| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹84.8 LAccepted-AOC | L1 | Accepted-AOC Lowest Bidder | |
| 2 | L2₹87.9 L+₹3.1 L (3.69%)Rejected-AOC | L2 | Rejected-AOC WO issued to lowest bidder | |
| 3 | L3₹88.6 L+₹3.9 L (4.55%)Rejected-AOC | L3 | Rejected-AOC WO issued to lowest bidder | |
| 4 | L4₹93.1 L+₹8.3 L (9.85%)Rejected-AOC | L4 | Rejected-AOC WO issued to lowest bidder | |
| 5 | L5₹93.4 L+₹8.6 L (10.2%)Rejected-AOC | L5 | Rejected-AOC WO issued to lowest bidder |
| Sl No | Description | Qty | Unit | M.K.MOIDEEN L3 | Praveen T.T L4 | SABU SEBASTIAN L5 | Mountcarve Projects LLP L2 | M M SULAIMAN L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed. all kinds of soil | 400 | m3 | 215 ₹86,000 | 260 ₹1,04,000 | 263 ₹1,05,200 | 150 ₹60,000 Lowest | 193 ₹77,200 |
| 2.00 | Providing and laying in position Cement, Concrete of specified grade excluding the cost of centering and shuttering - All works up to plinth level: 1:4:8 (1 Cement: 4 coarse sand: 8 graded aggregate 40mm nominal size) compacting, curing etc. complete | 50 | m3 | 6,500 ₹3,25,000 | 6,500 ₹3,25,000 | 6,970 ₹3,48,500 | 7,260 ₹3,63,000 | 6,340 ₹3,17,000 Lowest |
| 3.00 | Dry rubble masonry for foundation and basement including cost of all materials, conveyance, labour charges, etc. complete as per specificationsusing contractor's rubble. | 220 | m3 | 3,550 ₹7,81,000 Lowest | 4,000 ₹8,80,000 | 4,216 ₹9,27,520 | 4,110 ₹9,04,200 | 4,900 ₹10,78,000 |
| 4.00 | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with cement mortar1:6.(1 cement : 6 coarse sand) | 690 | m3 | 5,250 ₹36,22,500 Lowest | 6,500 ₹44,85,000 | 6,970 ₹48,09,300 | 5,820 ₹40,15,800 | 6,340 ₹43,74,600 |
| 5.00 | Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 100 | m2 | 375 ₹37,500 | 400 ₹40,000 | 382 ₹38,200 | 303 ₹30,300 Lowest | 350 ₹35,000 |
| 6.00 | Steel reinforcement for RCC work including straightening cutting bending placing in position and binding all complete TMT bars of grade Fe 500 D or more | 5,000 | kg | 95 ₹4,75,000 | 95 ₹4,75,000 | 107 ₹5,35,000 | 87 ₹4,35,000 Lowest | 100 ₹5,00,000 |
| 7.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 55 | m3 | 8,500 ₹4,67,500 | 9,500 ₹5,22,500 | 8,125 ₹4,46,875 Lowest | 8,700 ₹4,78,500 | 8,200 ₹4,51,000 |
| 8.00 | PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete. | 550 | m | 150 ₹82,500 | 175 ₹96,250 | 129 ₹70,950 | 110 ₹60,500 Lowest | 135 ₹74,250 |
| 9.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 425 | m3 | 250 ₹1,06,250 | 325 ₹1,38,125 | 200 ₹85,000 | 123 ₹52,275 Lowest | 245 ₹1,04,125 |
| 10.00 | Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing | 540 | m2 | 340 ₹1,83,600 | 300 ₹1,62,000 | 470 ₹2,53,800 | 204 ₹1,10,160 Lowest | 310 ₹1,67,400 |
Tender Value
₹1.1 Cr
EMD Value
₹50,000
Closing Date
15 Sept 2025, 3:00 pmClosed
Executive Engineer
Executive Engineer Transmission Division Kerala State Electricity Board Ltd. Poovanthuruth P.O, PIN-686012
Upgradation of 66kV Substation Changanassery to 110kV - Site leveling and construction of retaining wall
2025_KSEB_789441_1
TDP/e-tender 07/2025-26/20.08.2025
Open Tender
Civil Works - Others
Item Rate
180 days
66kV Substation, Changanassery
Please refer Tender documents.
11 documents required · 11 mandatory
₹5,900
Yes
₹50,000
12 Dec 2025
22 Aug 2025
17 Sept 2025
22 Aug 2025
15 Sept 2025
22 Aug 2025
22 Aug 2025 - 11 Sept 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .