Executive Engineer, Petlad Irrigation Division Petlad
Clearing the silt & debries from various drain & Structure of khambhat taluka , Dist:- Anand under package No : 11 ( No of Drain : 09 )
289286
23 of 2025-2026
Open
Miscellaneous Works
Anand
7 documents required · 6 mandatory · 1 optional
₹900
Yes
Executive Engineer Petlad Irrigation Division Petlad
₹20,000
Yes
25 Mar 2026
25 Mar 2026
25 Mar 2026
8 Apr 2026
25 Mar 2026
Bill Of Quantities
Memorandum showing items of works to be carried out
NAME OF Clearing the silt & debries from various drain & Structure of Khambhat taluka
WORK : , Dist:- Anand under package No : 11 ( No of Drain : 9 )
Quantity Estimated rate Total
estimated amount
but may Item of work Rs. in Rs. in Unit accoarding
be more figs. words to estimated
or less quantities
Item No. 1 Clearing the shrubs, like akadas,
weeds and other vegetables including Rs.
depositing the same outside and burning etc. Fourteen
complete from canal bed, top and both slopes Thousand
of the banks, for canal with discharge. Lateral Four
& Sub lateral Drain Hundred
Item No 2 Clearing the silt from the drain bed
by digging the same to the required bed level
and gradient including depositing the
excavated earth regularly in spoil bank for Rs. Forty
utilizing the same preparing the banks after One &
2 35335.00 breaking clods as and where directed for lead 41.30 CM
upto 50 m. and all lifts. FOR MAIN, LATERAL Only
& SUB-LATERAL DRAINS. (BY MACHINERY
Item No 3 Clearing the Silt /Debries from the
pipe culvert / Syphon /syphon well . Under
ground pipe drain/box drain for drin/Canal by Rs. Six
digging the same including depositing the Hundred
3 220.00 excavated earth /debries etc.for all leads and 664.20 Sixty Four CM
lift . (A) For Pipe Culvert / Syphone. (ii) Above & Twenty
900 mm dia.Pipe Paise Only
Rs. Nineteen Lacs Twenty three thousands one thirty nine rupees and fifty Paise Only
I / We am / are willing to carry out the work at………………..% above / below precent.
(Should be written in figure and words) of the estimate reates mentioned above.
Amount of my / our tender works out as under.
Estimated amount put Estimated amout put
to tender Rs……………. to tender Rs……………..
Deduct …………..% Add………………%
below Rs………… Above Rs……………
Net Rs……………….. Total Rs…………….
In words…………………………….. In words………………
Notes 1 - The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for which
no extra payment shall be made.
Notes 2 - The labour cess will be deducted as per prevailing rules i.e.1% of the work done.
Notes 3 - GST and Income tax TDS will be deducted at a source while making payments of bills
Note 4 - In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt.G.R.:PRC-10/2017 Cement
Consumption / 16 / CDate: 11/05/2017asstated in S.O.R. there fore in R.C.C. items where there is a change as per actual mix design the
cost of difference of cement consumption have been deducted from the rate of original item at the rate of input rate mentioned in all the
Signeture of Contractor Deputy Executive Engineer
Drain Sub Division
Percentage Calculation Percentage Calculation
Name of work Clearing the silt & debries from various drain & Structure of Khambhat taluka , Dist:- Anand under package No : 11 ( No of Drain : 9 )
Quantity Item Rate Unit Total amount Labour Rs. Total Labour Cost Labour % Cement Total Cement % Steel per Total Steel Cost Steel % Bitumen Total Bitumen Bitumen % PoL Per Unit Total PoL cost PoL % Machinery Total Machinery % Other Total Other Other TOTAL Total Item Cost Total %
Quantity Item Rate Unit Total amount Labour Rs. Total Labour Cost Labour % Cement Total Cement % Steel per Total Steel Cost Steel % Bitumen Total Bitumen Bitumen % PoL Per Unit Total PoL cost PoL % Machinery Total Machinery % Other Total Other Other TOTAL Total Item Cost Total %
Estimated but according to Per Unit Per Unit Cement Cost Unit Per Unit Cost Per Unit Machinery Cost Comodity Comodity Comodity % cost per
Sr. No. may be more estimated Rs. Per Unit Cost Unit
Item No. 1 Clearing the shrubs,
like akadas, weeds and other
vegetables including depositing
the same outside and burning
etc. complete from canal bed, top
canal with discharge. Lateral &
Sub lateral Drain
Item No 2 Clearing the silt from
the drain bed by digging the
same to the required bed level
and gradient including depositing
the excavated earth regularly in
spoil bank for utilizing the same
preparing the banks after
directed for lead upto 50 m. and
all lifts. FOR MAIN, LATERAL &
SUB-LATERAL DRAINS. (BY
Item No 3 Clearing the Silt
/Debries from the pipe culvert /
Syphon /syphon well . Under
ground pipe drain/box drain for
drin/Canal by digging the same
including depositing the
all leads and lift . (A) For Pipe
Culvert / Syphone. (ii) Above
Signature of Contractor Deputy Executive Engineer Executive Engineer
Drain sub Division Petlad Irrigation Division
Khambhat Petlad
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Notice 23 of 2025-26 online.pdf
1 Front Page..pdf
2 Notice Inviting online Tender.pdf
3. New SBD Book final.pdf
4 Item Technical Specification-.pdf
5.- Other Spec. and Work site Condition.pdf
6. khas sarato.pdf
9. BOQ.pdf
Download all tender documents and submit your bid