineer-in-Charge of work. Make as per list attached.
Replacements of existing butterfly valve of capacity 250mm PN-16 (Gear Operated) with new efficient and operational easy valves including cutting / rewelding and fittings / flanges including all labour and petty material required to complete the job in all respect upto the entire satisfaction of Engineer-in-Charge of work. Make as per list attached
Replacements of existing butterfly valve of capacity 100mm PN-16 lever operated with new efficient and operational easy valves including cutting / rewelding and fittings / flanges including all labour and petty material required to complete the job in all respect upto the entire satisfaction of Engineer-in-Charge of work. Make as per list attached
Replacements of existing butterfly valve of capacity 50mm ball valve (PN 25 ) SS handle with new efficient and operational easy valves including cutting / rewelding and fittings / flanges including all labour and petty material required to complete the job in all respect upto the entire satisfaction of Engineer-in-Charge of work. Make as per list attached
Replacement of existing butterfly valve 40mm ball valve (PN 25 ) SS handle with new efficient and operational easy valves including cutting / rewelding and fittings / flanges including all labour and petty material required to complete the job in all respect upto the entire satisfaction of Engineer-in-Charge of work. Make as per list attached
Supply , installation, testing and commissioning of primary chilled/hot water pump set direct coupled 2736 LPM/10M as stand by including valve IN/OUT 8` = 2 Nos, Non return valve =1 No and Stainer = 1 No. Make as per list attached
Supply , installation, testing and commissioning of 10000 CFM/40mm SP double skin package Air washer of G.I. Const. 06 mm inner/outer skin with PUF Panel 23 ± 2mm thickness, DIDW Blower with motor, drive set, acetate paper, cooling pad of high efficiency, pump and connections including all labour and petty material required to complete the job in all respect upto the entire satisfaction of Engineer-in-Charge of work. Make as per list attached
Supply , installation, testing and commissioning of 2500 CFM/15MM tube Axial galvanised casing blowers with motor and provession for cable connection with louvers and bird screen including all labour and petty material required to complete the job in all respect upto the entire satisfaction of Engineer-in-Charge of work. Make as per list attached
Supply and Erection of 22 gauge G.I Duct duly insulated with 13mm nitrile insulation fire reterant covered with glass paper and star bond compound UV.reflacted colour including all labour and petty material required to complete the job in all respect upto the entire satisfaction of Engineer-in-Charge of work. Make as per list attached
Supply and Erection of Single lover supply air grills power coated including all labour and petty material required to complete the job in all respect upto the entire satisfaction of Engineer-in-Charge of work. Make as per list attached
Supply and laying of Aluminium Armoured Cable 240 Sqmm x 3.5 Core with 25x5 G.I strip with double earthing and connections at both ends laying our new / existing cable trays including all labour and petty material required to complete the job in all respect upto the entire satisfaction of Engineer-in-Charge of work. Make as per list attached
Supply and laying of Aluminium Armoured Cable 16 Sqmm x 3 Core with 8 SWG Wire (2x20) with double earthing and connections at both ends laying our new / existing cable trays including all labour and petty material required to complete the job in all respect upto the entire satisfaction of Engineer-in-Charge of work. Make as per list attached
Replacement / Modification of existing feeders or new space with new contactor and switchgear where required including all labour and petty material required to complete the job in all respect upto the entire satisfaction of Engineer-in-Charge of work. For C/T motors to DOL starter = 3 Sets For pump 11.3 kw to S/D starter = 1 No For Air washer/ tube axial fans = 4 No. Make as per list attached
Supply and laying of copper conductor control cable 4x1.5 sqmm on existing / new trays including all labour and petty material required to complete the job in all respect upto the entire satisfaction of Engineer-in-Charge of work. Make as per list attached
Redressing existing double 6sqmm copper cables from existing main panel to C/T motors with 3 pole isolators (new) at C/T including all labour and petty material required to complete the job in all respect upto the entire satisfaction of Engineer-in-Charge of work.
Life expectancy its incarese by over hauling chiller lubricant / gas by decompressing refrigerant cleaning the system and recharging refrigerant / lubricant for top-up as required including all labour and petty material required to complete the job in all respect upto the entire satisfaction of Engineer-in-Charge of work.
Minor civil work i.e Foundation for new Equipment and modification of Vantilator of the plant room with frame for duct shoots/grill and Exhaust Blower including all labour and petty material required to complete the job in all respect upto the entire satisfaction of Engineer-in-Charge of work.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .