| 1 | Admitted-Fee/PreQual/Technical/Finance KAYYUR ROAD JUNCTION CHERUVATHUR PO KASARAGOD DIST | CHERUVATHUR | KASARAGOD | KERALA | 671313 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹12,000
Closing Date
15 May 2023, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DGM PP
PROJECTS AND PLANNING DEPT., FACT LTD., UC
Guniting of damaged RCC structures at various locations in Ammonia plant during ATA-2023 in FACT-UC.
2023_FACT_749788_1
03009/2023-2024/E27227
Open Tender
Civil Works
Item Rate
60 days
UDYOGAMNDAL
Please refer Tender documents.
7 documents required · 7 mandatory
₹50
Yes
FACT LTD
₹12,000
Yes
16 May 2023
20 Apr 2023
16 May 2023
20 Apr 2023
15 May 2023
20 Apr 2023
Amount
Guniting of damaged RCC structures at various locations in Ammonia plant during ATA-2023 in FACT-UC.
Chipping and removing portions of existing RCC work carefully without damaging the remaining structure and removing the debris at places pointed outwithin a distance of 150M and reclaiming the steel reinforcement and stacking the same at places as per instructions.
Cleaning the exposed surfaces of reinforcement bars embedded in the concrete at different heights with wire brush and applying two coats of epoxy zinc rich primer equivalent to Nitozinc primer as per instruction ( Payment will be made only for the treated surface area of reinforcement bars.)
Guniting the RCC/masonry structures after chipping the existing surfaces, removing the scales in the rusted rods , cleaning the surface with air and water under pressure, providing one layer 50 x 50 x 3mm (or nearest) weld mesh fabric as reinforcement and guniting with cement mortar 1:3 (one part of cement and 3 parts of sand) for an average thickness of 40mm including Providing scaffolding with all necessary materials, levelling the top surfaces ,finishing, curing and all other incidental charges etc. complete. The waste materials should be collected and disposed at places pointed out daily. The cost is inclusive of all materials like sand, weld mesh, hire for compressor gun, fuel/diesel, labour, scaffolding, curing etc. but excluding cost of cement (cement alone will be issued free of cost by the company at our stores.) Utmost care should be taken for controlling the consumption of cement. Recovery at doubel the issue rate will be effected on the cement consumed excess of the approved requirement.
Guniting the existing concrete/masonry surfaces after chipping, removing the scales in the rusted rods , cleaning the surface by air and water under pressure with cement mortar 1:3 (one part of cement and 3 parts of sand) for an average thickness of 15mm including levelling the top surfaces finishing, curing and all other incidental charges etc. complete including providing scaffolding with all necessary materials, . The waste materials should be collected and disposed at places pointed out daily. The cost is inclusive of all materials like sand, hire for compressor gun, fuel/diesel, labour, scaffolding, curing etc. but excluding cost of cement (cement alone will be issued free of cost by the company at our stores. Utmost care should be taken for controlling the co sumption of cement. Recovery at double the issue rate will be effected on the cement consumed excess of the approved requirement.
Providing anti corrosive coatings to the gunited surfaces at all heights consisting of first coat with "Pro Epishield Floor Sealer" & second coat with "EPILUX 950 SUPER HIBUILD" of Berger or any other equivalent of approved quality and colour after cleaning the surface thoroughly by removing all loose particles ,dust etc. including cost of all materials labour charges scaffolding, removal of waste materials etc. Each coat should have distinctive colour shades to ensure that the entire surface is covered under each coat. Allow sufficient drying period in between coats as recommended by the manufacturer.
Providing reinforcement to RCC works at all levels with MS or deformed bars including all charges for uncoiling and straightening rods, cutting rods, bending cold, placing in position and tying with tying wire of suitable gauge etc.complete.( Only Reinforcement Rods will be issued free of cost by the company )
stage.html
html • 0.02 MB
finance_788300.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .