Executive Engineer, N.P. Main Canal Division No. 19, Harij
CONNECTING VILLAGE/TANK DRAIN WITH NARMADA CANAL NETWORK UNDER JURIDICTION OF NPMC DIVISION NO.19, HARIJ. (Phase-2)
288348
20 of 2025-26
Open
Civil Works - Canal
Works
Patan
9 documents required · 8 mandatory · 1 optional
₹4,248
Yes
Executive Engineer, N.P.Main Canal Division No. 19, Harij
₹1.6 L
Yes
20 Mar 2026
20 Mar 2026
20 Mar 2026
9 Apr 2026
20 Mar 2026
BILL OF QUANTITIES
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and are
given to provide a common basis for bidding. The basis of payment will be the
actual quantities of work ordered and carried out, as measured by the Contractor
and verified by the Engineer and valued at the rates and prices tendered in the
priced Bill of Quantities, where applicable, and otherwise at such rates and prices
as the Engineer may fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so
far as it is otherwise provided under the Contract, include all constructionalplant,
layout, supervision, materials, erection, maintenance, insurance, profit, taxes and
duties, together with all general risks, liabilities and obligations set out or implied
in the Contract.
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed
to enter a rate or price shall be deemed to be covered by other rates and prices
entered in the Bill of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included
in the items provided in the priced Bill of Quantities, and where no Items are
provided the cost shall be deemed to be distributed among the rates and prices
entered for the related items of Work.
7. General direction and descriptions of work and materials are not necessarily
repeated or summarized in the Bill of Quantities. References to the relevant
sections of the contract documentation shall be made before entering rates or
prices against each item in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the
specification for Road and Bridge works. For building works specifications for
building are to be followed.
9. Errors will be corrected by the Employer for any arithmetic errors pursuant to
Clause 29 of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required
blasting, or the use of metal wedges and sledgehammers, or the use of compressed
air drilling for its removal, and which cannot be extracted by ripping with a tractor
of at least 150 kw with a single rear mounted heavy duty ripper.
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr. )
Name of Division: Executive Engineer N.P.M.C Division No. 19, Harij
Name of work :- Connecting Village tanks/drains with Distry & Minors of Rajpura Branch Canal
(Phase-II) Year 2025-26.
Item Description Unit Rate in Rs. Amount in Rs.
Dismanting of C.C. \ R.C.C. Lining from Canal
bed and slope including removing all
dismantied concrete outside the canal and
stacking the same as and where directed
within a lead at 200 mt etc complete Lift
Providing & laying 10 cms thick cast in situ C.C.
1:2:4 grade with the use of crushed aggregates
for canal ling works incl. use of all equipments,
scaffolding, centering form work etc, with
finishing as required to the exposed surface,
making asphalt joints as directed & watering &
curing (without sleepers) with all lead and lifts
Intake Square well (Height as per design)
including excavation, GI Strainer, Ladder,
Flange, RCC connecting structure, Back filling,
Earthwork in embankment, compaction of
earthwork in embankment etc complete as per
approved drawing.
Height of Well = 3.00 m 14.00 No. 122698.00
Height of Well = 3.50 m 1.00 No. 133273.00
Height of Well = 4.00 m 1.00 No. 142511.00
PIPE LINE Providing, supplying, laying &
lowering in standard length ISI mark rigid
unplasticised PVC pipes suitable for potable
water with ringfit, joint including Excavation,
Site Clearing, cost of rings , all local and central
taxes. laying, jointing, fitting materials (Tee,
Reducer, Bend) and testing un-plasticized PVC
pipes & specials of following class and
diameter including cost of conveyance from
stores to site of work, labour hydraulic testing
including cost of cement solvent and back
filling trench with excavated stuff of soil or
selected soil etc complete. A) One coupler/ring
shall be provided with each full lengh pipe cost
of which is included in rates below.(Work
pressure 4kg/cm2) 315 mm dia (UPVC)
Providing, Supplying, Laying & Fixing in
position under ground R.C.C. hume pipes of NP
3 class as per I.S. specification of prescribed
diameter incl. filling the joints & providing &
fixing necessary collars with cement mortar
5. 1:1 inclusive of testing for leakage & working
pressure as directed with all cost of materials
& labour for all leads & lifts etc complete.
600mm Dia 25.00
Providing, supplying and lowering and laying
Separate C.I. Air valves including its
excavation, concrete structure, steel, jointing
material, including nut bolts and giving
satisfactory hydraulic testing, etc complete as
per approved drawing, approved quality of
6. following class and dia. Including all taxes, No.
insurance, transportation, freight charges,
octroi, inspection charges loading, unloading,
conveyance to site of work, stacking, etc.
complete.etc.Air valves Double Acting ( DS-2)
Outlet well (Height as per design) including
excavation, Back filling, Earthwork in
embankment, compaction of earthwork in
embankment, Reinforcement, etc. complete as 16.00 85571.000
I/We am/are willing to carry out the work at… ...................... % above/below percent (Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
(B) For Item Rate Tender (For above INR 50 Cr.):
Item Description of Item Quantity Unit Rate Amount
No (with brief specification
and reference to book of In In
specifications) figures Words
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure) ………………………………
(C)Net Tendered Amount (A-B) (in figure) ………………………………
1 The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt. G.R.: CE(QC)/PB/Mix Design/04/2024 Date:20/01/2024 as stated in
S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost
of difference of cement consumption have been deducted from the rate of original item
at the rate of input rate mentioned in all the tender.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
NIT Tank connectivity.pdf
BOQ_tank connection _phase-II.pdf
SBD ForTank Connecting_phase-II.pdf
Tank Connection Item Specification_phase-II.pdf
Typical drawing.pdf
Rajpura jurisdiction.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .