Tender Value
₹13.9 L
EMD Value
₹14,000
Closing Date
10 Apr 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer, Salinity Control Division, Porbandar
REPAIRING CHEKDAM ON LOCAL VOKLA AT VILLAGE BHARVADA OF PORBANDAR TALUKA & DISTRICT UNDER SSJA 2026.
290956
49 of 2025-26
Open
Civil Works - Others
Porbandar
10 documents required · 8 mandatory · 2 optional
₹900
Yes
Executive Engineer, Salinity Control Division, Porbandar
₹14,000
Yes
28 Mar 2026
28 Mar 2026
28 Mar 2026
10 Apr 2026
28 Mar 2026
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and
are given to provide a common basis for bidding. The basis of payment will be
the actual quantities of work ordered and carried out, as measured by the
Contractor and verified by the Engineer and valued at the rates and prices
tendered in the priced Bill of Quantities, where applicable, and otherwise at such
rates and prices as the Engineer may fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so
far as it is otherwise provided under the Contract, include all constructional
plant, layout, supervision, materials, erection, maintenance, insurance, profit,
taxes and duties, together with all general risks, liabilities and obligations set out
or implied in the Contract.
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed
to enter a rate or price shall be deemed to be covered by other rates and prices
entered in the Bill of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be
included in the items provided in the priced Bill of Quantities, and where no
Items are provided the cost shall be deemed to be distributed among the rates
and prices entered for the related items of Work.
7. General direction and descriptions of work and materials are not necessarily
repeated or summarized in the Bill of Quantities. References to there levant
sections of the contract documentation shall be made before entering rates or
prices against each item in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the
specification for this work. For building works specifications for building are to
9. Errors will be corrected by the Employer for any arithmetic errors pursuant to
Clause29 of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required
blasting, or the use of metal wedges and sledge hammers, or the use of
compressed air drilling for its removal, and which cannot be extracted by
ripping with a tractor of at least 150kw with a single rear mounted heavy duty
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr.)
Description of Item (with brief Rate
specification and reference to book of Qty Unit (Without
No. (Without GST)
specifications) GST)
1 Dismantling stone/brick masonry &
stacking of useful and unuseful material
from the dismantled materials as
directed etc complete. (a) In cement
2 Excavation In All Sort Of Strata And
Formations Incl. Depositing The
Unuseful Excavated Stuff As And Where
Directed Incl.Sorting And Stacking
Useful Materials In Measurable
Conditions As Directed Upto 200mt
Lead And All Lift Etc. Complete Incl.
(a) In Overburden Incl. Hard Murrum.
3 Drilling 25mm dia holes at distance as
specified and depth upto 3.0mt for check
dam foundation & fixing anchor bars of
specified diameter with cement grout
incl cleaning holes as directed
etc.(excluding cost of bars)
4 Prov. & Laying in position cement
concrete using cement , sand and
crushed metal coarse aggregate by mass
and machine mix for PCC/RCC including
necessary formworks compaction by
vibrator,curing as directed with all lead
& lift etc complete. (Excluding cost of 217.00 Cum 3465.00
steel ) FOR .BODY WALL, APRON,
TRAINING WALL, SIDE WALL, SPLAY
WALL, KEY WALL, CUT OF WALL ETC.
4/E) "NOMINAL MIX" Conc. grade 1:2:4
5 Providing,cutting,bending,binding and
fixing in position as per drawing .TMT
BAR , reinforcement for R.C.C. works and
anchor bars incl cost of black annealed 7.96 MT 76574.00
16 to 18 BWG M.S.. Wire etc.complete
with all lead and lift. (B) Fe-500
Total Amount :-
Total Amount :-
In words (Rupees Thirteen Lac Ninety Thousand Nine Hundred Sixty Eight and Four
I/We am/are willing to carry out the work at….......................% above/below percent (Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Ded ct………% below Add………% Above
In words In words
(B) For Item Rate Tender (For Above INR 50 Cr. )
Description of Item (with brief
specification and reference to Quantity Unit Amount
book of specifications)
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure) ……………………………… By
(C)Net Tendered Amount (A-B) (in figure) ……………………………… EE
1 The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analys`is Standard Cement Consumption has been taken as
per Govt. G.R.: No. MIS 102010/17/K1, dtd. 30/07/2018 as stated in S.O.R. therefore
in R.C.C. items where there is a change as per actual mix design the cost of difference
of cement consumption have been deducted from the rate of original item at the rate
of input rate mentioned in all the tender.
Signature of Contractor Executive Engineer
Salinity Control Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
49 of 2025-26 Tender Notice.pdf
SBD Bharvada Chekdam 13.91.pdf
BOQ Bharvada Chekdam 13.91.pdf
Download all tender documents and submit your bid