| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.3 LAccepted-AOC 00 MEERANPUR SADARALI FAREEDPUR KALAN TANDA AMBEDKAR NAGAR UTTAR PRADESH 224145 UDYAM UP 04 0001727 | AMBEDKAR NAGAR | UTTAR PRADESH | 224145 | ₹16.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹16.4 LRejected-AOC BILASPUR TEHSIL BILASPUR DISTRICT RAMPUR UTTAR PRADESH | BILASPUR | RAMPUR | UTTAR PRADESH | ₹16.4 L | L2 | Rejected-AOC L2 |
| 3 | L3₹16.4 LRejected-AOC MOHALLA BAZAR KALAN BILASPUR BILASPUR BILASPUR RAMPUR UTTAR PRADESH 244921 UDYAM UP 63 0007724 09HFJPS3377K2ZH R M | RAMPUR | UTTAR PRADESH | 244921 | ₹16.4 L | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | Rohit Contractor & Suppliers L3 | M/S MUZAKKIR HUSAIN CONTRACTOR L2 | BHARAT CONSTRUCTION L1 |
|---|---|---|---|---|---|---|
| 1.00MRF Centre par kuda nistaran ke liye Tromal Machine lagane hetu foundation ka nirman karya (As per Estimate) | ||||||
| 1.01 | Earth work in foundation or embankment in ordinary soil including earth from 5 km to the site. chap‑04 sr no.251 | 32.49 | Nos | 200 ₹6,498 | 200 ₹6,498 | 198 ₹6,433.02 |
| 1.02 | Earth work in filling or embankment in ordinary soil including earth from 5 km to the site. chap‑04 sr no.252 | 570 | Nos | 200 ₹1.1 L | 200 ₹1.1 L | 198 ₹1.1 L |
| 1.03 | Cement concrete work in 1:3:6 using brick ballast with fine sand of 1.25 FM and cement in 1:2:6:1 stone including labour material T&P incl all compl. (SR NO.279) | 4.64 | Nos | 3,650 ₹16,936 | 3,650 ₹16,936 | 2,649 ₹12,291.36 |
| 1.04 | M‑150 brick work in 1:4 cement and coarse sand mortar including all cost of materials labour and T&P etc required for proper completion of work sr.no.305 | 26.1 | Nos | 5,110 ₹1.3 L | 5,110 ₹1.3 L | 5,110 ₹1.3 L |
| 1.05 | 12 mm thick plaster in 1:4 cement coarse sand and mortar over brick work including all cost of materials labour and T&P etc required for proper completion of work (sr. no.584) | 180 | Nos | 204 ₹36,720 | 204 ₹36,720 | 204 ₹36,720 |
| 1.06 | Concrete with 20m gauge stone ballast coarse sand of 1.25 FM and cement proportion 1:4:2 including supply of all materials labour and T&P etc required for proper completion of work (279) | 0.58 | Nos | 7,400 ₹4,292 | 7,400 ₹4,292 | 7,400 ₹4,292 |
| 1.07 | Concrete with 4 cm gauge stone ballast with fine sand of 2.25 FM and cement in 1:2:6:1 in foundation including supply labour material T&P incl all compl. (SR NO.279A) | 48 | Nos | 4,950 ₹2.4 L | 4,950 ₹2.4 L | 4,950 ₹2.4 L |
| 1.08 | RCC WORK 1:1.5:3 with contractor's approved coarse sand 2.0 mm guage stone grit etc including centering & shuttering etc all compl of work. (SR NO.283) | 75 | LTR | 8,300 ₹6.2 L | 8,300 ₹6.2 L | 8,300 ₹6.2 L |
| 1.09 | Mild steel for work in plain work such as RCC or RB work including bending for proper shape and including supply of steel and its wastage & authorised overlapping shall be measured. (SR No.504) | 58.5 | Nos | 7,796 ₹4.6 L | 7,794 ₹4.6 L | 7,796 ₹4.6 L |
Tender Value
₹18.5 L
EMD Value
₹37,000
Closing Date
23 Feb 2026, 3:00 pmClosed
EO NPP Bilaspur
Office Of the Nagar Palika parishad Bilaspur
MRF Centre par kuda nistaran ke liye Tromal Machine lagane hetu foundation ka nirman karya (As per Estimate)
2026_DOLBU_1115473_1
822/nppb/2025-2026/15van-2
Open Tender
Civil Works
120 days
Bilaspur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,124
Executive Officer
₹37,000
9 Mar 2026
13 Feb 2026
23 Feb 2026
13 Feb 2026
23 Feb 2026
13 Feb 2026
MRF Centre par kuda nistaran ke liye Tromal Machine lagane hetu foundation ka nirman karya (As per Estimate)
Earth work in foundation or embankment in ordinary soil including earth from 5 km to the site. chap‑04 sr no.251
Earth work in filling or embankment in ordinary soil including earth from 5 km to the site. chap‑04 sr no.252
Cement concrete work in 1:3:6 using brick ballast with fine sand of 1.25 FM and cement in 1:2:6:1 stone including labour material T&P incl all compl. (SR NO.279)
M‑150 brick work in 1:4 cement and coarse sand mortar including all cost of materials labour and T&P etc required for proper completion of work sr.no.305
12 mm thick plaster in 1:4 cement coarse sand and mortar over brick work including all cost of materials labour and T&P etc required for proper completion of work (sr. no.584)
Concrete with 20m gauge stone ballast coarse sand of 1.25 FM and cement proportion 1:4:2 including supply of all materials labour and T&P etc required for proper completion of work (279)
Concrete with 4 cm gauge stone ballast with fine sand of 2.25 FM and cement in 1:2:6:1 in foundation including supply labour material T&P incl all compl. (SR NO.279A)
RCC WORK 1:1.5:3 with contractor's approved coarse sand 2.0 mm guage stone grit etc including centering & shuttering etc all compl of work. (SR NO.283)
Mild steel for work in plain work such as RCC or RB work including bending for proper shape and including supply of steel and its wastage & authorised overlapping shall be measured. (SR No.504)
Construction of masonry open drain with BWN with 1:4 in 1.20m wide wall 32 to 35 cm thickness & 1.35m height above GL. Plaster in 1:4 as per drawing attached including cost of painting of letters on masonry drain including all materials labour and T&P etc.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.29 MB
BOQ_2069754.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid