Tender Value
₹84 L
EMD Value
₹1.5 L
Closing Date
2 Sept 2026, 6:00 pm
SHRI SAURABH, IDSE, CWE
HQ CWE Tenga PIN - 900199 C/o 99 APO
REPLACEMENT OF OIL FIRED INCINERATOR AT 180 MIL HOSP MISSAMARI
2026_MES_776568_2
8639/E8
Open Tender
Civil Works
Item Rate
180 days
GE Missamari
C, c (iv)
8 documents required · 8 mandatory
₹1,000
Yes
GE MISSAMARI
₹1.5 L
Yes
19 Aug 2026
19 Aug 2026
9 Sept 2026
19 Aug 2026
2 Sept 2026
26 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of existing unserviceable incinerator of capacity 50 kg/hr, including disconnection of all electrical connections, fuel lines, chimney/flue connections and other allied components, carefully without causing damage to reusable parts. The work includes dismantling of complete unit such as combustion chamber, outer casing, blower, control panel, chimney, foundation bolts, etc., loading, transporting and depositing the dismantled materials to MES yard/store within specified lead, including unloading, stacking and handing over to store authorities, complete all as specified and as directed. | 1 | Each Job | 100 | ₹100 |
| 2 | Design, Supply, installation, testing and commissioning of oil fired incinerator for Bio-medical waste having 50 Kg/Hr burning capacity comprising of primary chamber, secondary chamber, Automatic waste feeding system, oil burners, FD fan, interconnecting ducts, emergency ducts, cyclone separators, quencher, venturi scrubber, droplet separator, water recirculation tank, packed bed scrubber, mist eliminator, active carbon filter, ID fan, fuel tank, control panel, min 30 mtr high chimney, online continuous emmission system, ZLD ETP monitoring and any other equipment/plant/sensors/ gauges/PLCs/ wirings/earthings /Aviation light on chimney etc. incuding Air pollution control system and devices so as to comply latest CBCB guidelines and Bio-Medical Waste Management rules-2016 amended up-to-date. Detailed scope of work along with specifications and compliance requirments in detail are given in Particular Spacifications forming part of this tender documents.
Notes:-
1. Within 45 days after placement of work order, The contractor has to submit equipment blueprints, plant layout considering existing Incinerator and P&I diagrams of the Incinerator fully in compliance with CPCB/SPCB guide lines for approval of the GE.
2. The cost of necessary civil work including foundation work required for all the subsystems of the Incinerator is deemed to be included in the quoted rates of Incinerator at BOQ item No-2.
3. Incinerator room of size 7.95m X 5.95m exists at site. Various sub-systems of the incinerator which are supposed/designed to be inside shall be installed inside the room. Any electrical equipment / control panel installed outside shall have IP 65 protection & will be installed under rain shed & cost of the same is deemed to be included in quoted rates.
4. One main LT Panel to be installed at site along with LT cable charging it are part of BOQ and will be measured & paid separately. Any cabling/wiring beyond this main LT Panel, other LT panels & control panels specifically required for the incinerator is deemed to be included in quoted rates. Such cabling/wiring shall be of copper.
5. Water Supply pipeline upto & including PVC Tank of capacity 4000 Ltr to be installed at site are part of BOQ and will be measured & paid separately. Any water supply distribution network beyond this PVC tank for the purpose of Incinerator is deemed to be included in quoted rates.
6. Any other piping or wiring work required between various parts of the Incinerator or any other balance of item technically required to make the Incinerator fully functional required to get ‘Consent To Operate (CTO)’ from State Pollution Control Board (SPCB) is deemed to be included in quoted rates.
7. With respect to prevailing rules/regulations & If required by the GE, ‘Consent To Establish (CTE)’ has to be obtained by the contractor from concerned state Department before start of execution of work. ‘Consent To Operate (CTO)’ upto the period of DLP (minimum) has to be obtained by the contractor from concerned state Department (SPCB) before testing & commissioning and issue of completion certificate of the contract. Any fee and other incidental cost to obtain CTE & CTO is to be paid by the contractor and it is deemed to be included in quoted rates. Any letter, if required, to make liaison with concerned State Dept by the contractor, may be issued by the GE. | 1 | Each Job | 191 | ₹191 |
| 3 | M&L for Earthing complete with Copper earth plate electrode (600 x 600 x 3.15 mm) thick buried directly in ground earth pit not less than 2.25 mtr deep below normal ground level with top edge of the plate not less than 1.5 mtr below ground level connected to galvanized iron strip (20 x 3 mm) as earthing lead by mean of nut/bolt and washer of galvanized iron or steel drawn through 40 mm dia light grade GI pipe as shown in electrical plate no 3 of SSR part I of 2009 including necessary excavation and earth work GI pipe 20mm dia light grade for watering PCC chamber with PCC cover in cement concrete (1:3:6) Type B1(20mm graded aggregate), funnel, wire mesh, charcoal dust, salt etc, connected to panel board / Gen Set as indicated including testing complete all as specified and as directed. | 4 | Each | 192 | ₹768 |
| 4 | Supply and fixing Copper strip (20 x 3.15 mm) with saddles and fixing screws etc.for roof conductors and down conductors above ground complete all as specified and as directed. | 15 | RM | 193 | ₹2,895 |
| 5 | Supply, laying and testing Tubes, 'Medium Grade' galvanised, 25 mm bore with all fittings; laid in trenches, complete all as specified and as directed. | 25 | RM | 194 | ₹4,850 |
| 6 | S&F in repair, 25 mm bore Gun-metal, globe or gate valves, with iron wheel head, screwed both ends for iron pipe and fixed complete all as specified and as directed. | 2 | Each | 195 | ₹390 |
| 7 | S&F for 4000 Litres Rotational moulded polythylene water storage tanks (cylindrical vertical with closed top) hoisted and fixed in position all as specified complete all as specified and as directed. | 1 | Each | 196 | ₹196 |
| 8 | Excavation in trenches, not exceeding 1.5 m wide and not exceeding 1.5 m in depth for foundations etc, or for shafts, wells, cesspits, man holes, pier holes etc not exc 10 sq m on plan and getting out in soft/loose soil complete all as specified and as directed. | 47.52 | Cum | 197 | ₹9,361.44 |
| 9 | Returning, filling in including spreading, levelling, watering and well ramming in layers not exceeding
25 cm in soft/ loose soil complete all as specified and as directed. | 13.15 | Cum | 198 | ₹2,603.7 |
| 10 | Removing excavated materials (soil) not exceeding 50 m and depositing where directed at a level not exceeding 1.5 m above the starting point complete all as specified and as directed. | 32.91 | Cum | 199 | ₹6,549.09 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
BOQ_879978.xls
BOQ • 1.58 MB
TENDERDOCUMENT8639.pdf
Tender Documents • 2.14 MB
Corrigendum02.pdf
PDF • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].