Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAdmitted-Finance | ₹1.9 L | L1 | Admitted-Finance |
| 2 | L2₹2.0 L+₹12,545 (6.76%)Admitted-Finance | ₹2.0 L+₹12,545 (6.76%) | L2 | Admitted-Finance |
| 3 | L3₹2.0 L+₹15,645 (8.43%)Admitted-Finance | ₹2.0 L+₹15,645 (8.43%) | L3 | Admitted-Finance |
| 4 | L4₹2.1 L+₹25,655 (13.8%)Admitted-Finance | ₹2.1 L+₹25,655 (13.8%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | K J JOSE L3 | LIJO V O L2 | K M MOHAMMED ISMAIL L1 | RINO JOHN L4 |
|---|---|---|---|---|---|---|---|
| 1.00Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. | |||||||
| 1.01 | Beyond 30 cm girth up to and including 60 cm girth | 1 | Nos | 3,000 ₹3,000 | 750 ₹750 Lowest | 1,000 ₹1,000 | 1,000 ₹1,000 |
| 2.00Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | |||||||
| 2.01 | a)1:2:4 (1 cement : 2 coarse sand(zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.9 | Cum | 10,000 ₹19,000 Lowest | 10,000 ₹19,000 Lowest | 10,000 ₹19,000 Lowest | 10,000 ₹19,000 Lowest |
| 3.00Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : | |||||||
| 3.01 | b)1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.6 | Cum | 12,000 ₹19,200 | 12,000 ₹19,200 | 12,000 ₹19,200 | 10,500 ₹16,800 Lowest |
| 4.00Centering and shuttering including strutting, propping etc. and removal of form for | |||||||
| 4.01 | a)Lintels, beams, plinth beams, girders, bressumers and cantilevers | 7 | Sqm | 500 ₹3,500 Lowest | 750 ₹5,250 | 700 ₹4,900 | 865 ₹6,055 |
| 4.02 | b) Columns, piers, abutments, pillars, posts and struts. | 9 | Sqm | 500 ₹4,500 Lowest | 900 ₹8,100 | 750 ₹6,750 | 1,000 ₹9,000 |
| 5.00Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. | |||||||
Tender Value
₹2.2 L
EMD Value
₹4,351
Closing Date
24 Jun 2026, 6:00 pmClosed
Executive Engineer
BSNL Civil Division, BSNL Centre Post office road Thrissur
Providing Chain Link Fencing to the collapsed portion of compound wall at TE compound Wadakkanchery
2026_BSNL_280973_1
5/EE/BSNL/TCR/2026-27
Open Tender
Civil Works
Works
30 days
Wadakkanchery
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
AO BSNL Thrissur
₹4,351
17 Jul 2026
16 Jun 2026
26 Jun 2026
16 Jun 2026
24 Jun 2026
16 Jun 2026
16 Jun 2026 - 24 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. | |||||
| 1.01 | Beyond 30 cm girth up to and including 60 cm girth | 1 | Nos | 100 | ₹100 |
| 2Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | |||||
| 2.01 | a)1:2:4 (1 cement : 2 coarse sand(zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.9 | Cum | 10 | ₹19 |
| 3Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : | |||||
| 3.01 | b)1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.6 | Cum | 10 | ₹16 |
| 4Centering and shuttering including strutting, propping etc. and removal of form for | |||||
| 4.01 | a)Lintels, beams, plinth beams, girders, bressumers and cantilevers | 7 | Sqm | 10 | ₹70 |
| 4.02 | b) Columns, piers, abutments, pillars, posts and struts. | 9 | Sqm | 10 | ₹90 |
| 5Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. | |||||
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.68 MB
BOQ_327927.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .