Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 LAccepted-Finance 00 MAA KALI ENTERPRISE NEW ROAD KULTI BARDHAMAN WEST BENGAL 713343 | PASCHIM BARDHAMAN | WEST BENGAL | 713343 | L1 | Accepted-Finance L1 | |
| 2 | L2₹4.5 L+₹78,120.60 (21.0%)Rejected-Finance | L2 | Rejected-Finance Not L1 | |
| 3 | L3₹4.6 L+₹82,729.63 (22.2%)Rejected-Finance | L3 | Rejected-Finance Not L1 |
Tender Value
₹4.7 L
EMD Value
₹9,311
Closing Date
16 Sept 2026, 4:00 pmClosed
Executive Engineer
Araksha Bhawan 3rd Floor Block DJ Sector II Salt Lake City
Day to Day Electrical maintenance and repairing Works for DD Buildings, Lalbazar Campus under Kolkata Police for FY 2026 - 2027. (2nd Call)
2026_WBPHI_5022584_1
WBPHIDCL/EE-(HQ-I)/NIT- 46(e)/2026-2027
Open Tender
ELECTRICAL WORKS M/R
Percentage
Refer to NIT
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹9,311
Yes
13 Oct 2026
7 Sept 2026
18 Sept 2026
7 Sept 2026
16 Sept 2026
9 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Electrical (maintenance works)
Note : All the items of SOR of PWD Electrical works w.e.f 01.11.2017 including upto date addenda and corrigenda and the approved non schedule item of works (Including 18% GST & 1% labour cess) -
( The work shall continue of the entire contract period as per the requirement & as directed by the Engineer in charge . The payment of the executed work shall be made on the basis of - (A) PWD schedule of rates (B) As per the ANNEXURE - 2023/2 for non-schedule items (C) List of rates proposed by PWD (Sub Committee) on 27/02/2026 for different electrical works.) | 1 | LOT | 1,20,000 | ₹1,20,000 |
| 2 | Day to day Repairing and Maintenance of electrical fittings and accessories as and when required. Supply of manpower for Repairing and Maintenance of electrical fittings and accessories as and when required with minor maintenance,if required for 274 days for 2 (Two) Shift per day as per direction of EIC.
Shift Duration:-
I) 06:00A.M to 02:00P.M , 02:00 PM. to 10:00PM - ( One Number of Skilled Electrician per shift ) is to be provided by the agency (minimum tools and tackles should be provided by the agency) Electrician ( Skilled)
=(2x274x1 )** { Shift x Days x Man Power} = 548
(RATES ARE INCLUDING 10% AGENCY PROFIT, 18% GST & 1% LABOUR CESS)
N.B. :- Submission of "License to Electrical Contractors" by the Bidder is mandatory. | - | Per Shift per Electrician . | 630.58 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.18 MB
Tendernotice_2.pdf
PDF • 0.41 MB
Tendernotice_3.pdf
PDF • 0.91 MB
BOQ_5104269.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .