| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹89.7 LAccepted-AOC | ₹89.7 L | L1 | Accepted-AOC Work Awarded to Sh. Rajinder Sharma |
| 2 | L2₹92.7 L+₹3.0 L (3.35%)Rejected-Finance | ₹92.7 L+₹3.0 L (3.35%) | L2 | Rejected-Finance Lowest 2 |
| 3 | L3₹1.0 Cr+₹11.1 L (12.4%)Rejected-Finance | ₹1.0 Cr+₹11.1 L (12.4%) | L3 | Rejected-Finance Lowest 3 |
| 4 | L4₹1.0 Cr+₹15.1 L (16.8%)Rejected-Finance | ₹1.0 Cr+₹15.1 L (16.8%) | L4 | Rejected-Finance Lowest 4 |
| 5 | L5₹1.1 Cr+₹16.4 L (18.3%)Rejected-Finance S O SH BHAWANI SINGH VPO BHRAIN TEHSIL BHUNTAR DISTT KULLU HP PIN 175125 | KULLU | HIMACHAL PRADESH | 175125 | ₹1.1 Cr+₹16.4 L (18.3%) | L5 | Rejected-Finance Lowest 5 |
| Sl No | Description | Qty | Unit | RANDHIR JAMWAL L5 | SOHAN LAL L2 | kotkandiconstructionpvt.ltd. L6 | durga parasd contruction L4 | JMM INFRACON L7 | Harish Bhutungru L3 | Rajender Sharma L1 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m Hard rock as per the diretion of Engineer in Charge at site. | 360.6 | Per Cubic Meter | 275 ₹99,165 | 130 ₹46,878 Lowest | 300 ₹1,08,180 | 170 ₹61,302 | 280 ₹1,00,968 | 250 ₹90,150 | 239 ₹86,183.4 |
| 2.00 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete as per the direction of Engineer-In-Charge including carriage of materials in all leads, lifts and heights. | 90 | Per Cubic Meter | 460 ₹41,400 | 1,000 ₹90,000 | 800 ₹72,000 | 875 ₹78,750 | 1,850 ₹1,66,500 | 800 ₹72,000 | 139 ₹12,510 Lowest |
| 3.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:2:4 (1 cement : 2 coarse sand) : 4 graded stone aggregate 20 mm nominal size) as per the dierction of Engineer-In-Charge including carriage of materials within all leads, lifts and heights. | 181.8 | Per Cubic Meter | 6,985 ₹12,69,873 | 6,000 ₹10,90,800 | 7,200 ₹13,08,960 | 7,805 ₹14,18,949 | 6,800 ₹12,36,240 | 6,000 ₹10,90,800 | 5,300 ₹9,63,540 Lowest |
| 4.00 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing 1:2:4 (1 Cement : 2 coarse sand) : 4 graded stone aggregate 20 mm nominal size) as per the dierction of Engineer-In-Charge including carriage of materials within all leads, lifts and heights. | 163.8 | Per Cubic Meter | 6,980 ₹11,43,324 | 5,800 ₹9,50,040 | 7,250 ₹11,87,550 | 8,585 ₹14,06,223 | 6,800 ₹11,13,840 | 6,000 ₹9,82,800 | 5,579 ₹9,13,840.2 Lowest |
| 5.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level 1:1.5:3 (1 cement : 1.5 coarse sand): 3 graded stone aggregate 20 mm nominal size) as per the dierction of Engineer-In-Charge including carriage of materials within all leads, lifts and heights. | 64.69 | Per Cubic Meter | 7,450 ₹4,81,940.5 | 7,000 ₹4,52,830 | 8,000 ₹5,17,520 | 8,585 ₹5,55,363.65 | 7,500 ₹4,85,175 | 8,000 ₹5,17,520 | 6,971 ₹4,50,953.99 Lowest |
| 6.00 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size) as per the dierction of Engineer-In-Charge including carriage of materials within all leads, lifts and heights. | 32.4 | Per Cubic Meter | 7,560 ₹2,44,944 | 7,500 ₹2,43,000 | 8,100 ₹2,62,440 | 8,885 ₹2,87,874 | 7,500 ₹2,43,000 | 8,500 ₹2,75,400 | 6,971 ₹2,25,860.4 Lowest |
| 7.00 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size) as per the dierction of Engineer-In-Charge including carriage of materials within all leads, lifts and heights. | 96.49 | Per Cubic Meter | 7,590 ₹7,32,359.1 | 7,500 ₹7,23,675 | 8,200 ₹7,91,218 | 8,885 ₹8,57,313.65 | 7,500 ₹7,23,675 | 8,500 ₹8,20,165 | 6,981 ₹6,73,596.69 Lowest |
| 8.00 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete as per the dierction of Engineer-In-Charge including carriage of materials within all leads, lifts and heights. | 226 | Per Square Meter | 295 ₹66,670 | 250 ₹56,500 | 220 ₹49,720 | 175 ₹39,550 | 470 ₹1,06,220 | 150 ₹33,900 Lowest | 215 ₹48,590 |
| 9.00 | Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
as per the dierction of Engineer-In-Charge including carriage of materials within all leads, lifts and heights. | 454.4 | Per Square Meter | 325 ₹1,47,680 | 300 ₹1,36,320 | 380 ₹1,72,672 | 375 ₹1,70,400 | 500 ₹2,27,200 | 200 ₹90,880 Lowest | 225 ₹1,02,240 |
| 10.00 | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform as per the dierction of Engineer-In-Charge including carriage of materials within all leads, lifts and heights. | 340 | Per Square Meter | 345 ₹1,17,300 | 300 ₹1,02,000 | 400 ₹1,36,000 | 375 ₹1,27,500 | 625 ₹2,12,500 | 250 ₹85,000 Lowest | 259 ₹88,060 |
Tender Value
₹1.0 Cr
EMD Value
₹2.1 L
Closing Date
16 Mar 2026, 11:00 amClosed
Executive Engineer
HPTDC Head Office Kashmir House Dharamshala
Restoration of damage due to heavy rain during July 2023 at HPTDC Workshop Aloo Ground Manali Distt. Kullu (H.P).
2026_HPTDC_129527_1
Proj./4-178/25-I
Open Tender
Civil Works
Item Rate
365 days
Aloo Ground Manali
Please refer Tender documents.
5 documents required · 5 mandatory
₹5,000
₹2.1 L
25 Jul 2026
24 Feb 2026
16 Mar 2026
24 Feb 2026
16 Mar 2026
24 Feb 2026
24 Feb 2026 - 16 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m Hard rock as per the diretion of Engineer in Charge at site. | 360.6 | Per Cubic Meter | 1.25 | ₹450.75 |
| 2 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete as per the direction of Engineer-In-Charge including carriage of materials in all leads, lifts and heights. | 90 | Per Cubic Meter | - | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:2:4 (1 cement : 2 coarse sand) : 4 graded stone aggregate 20 mm nominal size) as per the dierction of Engineer-In-Charge including carriage of materials within all leads, lifts and heights. | 181.8 | Per Cubic Meter | 100 | ₹18,180 |
| 4 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing 1:2:4 (1 Cement : 2 coarse sand) : 4 graded stone aggregate 20 mm nominal size) as per the dierction of Engineer-In-Charge including carriage of materials within all leads, lifts and heights. | 163.8 | Per Cubic Meter | 53 | ₹8,681.4 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level 1:1.5:3 (1 cement : 1.5 coarse sand): 3 graded stone aggregate 20 mm nominal size) as per the dierction of Engineer-In-Charge including carriage of materials within all leads, lifts and heights. | 64.69 | Per Cubic Meter | 10 | ₹646.9 |
| 6 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size) as per the dierction of Engineer-In-Charge including carriage of materials within all leads, lifts and heights. | 32.4 | Per Cubic Meter | 11 | ₹356.4 |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size) as per the dierction of Engineer-In-Charge including carriage of materials within all leads, lifts and heights. | 96.49 | Per Cubic Meter | 10 | ₹964.9 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete as per the dierction of Engineer-In-Charge including carriage of materials within all leads, lifts and heights. | 226 | Per Square Meter | 22 | ₹4,972 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
as per the dierction of Engineer-In-Charge including carriage of materials within all leads, lifts and heights. | 454.4 | Per Square Meter | - | - |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform as per the dierction of Engineer-In-Charge including carriage of materials within all leads, lifts and heights. | 340 | Per Square Meter | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
TenderNotice.pdf
Tender Documents • 0.12 MB
Contractagreement.pdf
Tender Documents • 1.36 MB
Sampleofworkdone.pdf
Tender Documents • 0.02 MB
technicalbiddingformat.pdf
Tender Documents • 0.06 MB
BOQ_191520.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .