Tender Value
₹2 L
EMD Value
₹2,000
Closing Date
10 Jan 2022, 5:00 pmClosed
Superintending Engineer
33/11 KV S/S Hospital Chauraha, Bahraich
Release of Connection to Ms Very Agro and Ms Reliance Jio Infocom under EDD-I, Bahraich
2021_MVVNL_668896_1
81/EDC(B)/2021-22
Open Tender
Electrical Works
Item Rate
90 days
Bahraich
Please Refer Tender Form
3 documents required · 3 mandatory
₹1,180
Superintending Engineer, EDC
₹2,000
19 Feb 2022
31 Dec 2021
11 Jan 2022
31 Dec 2021
10 Jan 2022
31 Dec 2021
Amount
Loading, Unloading and safe cartage of the following materials from Electricity Store Centre, Bahraich to the work site/dump site. All the material at Sl No. 1 shall be given by department and rest all the material including civil material will be arranged by the contractor itself. Any other material if required for completion of work which might not have been mentioned in bid document, shall be arranged by the contractor.
Cartage of ST Pole 11 Mtr. long
Cartage of 11 KV XLPE cable 3x70mm sq.
Cartage of 11 KV XLPE cable 3x120mm sq.
Carriage of other line material
Safe Carriage of 11 KV Pilfer Proof Metering cubical CTR 20/5, 15/5 Amp.
Safe Carriage of 11 KV CT/PT Double Metering Combined Unit CT/PT CTR 20/5, 15/5 AMP
Cartage of Cable Jointing kit
Erection of Double ST Pole (11 Mtr Long) for 11 KV/HT line alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site.
Erection and Grouting of stay sets alongwith complete fittings. Cement, Sand & Brick ballast provided by the contractor at his own cost.
Earthing of Pole as per RESSPO Norms.
Pipe Earthing for Meter Cubical
Grouting of Poles with 1:4:8 CC ratio of cement, sand & brick ballast, backfilling of pits with mud completely. All required materials shall be provided by the contractor at his own cost.
Installation and commissioning of 11 KV Pilfer Proof Metering cubical CTR 20/5, 15/5 Amp.
Installation and commissioning of 11 KV CT/PT Double Metering combined unit CT/PT CTR 20/5, 15/5 AMP
Fixing of Cable Jointing kit
Laying & Commissioning of 11 KV XLPE Cable 3x70mm2 and its hoisting with providing GI pipe 6mm dia (GI Pipe will be supplied by the contractor) including road restoration work as per respo norms.
Laying & Commissioning of 11 KV XLPE Cable 3x120mm2 and its hoisting with providing GI pipe 6mm dia (GI Pipe will be supplied by the contractor) including road restoration work as per respo norms.
SAROJ CONSTRUCTION
M/s S S Associates
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .