Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹46.4 LAdmitted-Finance 8 BECK BAGAN ROW SUCCESS CENTRE 8 BECK BAGAN ROW BECK BAGAN KOLKATA WEST BENGAL 700017 | KOLKATA | WEST BENGAL | 700017 | ₹46.4 L | L1 | Admitted-Finance |
| 2 | L2₹50.2 LAdmitted-Finance 113 1 PARAHUPUR MUGHALSARAI CHANDAULI VARANASI UTTAR PRADESH INDIA 232101 | CHANDAULI | UTTAR PRADESH | 232101 | ₹50.2 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Creative Communication L2 | VICOM SECURITY PVT LTD L1 |
|---|---|---|---|---|---|
| 10.00Supply Part | |||||
| 10.00 | 12x10/100/1000 TX+2X1G SX L2 Eth Switch | 15 | NO | 85,000 ₹15.0 L | 30,000 ₹5.3 L |
| 10.00 | RF Antenna with all Accessories | 3 | PAA | 1,28,000 ₹4.5 L | 72,000 ₹2.5 L |
| 10.00 | ADSS 12 Core SM OFC | 3,000 | M | 51 ₹1.8 L | 50.4 ₹1.8 L |
| 10.00 | 27U Rack with accessories | 4 | NO | 55,000 ₹2.6 L | 42,000 ₹2.0 L |
| 10.00 | 9U Rack with accessories | 8 | NO | 10,000 ₹94,400 | 6,600 ₹62,304 |
| 10.00 | Single Mode SFP Module - 1G LC type | 15 | NO | 4,650 ₹82,305 | 2,000 ₹35,400 |
| 10.00 | 2 KVA On-line UPS with 01 hrs backup | 6 | NO | 65,500 ₹4.6 L | 90,000 ₹6.4 L |
| 10.00 | 1 KVA Line Int UPS with 15 min backup | 6 | NO | 6,800 ₹48,144 | 8,040 ₹56,923.20 |
| 10.00 | 24 Port Fully Loaded LIU | 2 | NO | 7,200 ₹16,992 | 7,440 ₹17,558.40 |
Updated dates
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
16 Apr 2026, 3:00 pmClosed
DGM C AND M OPG 2
NTPC Limited 9 th Floor Tower C Commercial Complex Plot No C 03 Central Business District CBD Sector 21 Atal Nagar Nava Raipur Pin Code 492018
Supply Installation, Testing and Commissioning SITC of ITI nfrastructure and Networking Equipment for CLIMS at TVHPP
2026_NTPC_105962_1
NTPC/USSC-CPG2/9900321427
Limited
Miscellaneous Works
1975 days
TVHPP Project Tapovan Vishnugad Hydro Power
3 documents required · 3 mandatory
₹0
₹50,000
16 Jun 2026
11 Mar 2026
17 Apr 2026
11 Mar 2026
16 Apr 2026
11 Mar 2026
11 Mar 2026 - 13 Mar 2026
Supply Part
12x10/100/1000 TX+2X1G SX L2 Eth Switch
RF Antenna with all Accessories
ADSS 12 Core SM OFC
27U Rack with accessories
9U Rack with accessories
Single Mode SFP Module - 1G LC type
2 KVA On-line UPS with 01 hrs backup
1 KVA Line Int UPS with 15 min backup
24 Port Fully Loaded LIU
12 Port Fully Loaded LIU
02core-OFC to TX convertors with adapter
UTP Cable Armored-Cat6 04 Pair-305 Meter
SM LC-LC Fiber Patch cords-3 Meter
9 Meter ISI MS Pole
OFC Clamping Accessories for Poles
4 CH DVR with 4 FHD Cameras and 2TB HDD
Installation and Commissioning
Erection of 9 meter ISI MS Pole
Overhead Laying of OFC through Poles
Laying of OFC/UTP through Walls/Fence
Installation and Commissioning
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.72 MB
TenderDoc.rar
Tender Documents • 19.31 MB
BOQ_109194.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid