| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 LAccepted-AOC | L1 | Accepted-AOC Lowest | |
| 2 | L 2₹3.6 L+₹3,815.53 (1.07%)Rejected-Finance 10061941 ARYA REMA DISTRICT PANCHAYAT IDUKKI | IDUKKI | KERALA | 685501 | L 2 | Rejected-Finance L2 | |
| 3 | L3₹4.2 L+₹67,356.95 (18.9%)Rejected-Finance BENNY BHAVAN PALIYODE KOTTAKKAL ASSISTANT ENGINEER LSGD KOLLAYIL GRAMA PANCHAYATH 0202 SUB TREASURY NEYYATTINKARA | THIRUVANANTHAPURAM | KERALA | 695001 | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | DHANEESH T L2 | Sajith D L3 | AJITHKUMAR M L1 |
|---|---|---|---|---|---|---|
| 1.00Bore well & Drinking water Facilities | ||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 1.44 | cum | 312.57 ₹450.1 | 367.72 ₹529.52 | 309.25 ₹445.32 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 0.14 | cum | 6,892.8 ₹992.56 | 8,109.18 ₹1,167.72 | 6,819.82 ₹982.05 Lowest |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.3 | cum | 9,113.58 ₹11,811.2 | 10,721.86 ₹13,895.53 | 9,017.08 ₹11,686.14 Lowest |
| 1.00 | 10.2:Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 609.33 | kg | 122.01 ₹74,344.35 | 143.53 ₹87,457.13 | 120.71 ₹73,552.22 Lowest |
| 1.00 | 50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 220.65 | kg | 162.52 ₹35,859.39 | 191.2 ₹42,187.52 | 160.8 ₹35,479.88 Lowest |
| 1.01 | OD194485/2025-2026:Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.350 mm (+0.05%), total coated thickness with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineer-in-charge. The sheet shall be fixed using self drilling/self tapping screws of size (5.5x55mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. | 19.44 | sqm | 532.45 ₹10,350.83 | 626.41 ₹12,177.41 | 526.81 ₹10,241.19 Lowest |
| 1.01 | OD194486/2025-2026:Providing and fixing precoated galvanised iron profile sheets (size,shape and pitch of corrugation as approved by Engineer-in-charge) 0.35 mm (+0.05%) total coated thickness with zink coating 120 grams per sqm as per IS:277, in 240 mpa grade, 5-7 microns epoxy primer on both side. of the steel and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineer -in -charge. the sheet shall be fixed using self drilling/ self tapping screws of size (5.5 x 55 mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. | 3 | sqm | 491.16 ₹1,473.48 | 577.84 ₹1,733.52 | 485.96 ₹1,457.88 Lowest |
| 1.01 | 13.52.1:Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work | 17.1 | sqm | 219.78 ₹3,758.24 | 258.57 ₹4,421.55 | 217.46 ₹3,718.57 Lowest |
| 1.01 | 18.48:Providing and placing on terrace (at all floor levels) polyethylene water storage tank :ISI 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank. | 1,000 | Litre | 10.56 ₹10,560 | 12.42 ₹12,420 | 10.45 ₹10,450 Lowest |
Tender Value
₹4.2 L
EMD Value
₹10,592
Closing Date
10 Sept 2025, 6:55 pmClosed
AE LSGD
AE LSGD,Perumkadavila BP
Perumkadavila BP (64/2025-26) CONSTRUCTION OF BORE WELL IN MSC LPS KOODAYAAL CHERIYA KOLLA- PANACHAMOODU DIVISION
2025_LSGD_794468_7
07/AE/LSGD/PBP/2025-26
Open Tender
Civil Works - Water Works
Item Rate
180 days
Perumkadavila
Please refer Tender documents.
7 documents required · 7 mandatory
₹935
Yes
₹10,592
Yes
27 Oct 2025
3 Sept 2025
12 Sept 2025
3 Sept 2025
10 Sept 2025
3 Sept 2025
3 Sept 2025 - 10 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .