Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 LAccepted-AOC | ₹5.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹6.9 LRejected-Finance | ₹6.9 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | NISSAR P.A. L1 | M.P. ABDUL NAZER KURIKKAL L2 |
|---|---|---|---|---|---|
| 1.00TARRING AND RETARRING | |||||
| 1.00 | 5.2.1a:Tack Coat<br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 1,429.95 | sqm | 13.73 ₹19,633.21 | 23.73 ₹33,932.71 |
| 1.00 | 5.5.A.1a:Modified Penetration Macadam 50 mm thick using Bitumen S-65 <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 136.5 | sqm | 295.49 ₹40,334.39 | 395.05 ₹53,924.33 |
| 1.00 | 5.5.B.2a:Modified Penetration Macadam 75 mm thick using Bitumen S-65 <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. <br> (B) 75 mm thick :- (II) Bitumen (S-65) | 143.25 | sqm | 382.21 ₹54,751.58 | 482.21 ₹69,076.58 |
| 1.00 | 5.11.1.A.2a:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 <br> Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 <br> By Manual Means :- Type A <br> (II) Bitumen (S-65) | 1,429.95 | sqm | 275.36 ₹3.9 L | 375.36 ₹5.4 L |
Tender Value
₹5.1 L
EMD Value
₹12,712
Closing Date
3 Nov 2025, 5:00 pmClosed
Asst.Engineer
Municipal office Manjeri
Annual Plan-Manjeri municipality 2025-26 Project No - 1007-Maintanance of Palli road puthukudi anganavaadi roadmecheri road-General Civil Work
2025_LSGD_815389_53
2716147/25/7
Open Tender
Civil Works - Roads
300 days
Manjeri
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,125
Yes
₹12,712
Yes
4 Jun 2026
28 Oct 2025
5 Nov 2025
28 Oct 2025
3 Nov 2025
28 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1367159.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
BOQ_1367159.xls
BOQ • 0.30 MB
viewnit.pdf
Tender Documents • 0.03 MB
viewsbd.pdf
Tender Documents • 1.63 MB
Download all tender documents and submit your bid