| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.9 CrAdmitted-Finance 0 0 PIPRAICH GORAKHPUR GORAKHPUR UTTAR PRADESH 273152 | GORAKHPUR | UTTAR PRADESH | 273152 | -16.00% | ₹2.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.2 Cr+₹29.4 L (10.3%)Admitted-Finance JAIN SADAN MAHAL ROAD SHIVPURI DISTT SHIVPURI MP | SHIVPURI | SHIVPURI | MADHYA PRADESH | -7.36% | ₹3.2 Cr+₹29.4 L (10.3%) | L2 | Admitted-Finance |
| 3 | L3₹3.4 Cr+₹50.6 L (17.7%)Admitted-Finance | -1.15% | ₹3.4 Cr+₹50.6 L (17.7%) | L3 | Admitted-Finance |
| 4 | L4₹3.4 Cr+₹50.8 L (17.7%)Admitted-Finance | -1.10% | ₹3.4 Cr+₹50.8 L (17.7%) | L4 | Admitted-Finance |
Tender Value
₹3.4 Cr
EMD Value
₹8.0 L
Closing Date
18 May 2026, 5:00 pmClosed
GM-CIVIL
SECTOR-6, NOIDA
M/o Road (Repairing roads behind NIB Police chowki Near Overhead water Tank 21/62 UPPCL sub staion sector-62 and other misc work in sector-62) Noida
2026_NOIDA_1145207_1
15/GM(C)/SM(WC-4)/ET/2026-27
Open Tender
Civil Works - Others
Fixed-rate
120 days
NOIDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,310
NOIDA
₹8.0 L
11 Jun 2026
4 May 2026
19 May 2026
4 May 2026
18 May 2026
4 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. 304 (3.13-ib) | 661 | Cum | 144.95 | ₹95,811.95 |
| 2 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge: All kinds of soil. | 4,425 | Sqm | 20.26 | ₹89,650.5 |
| 3 | Cement Concrete with 4 cm gauge approved stone ballast, coarse sand & Cement in the proportion of 8:4:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of work | 473 | Cum | 5,820 | ₹27,52,860 |
| 4 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 (4.1) 400-1) B By Mix in Place Method | 826 | Cum | 4,093.5 | ₹33,81,231 |
| 5 | Providing and laying design mix cement concrete of M-30 grade, in roads/ taxi tracks/ runways, using cement content as per design mix, using coarse sand and graded stone aggregate of 40 mm nominal size in appropriate proportions as per approved & specified design criteria, providing dowel bars with sleeve/ tie bars wherever required, laying at site, spreading and compacting mechanically by using needle and surface vibrators, levelling to required slope/ camber, finishing with required texture, including steel form work with sturdy M.S. channel sections, curing, making provision for contraction/expansion, construction & longitudinal joints (10 mm wide x 50 mm deep) by groove cutting machine, providing and filling joints with approved joint filler and sealants, complete all as per direction of Engineer-in-charge (Item of joint fillers, sealants, dowel bars with sleeve/ tie bars to be paid separately). Note:- Cement content considered in M-30 is @ 340 kg/cum. Excess/less cement used as per design mix is payable/ recoverable separately. Cement concrete prepared with batch mixing machine | 1,058 | Cum | 7,996.31 | ₹84,60,095.98 |
| 6 | Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying , excluding the cost of centering, shuttering finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as perdirection of the Engineer-in-charge.(Note :- Cement content considered in this item is @ 330 kg/ cum.Excess/less cement used as per design mix isyable/recoverable separately).All works upto plinth level | 279 | Cum | 7,912.32 | ₹22,07,537.28 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for :Foundations, footings, bases of columns, etc. for mass concrete | 212 | Sqm | 181.64 | ₹38,507.68 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for :Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 1,367 | Sqm | 335.55 | ₹4,58,696.85 |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo- Mechanically Treated bars of grade Fe-500D or more. | 20,940 | Kg | 82.81 | ₹17,34,041.4 |
| 10 | Providing and placing in position 100 mm thick factory made machine batched & machine mixed Precast RCC Rectangular Covers on drains of footpath of various sizes, of M-25 grade cement concrete for RCC work, including cost of centering, shuttering, reinforcement of 8 mm dia TMT bars of Fe 500 grade @ maximum 100mm c/c on both ways , neat cement punning on finished surface, properly encased on all edges with 1.6 mm thick , 100 mm wide MS sheet duly painted over priming coat , reinforcement to be welded at edges with MS sheet and providing 2 Nos. 12 mm dia bar for hooks etc i/c cost of cartage, all leads & lift, handling at site etc. all complete as per direction of Engineer-in-Charge | 2,447 | Sqm | 2,222.1 | ₹54,37,478.7 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.07 MB
TD15.pdf
Tender Documents • 5.82 MB
BOQ_2140516.xls
BOQ • 0.26 MB
Capability15.xls
Additional Documents • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .