| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹50 LAccepted-AOC | ₹50 L | L1 | Accepted-AOC L1 |
| 2 | L2₹50.2 L+₹22,000 (0.44%)Rejected-AOC VILL JOGDOI PO PRATAPKHATA DIST KOKRAJHAR BTC ASSAM DIST KOKRAJHAR PIN 783337 | DHUBRI | ASSAM | 783337 | ₹50.2 L+₹22,000 (0.44%) | L2 | Rejected-AOC L2 |
| 3 | L3₹50.5 L+₹45,980 (0.92%)Rejected-AOC S O SRI MALIN CHANDRA UZIR VILL HATIMATA W NO 8 P O P S KOKRAJHAR DIST CHIRANG BTC ASSAM | KOKRAJHAR | CHIRANG | ASSAM | ₹50.5 L+₹45,980 (0.92%) | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | NANDA SEKHAR UZIR L3 | KUMANTA KUMAR BRAHMA L1 | ACHINTA BASUMATARY L2 |
|---|---|---|---|---|---|---|
| 1.00 | 2.8 Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 2.8.1 All kinds of soil. | 22.99 | Cum | 305.01 ₹7,012.18 Lowest | 305.01 ₹7,012.18 Lowest | 305.01 ₹7,012.18 Lowest |
| 2.00 | 4.1 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level.
4.1.5- 1:3:6 (1 Cement: 3 coarse sand (zone-II): 6 graded stone aggregate 20 mm nominal size). | 4.37 | Cum | 7,265.95 ₹31,752.2 Lowest | 7,265.95 ₹31,752.2 Lowest | 7,265.95 ₹31,752.2 Lowest |
| 3.00 | 5.22 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
5.22.6 Thermo-Mechanically Treated bars of grade Fe-500D or more. | 1,577.31 | Kg | 98 ₹1,54,576.38 | 95.32 ₹1,50,349.19 Lowest | 98 ₹1,54,576.38 |
| 4.00 | 5.22A Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.
5.22A.6 Thermo-Mechanically Treated bars of grade Fe-500D or more. | 657.05 | Kg | 98 ₹64,390.9 | 95.32 ₹62,630.01 Lowest | 95.32 ₹62,630.01 Lowest |
| 5.00 | 5.9 Centering and shuttering including strutting, propping etc. and removal of form for:
5.9.1 Foundations, footings, bases of columns, etc. for mass concrete. | 42.37 | Sqm | 327.44 ₹13,873.63 Lowest | 327.44 ₹13,873.63 Lowest | 327.44 ₹13,873.63 Lowest |
| 6.00 | 5.9.6 Columns, Pillars, Piers, Abutments, Posts and Struts | 59.7 | Sqm | 855.16 ₹51,053.05 Lowest | 855.16 ₹51,053.05 Lowest | 855.16 ₹51,053.05 Lowest |
| 7.00 | 5.9.5 Lintels, beams, plinth beams, girders, bressumers and cantilevers | 142.82 | Sqm | 646.86 ₹92,384.55 Lowest | 646.86 ₹92,384.55 Lowest | 646.86 ₹92,384.55 Lowest |
| 8.00 | 5.1 Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:
5.1.2- 1:1.5:3 (1 cement: 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size). | 13.23 | Cum | 8,893.65 ₹1,17,662.99 Lowest | 8,893.65 ₹1,17,662.99 Lowest | 8,893.65 ₹1,17,662.99 Lowest |
| 9.00 | 6.1 Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:
6.1.1 Cement mortar 1:4 (1 cement : 4 coarse sand) | 30.2 | Cum | 7,317.63 ₹2,20,992.43 Lowest | 7,317.63 ₹2,20,992.43 Lowest | 7,317.63 ₹2,20,992.43 Lowest |
| 10.00 | 2.27 Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 150.84 | Cum | 2,299 ₹3,46,781.16 | 2,298 ₹3,46,630.32 Lowest | 2,298 ₹3,46,630.32 Lowest |
Tender Value
₹50 L
EMD Value
₹1 L
Closing Date
3 Feb 2026, 2:00 pmClosed
The Addl. Chief Engineer cum Director, PWD, BTC
O/o the Addl. Chief Engineer cum Director, PWD, BTC, Kokrajhar
Construction of Jwmwi Club and Library at Bhanugaon village under Anthaibil VCDC in Kokrajhar District.
2026_BTC_50255_7
ACE-25/PWD/IFB/BTC/2025-26/65
Open Tender
Civil Works - Building
Item Rate
180 days
Kokrajhar
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
₹1 L
Yes
2 Jul 2026
14 Jan 2026
3 Feb 2026
14 Jan 2026
3 Feb 2026
14 Jan 2026
14 Jan 2026 - 3 Feb 2026
2.8 Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 2.8.1 All kinds of soil.
4.1 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level. 4.1.5- 1:3:6 (1 Cement: 3 coarse sand (zone-II): 6 graded stone aggregate 20 mm nominal size).
5.22 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. 5.22.6 Thermo-Mechanically Treated bars of grade Fe-500D or more.
5.22A Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. 5.22A.6 Thermo-Mechanically Treated bars of grade Fe-500D or more.
5.9 Centering and shuttering including strutting, propping etc. and removal of form for: 5.9.1 Foundations, footings, bases of columns, etc. for mass concrete.
5.9.6 Columns, Pillars, Piers, Abutments, Posts and Struts
5.9.5 Lintels, beams, plinth beams, girders, bressumers and cantilevers
5.1 Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level: 5.1.2- 1:1.5:3 (1 cement: 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size).
6.1 Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: 6.1.1 Cement mortar 1:4 (1 cement : 4 coarse sand)
2.27 Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.
5.2 Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement: 5.2.2 1:1.5:3 (1 cement: 1.5 coarse sand(zone-III): 3 graded stone aggregate 20 mm nominal size).
4.10 Providing and laying damp-proof course 40mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III): 4 graded stone aggregate 12.5mm nominal size).
6.3 Brick work with common burnt clay machine moulded perforated bricks of class designation 12.5 conforming to IS: 2222 in superstructure above plinth level up to floor five level in cement mortar 1:6 (1 cement: 6 coarse sand) : 6.3.2 With Modular bricks.
10.16 Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. 10.16.1-Hot finished welded type tubes.
Providing & fixing at all heights, levels and locations colour finish Aluminium alloy roofing sheets of alloy IS designation 31500, temper Hx8 conforming to IS 737 and dimensions as per IS code 2676 with characteristics of good formability and corrosion resistance. The profile sheets shall be fixed to truss members in slope or required pitch or curvature with Hex cap headed self drilling/tapping Stainless steel screws M6, 50 mm long with 3 mm EPDM seal washer etc. all inclusive of labour, scaffolding, T&P and sundries etc. complete as per directions of the Engineer-In-Charge. (Cost of truss/frame work shall be paid separately). 12.65.1 0.56 mm, Aluminium Color coated troughed profile with center to center pitch of 200 mm, depth of 32 mm, overall profile width1092 mm, cover width 1000mm.
12.66 Providing and fixing of Pre-coated colour or mill finish Aluminium Roofing Accessories in 0.71 mm thickness Alloy 31500 (IS designation) [Aluminium Alloy (AA) 3004 (ISO designation)] For color, coating shall be 5-7 microns epoxy primer on both sides of the sheet and polyester top coat 15-18 microns, using self drilling/ tapping SS screws of size 6 x 50mm with 3mm thick EPDM seal and SS plain washer complete : 12.66.1 Precoated/mill finish aluminium Ridges plain (500-600mm)
12.66 Providing and fixing of Pre-coated colour or mill finish Aluminium Roofing Accessories in 0.71 mm thickness,Alloy 31500 (IS designation) [Aluminium Alloy (AA) 3004 (ISO designation)] For color, coating shall be 5-7 microns epoxy primer on both sides of the sheet and polyester top coat 15-18 microns, using self drilling/tapping SS screws of size 6 x 50mm with 3mm thick EPDM seal and SS plain washer complete : 12.66.4 Precoated/mill finish aluminium Barge board (Upto 200 mm).
11.5 62 mm thick cement concrete flooring with concrete hardener topping, under layer 50 mm thick cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 20mm nominal size) and top layer 12mm thick cement hardener consisting of mix 1:2 (1 cement hardener mix: 2 graded stone aggregate, 6mm nominal size) by volume, hardening compound mixed @ 2 litre per 50 kg of cement or as per manufacture's specifications. This includes cost of cement slurry, but excluding the cost of nosing of steps etc. complete.
12.45 Providing and fixing false ceiling at all height including providing and fixing of frame work made of special sections, power pressed from M.S. sheets and galvanized with zinc coating of 120 gms/sqm (both side inclusive) as per IS: 277 and consisting of angle cleats of size 25 mm wide x 1.6 mm thick with flanges of 27 mm and 37mm, at 1200 mm centre to centre, one flange fixed to the ceiling with dash fastener 12.5 mm dia x 50mm long with 6mm dia bolts, other flange of cleat fixed to the angle hangers of 25x10x0.50 mm of required length with nuts & bolts of required size and other end of angle hanger fixed with intermediate G.I. channels 45x15x0.9 mm running at the spacing of 1200 mm centre to centre, to which the ceiling section 0.5 mm thick bottom wedge of 80 mm. with tapered flanges of 26 mm each having lips of 10.5 mm, at 450 mm centre to centre, shall be fixed in a direction perpendicular to G.I. Intermediate channel with connecting clips made out of 2.64 mm dia x 230 mm long G.I. wire at every junction, including fixing perimeter channels 0.5 mm thick 27 mm high having flanges of 20 mm and 30 mm long, the perimeter of ceiling fixed to wall/partition with the help of rawl plugs at 450 mm centre, with 25mm long dry wall screws @ 230 mm interval, including fixing of gypsum board to ceiling section and perimeter channel with the help of dry wall screws of size 3.5 x 25 mm at 230 mm c/c, including jointing and finishing to a flush finish of tapered and square edges of the board with recommended jointing compound, jointing tapes, finishing with jointing compound in 3 layers covering upto 150 mm on both sides of joint and two coats of primer suitable for board, all as per manufacturer's specification and also including the cost of making openings for light fittings, grills, diffusers, cutouts made with frame of perimeter channels suitably fixed, all complete as per drawings, specification and direction of the Engineer in Charge but excluding the cost of painting with : 12.45.1 12.5 mm thick tapered edge gypsum plain board conforming to IS: 2095- (Part 1):2011 (Board with BIS certification marks).
13.2 15 mm cement plaster on the rough side of single or half brick wall of mix: 13.2.1- 1:4 (1 cement: 4 fine sand)
11.6 Cement plaster skirting up to 30 cm height, with cement mortar 1:3 (1cement: 3 coarse sand), finished with a floating coat of neat cement. 11.6.1-18 mm thick.
21.1 Providing and fixing aluminium work for doors, windows, ventilators and partitions with extruded built up standard tubular sections/appropriate Z sections and other sections of approved make conforming to IS: 733 and IS: 1285, fixing with dash fasteners of required dia and size, including necessary filling up the gaps at junctions, i.e. at top, bottom and sides with required EPDM rubber/ neoprene gasket etc. Aluminium sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminium snap beading for glazing / paneling, C.P. brass/stainless steel screws, all complete as per architectural drawings and the directions of Engineer-in-charge. (Glazing, paneling and dash fasteners to be paid for separately):
21.3 Providing and fixing glazing in aluminium door, window, ventilator shutters and partitions etc. with EPDM rubber/ neoprene gasket etc. complete as per the architectural drawings and the directions of engineer-in-charge. (Cost of aluminium snap beading shall be paid in basic item): 21.3.2 With float glass panes of 5 mm thickness (weight not less than 12.50 kg/sqm).
9.48 Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. 9.48.2 Fixed to openings /wooden frames with rawl plugs screws etc.
9.1 Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length (hold fast lugs or dash fastener shall be paid for separately). 9.1.1 Second class teak wood
9.9 Providing and fixing glazed shutters for doors, windows and clerestory windows using 4 mm thick float glass panes, including ISI marked M.S. pressed butt hinges bright finished of required size with necessary screws. 9.9.1 Second class teak wood 9.9.1.1 35 mm thick.
13.26 Providing and applying plaster of paris putty of 2 mm thickness over plastered surface to prepare the surface even and smooth complete.
13.41 Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade: 13.41.1 New work (two or more coats) over and including water thinnable priming coat with cement primer.
13.46 Finishing walls with Acrylic Smooth exterior paint of required shade 13.46.1 New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @2.20 kg/10 sqm)
4.17 Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement: 3 coarse sand (zone III): 6 graded stone aggregate 20 mm nominal size) over 75mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand, Including necessary excavation, levelling & dressing & finishing the top smooth.
BOUNDARY WALL 2.8 Work in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains (not exceeding in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the ated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 3.1 All Kinds of soil.
4.1 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to -1:2:4 (1 cement: 2 coarse sand (zone-III): 4 graded stone aggregate 20 mm nominal size).
5.22 Steel reinforcement for RCC work including straightening, cutting, bending, placing in Position and binding all complete upto plinth Thermo-Mechanically Treated bars of grade Fe-500D or more.
5.9 Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete
Lintels, beams, plinth beams, girders, bressumers and cantilevers.
Columns, Pillars, Piers,Abutments, Posts and Struts.
5.1 Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, ing and reinforcement - All work up to plinth level: 1:1.5:3 (1 cement: 1.5 coarse sand (zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived natural sources).
5.2 Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, ins, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, ng and reinforcement: 1:1.5:3 (1 cement: 1.5 coarse sand(zone-III): 3 graded stone aggregate 20 mm nominal size).
6.1 Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: 6.1.1 Cement mortar 1:4 (1 cement : 4 coarse sand).
6.3 Brick work with common burnt clay machine moulded perforated bricks of class designation 12.5 conforming to IS: 2222 in tructure above plinth level up to floor five level in cement mortar 1:6 (1 cement : 6 coarse sand) : With Modular bricks
13.5 15mm cement plaster on rough side of single or half brick wall of mix: 5.1:-1:4 (1 cement: 4 coarse sand).
13.43 Proving one coat of water thinnable cement primer of approved brand and manufacture on wall surface: Water thinnable cement primer.
13.48 Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: 13.48.1 Two or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of Special primer applied @ 0.75 ltr/10 sqm
GATE 10.25 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 10.25.2 In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.
2.6 Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10sqm on plan) including getting out and disposal of excavated earth leadupto 50 m and lift upto 1.5m, as directed by Engineer-in- charge. 2.6.1 All kinds of soil.
4.1.5 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:3:6 (1 Cement: 3 coarse sand (zone-III): 6 graded stone aggregate 20 mm nominal size).
5.22 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. 5.22.6 Thermo-Mechanically Treated bars of grade Fe-500D or more.
5.9 Form Work 5.9.5 Lintels, beams, plinth beams, girders, bressumers and cantilevers.
5.9 Form Work 5.9.6 Columns, Pillars, Piers, Abutments, Posts and Struts.
5.1 Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level: 5.1.2 1:1.5:3 (1 cement : 1.5 coarse sand (zone-II): 3 graded stone aggregate 20 mm nominal size).
5.2 Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement: 5.2.2 1:1.5:3 (1 cement: 1.5 coarse sand(zone-III): 3 graded stone aggregate 20 mm nominal size).
13.5 15 mm cement plaster on rough side of single or half brick wall of mix: 13.5.1 1:4 (1 cement: 4 coarse sand).
13.44 Finishing walls with water proofing cement paint of required shade: 13.44.1 New work (Two or more coats applied @ 3.84 kg/10 sqm)
13.46 Finishing walls with Acrylic Smooth exterior paint of required shade: 13.46.1 New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied.
DISMANTLE 15.2 Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer-in-charge. 15.2.1 Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix).
2.33 Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. 2.33.4 Above 240 cm girth.
2.31 Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared.
FURNITURE Chair (Plastic with arm rest of Nilkamal, etc.)
Chair (Plastic with Cushion of Nilkamal, etc.)
Steel Almirah full height (Large Size & Finish Colour)
Steel Office Table
Sofa Set (3+1+1)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
SBD.pdf
Tender Documents • 3.02 MB
BOQ_80066.xls
BOQ • 0.29 MB
FOB.pdf
Additional Documents • 0.80 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .