Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.8 LAdmitted-Fee/PreQual/Technical/Finance | -21.00% | ₹7.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹8.3 L+₹48,486.34 (6.20%)Admitted-Fee/PreQual/Technical/Finance | -16.10% | ₹8.3 L+₹48,486.34 (6.20%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹9.3 L+₹1.5 L (19.4%)Admitted-Fee/PreQual/Technical/Finance | -5.67% | ₹9.3 L+₹1.5 L (19.4%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹9.9 L+₹2.1 L (26.5%)Admitted-Fee/PreQual/Technical/Finance | -0.05% | ₹9.9 L+₹2.1 L (26.5%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹9.9 L
EMD Value
₹19,800
Closing Date
28 Jul 2026, 4:00 pmClosed
Executive Engineer
Hydraulic Division Uri
Construction and Improvements to Mastan Bandi Shadra Irrigation Khul at Kamalkote at spots.
2026_IFC_316166_5
eNIT No. 06/Hyd/Uri of 2026-27
Open Tender
Civil Works
Percentage
25 days
Uri
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer Hydraulic Division Uri
₹19,800
7 Aug 2026
15 Jul 2026
29 Jul 2026
15 Jul 2026
28 Jul 2026
15 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: | |||||
| 1.1 | In all kinds of soils | - | Cum | - | - |
| 2 | Providing and laying of dry stone soling | - | Cum | 1 | - |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | - | Cum | 1 | - |
| 4Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | |||||
| 5Centering and shuttering including strutting, propping etc. and removal of form for: | |||||
| 5.1 | Foundations, footings, bases of columns etc. for mass concrete. | - | Sqm | - | - |
| 6Supply, Fabrication and Installation, alligning, testing and commissioning of MS Pipes 200mm dia, 5mm thick as per specification including cutting, welding, laying etc complete. | |||||
| 7CARRIAGE OF MATERIALS by Mechanical Transport including loading, unloading and stacking complete | |||||
| 7.1 | Stone Agg. 40mm avg lead of 90Kms | - | Cum | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
BOQ_1029842.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .